City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Stanley Bridge,
PE Queens Canada |
PE-6 / St Marys Rd. / Cavendish Rd. / Rattenbury Rd. (46.46131, -63.45422) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 16.4541 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2015 | ICD estimated from Google Maps linework. |
Mount Stewart,
PE Kings Canada |
Baldwins Rd. (PE-22) / 48th Rd. (PE-5) (46.25586, -62.73251) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 23.9484 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Bolton,
ON Peel Canada |
King St. / Emil Kolb Pkwy. (43.87639, -79.76189) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.4895 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Bolton,
ON Peel Canada |
ON Hwy 50 / Emil Kolb Pkwy. (43.89884, -79.76481) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 56.7990 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Kingston,
ON Frontenac Canada |
Centennial Dr. / Venture Dr. (44.27265, -76.55935) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.6137 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Kingston,
ON Frontenac Canada |
Cataraqui Woods Dr. / Woodhaven Dr. (44.26739, -76.59501) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 24.8022 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Kingston,
ON Frontenac Canada |
Cataraqui Wood Dr. / Holden St. (44.26729, -76.58991) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 23.9470 |
Other (At-Grade) Single-Lane |
2013 | ICD estimated from Google Maps linework. |
Kelowna,
BC Central Okanagan Canada |
Water St. / Doyle Ave. (49.88897, -119.49660) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 25.3925 |
Other (At-Grade) Single-Lane |
2017 | ICD estimated from Google Maps linework. |
Kelowna,
BC Central Okanagan Canada |
Water St. / Queensway Transit Exchange (49.88734, -119.49663) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 31.5494 |
Other (At-Grade) Single-Lane |
2014 | Running Man statue in central island. ICD estimated from Google Maps linework. |
Kelowna,
BC Central Okanagan Canada |
Valley Rd. / Longhill Rd. / Cross Rd. (49.92019, -119.43406) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 16.9174 |
Other (At-Grade) Single-Lane |
2016 | Elliptical shape. ICD estimated from Google Maps linework. |
Winkler,
MB Division 3 Canada |
Roblin Blvd. W / 15th St. (49.19050, -97.95600) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.pembinavalleyonline.com/local/new-date-set-for-opening-of-15th-street-roundabout-in-winkler |
Portage la Prairie,
MB Division 9 Canada |
Royal Rd. S / Crescent Rd. (49.96855, -98.29062) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2021 | Right-turn bypass lanes on southwest and southeast legs. https://www.youtube.com/watch?v=7CzYNrFk0uY. |
Portage la Prairie,
MB Division 9 Canada |
Royal Rd. S / Mayfair Farms Rd. (49.96672, -98.29230) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.youtube.com/watch?v=7CzYNrFk0uY. |
Midland,
ON Simcoe Canada |
County Rd. 93 / Golf Link Rd. / Vindin St. (44.74914, -79.92691) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | https://www.simcoe.ca/TransportationEngineering/Pages/county-road-93-roundabout-project.aspx |
London,
ON Middlesex Canada |
Hyde Park Rd. / Sunningdale Rd. (43.02185, -81.34493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | https://london.ctvnews.ca/roundabout-at-hyde-park-and-sunningdale-reopens-to-traffic-1.5654480 |
Pictou,
NS Pictou Canada |
Granton Abercrombie Rd. / Trenton Connector (45.61887, -62.66479) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2021 | https://www.facebook.com/AbercrombieVarietyVideo/posts/trenton-connector-roundabout-is-doneno-more-delays-due-to-construction-/4991664280885637/ |
Qualicum Beach,
BC Nanaimo Canada |
Hwy 19A / Memorial Ave. (49.35605, -124.43944) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2021 | https://nanaimonewsnow.com/2021/12/01/roundabout-at-key-qualicum-beach-intersection-poised-to-open/ |
Antigonish,
NS Antigonish Canada |
Old Hwy 104 / Beech Hill Rd. (45.61335, -61.97107) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Single-Lane |
2020 | Previous control: 3-way stop. Year Completed estimated (2019-2021). |
Richmond Hill,
ON York Canada |
York Blvd. / (parking) (43.84765, -79.37604) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Richmond Hill,
ON York Canada |
York Blvd. / (parking) (43.84703, -79.37710) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Red Deer County,
AB Division 8 Canada |
MacKenzie Rd. / Lexa Ave, / Hwy 2 SB Ramps (52.20126, -113.81739) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/ |
Red Deer County,
AB Division 8 Canada |
McKenzie Rd. / Gasoline Alley E / Hwy 2 NB Off-Ramp (52.20130, -113.81247) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://rdnewsnow.com/2021/10/28/mckenzie-road-roundabouts-now-open/ |
Regina,
SK Division 6 Canada |
Research Dr. (50.41278, -104.59053) |
Other Existing |
Unknown Unknown |
2 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
Parking along circulatory roadway. | |
Regina,
SK Division 6 Canada |
(unknown) (50.41660, -104.64649) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Milton,
ON Halton Canada |
Louis St Laurent Ave. / Kennedy Cir. (southwest end) / (future road) (43.50490, -79.83937) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | Year Completed estimated (2018-2021). |
Milton,
ON Halton Canada |
Louis St Laurent Ave. / Kennedy Cir. (northeast end) / (future road) (43.50807, -79.83568) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | Year Completed estimated (2018-2021). |
Regina,
SK Division 6 Canada |
20th Ave. / Rae St. (50.43330, -104.62110) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Regina,
SK Division 6 Canada |
20th Ave. / Robinson St. (50.43331, -104.62395) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Regina,
