City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Bowling Green,
KY Warren Co. United States |
Frist Blvd. / Golden Autumn Way (36.96509, -86.40386) |
Other Existing |
All-Way Yield None |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Lane change required to make left turn. |
Rogers,
AR Benton Co. United States |
S Pinnacle Hills Pkwy. / W JB Hunt Dr. (36.30245, -94.18936) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2023 | Yield-controlled right-turn bypass lanes on north and south legs. https://www.youtube.com/watch?v=fxI71JbGsVk |
Rogers,
AR Benton Co. United States |
S Pinnacle Hills Pkwy. / S Champions Dr. (36.30103, -94.18902) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=fxI71JbGsVk |
Richmond Hill,
GA Bryan Co. United States |
GA 144 / Belfast River Rd. / Captain Matthew Freeman Dr. (31.88082, -81.26192) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Yield-controlled right-turn bypass lanes on north, east, and south legs included in permanent construction. Initial construction 2015 as temporary roundabout; permanent construction completed 2022. |