SK Division 6 Canada |
20th Ave. / Athol St. (50.43332, -104.62826) |
Traffic Calming Circle Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
St Thomas,
ON Elgin Canada |
Southgate Pkwy. / Fairview Ave. (42.75327, -81.16695) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2021 | https://london.ctvnews.ca/the-most-famous-st-thomas-ont-native-you-ve-likely-never-heard-of-1.5629790 |
St Thomas,
ON Elgin Canada |
Southgate Pkwy. / Penhale Ave. (42.75348, -81.16312) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2001-2006). |
St Thomas,
ON Elgin Canada |
Southgagte Pkwy. / Carolina Crescent / Peach Tree Blvd. (42.75327, -81.15804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2009-2013). |
St Thomas,
ON Elgin Canada |
Southdale Line / Fairview Rd. (42.74922, -81.16651) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2021 | https://www.facebook.com/cityofstthomas/photos/a.3739568726131579/3992567457498370 |
Burlington,
ON Halton Canada |
Appleby Line / Britannia Rd. (43.44769, -79.87784) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Beloeil,
QC La Vallée-du-Richelieu Regional County Municipality Canada |
Rue de l'Industrie / (parking) (45.59599, -73.19469) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
St Albert,
AB Division 11 Canada |
Ebony Way / Everitt Dr. (53.66712, -113.63184) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | https://stalbert.ca/dev/construction/transportation/everitt-ebony-way-roundabout/ |
Red Deer County,
AB Division 8 Canada |
AB Hwy 2A / Airport Dr. / Township Road 372 (52.17205, -113.86197) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | https://www.reddeeradvocate.com/news/red-deer-county-roundabouts-completed/ |
Red Deer County,
AB Division 8 Canada |
Laura Ave/Liberty Ave (52.21374, -113.82382) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Sarcee Trl. SW / Na'a Dr. SW / Trans-Canada Hwy EB Ramps (51.07800, -114.18891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2017 | |
Calgary,
AB Division 6 Canada |
Na'a Dr. SW / Na'a Plaza SW (51.07872, -114.19234) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | |
Calgary,
AB Division 6 Canada |
34 Ave. NW / Sarcee Trl. NW (51.08368, -114.18893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Calgary,
AB Division 6 Canada |
West Valley Rd. SW / 101 St. SW / 1 Ave. SW / Trans-Canada Hwy EB On-Ramp (51.08514, -114.23423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | |
Calgary,
AB Division 6 Canada |
Valley Ridge Blvd. NW / Trans Canada Hwy EB Ramps (51.08743, -114.24755) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2022 | |
Balzac,
AB Division 6 Canada |
Hwy 566 / Range Rd. 11 (15 St. NE) (51.21263, -114.02476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | https://discoverairdrie.com/articles/balzac-traffic-circle-inches-closer-to-completion |
Riverview,
NB Albert Canada |
Pinewood Rd. / Pine Glen Rd. (46.05248, -64.78896) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | https://www.919thebend.ca/2022/07/18/riverview-roundabouts/ |
Delta,
BC Greater Vancouver Canada |
River Rd. / Hwy 17 SB Ramps (49.15212, -122.95254) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | https://canada.constructconnect.com/joc/news/projects/2021/12/new-interchange-improves-delta-connections |
Delta,
BC Greater Vancouver Canada |
River Rd. / Hwy 17 NB Ramps (49.15194, -122.94952) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2021 | Raindrop shaped. https://canada.constructconnect.com/joc/news/projects/2021/12/new-interchange-improves-delta-connections |
Langford,
BC Capital Canada |
West Shore Pkwy. / Amy Rd. (48.45617, -123.53986) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2006-2009). |
Langley,
BC Greater Vancouver Canada |
82 Ave. / 204 St. (49.15181, -122.65706) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Langley,
BC Greater Vancouver Canada |
82 Ave. / 207A St. (49.15167, -122.64809) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | https://www.crestonvalleyadvance.ca/trending-now/b-c-drivers-struggle-with-roundabout-in-viral-tiktok/ Video shows some drivers going the wrong way during construction: https://www.facebook.com/CityNewsVAN/videos/traffic-chaos-langley-roundabout-fails-go-viral-on-tiktok/1374442239737644/ |
Cambridge,
ON Waterloo Canada |
Water St. S (Hwy 24) / McQueen-Shaver Blvd. (43.33372, -80.31312) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2021 | |
Saint John,
NB Saint John Canada |
Champlain Dr. / Creighton Ave. (45.29003, -66.00257) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Unknown |
Pedestrian access to central island. | |
Corner Brook,
NL Division 5 Canada |
Confederation Dr. / West Valley Rd. (48.94181, -57.91709) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2021 | http://ntv.ca/corner-brook-opens-first-roundabout/ |
Airdrie,
AB Division 6 Canada |
Williamstown Blvd. NW / Reunion Blvd. NW (51.30299, -114.03377) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Calgary,
AB Division 6 Canada |
Redstone St. NE / Redstone Plaza NE (51.17097, -113.96197) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Calgary,
AB Division 6 Canada |
Redstone Dr. NE / Redstone St. NE (51.16838, -113.96205) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Calgary,
AB Division 6 Canada |
Redstone Dr. NE / Redstone Blvd. NE (51.16838, -113.95107) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2015 | |
Calgary,
AB Division 6 Canada |
Redstone Ave. NE / Redstone Blvd. NE (51.17294, -113.95110) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2018 | |
Calgary,
AB Division 6 Canada |
128th Ave. NE / Cornerstone St. NE (51.16538, -113.94244) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2016 | North leg stubbed. |
Calgary,
AB Division 6 Canada |
128 Ave. NE / Cornerstone Blvd. NE (51.16542, -113.93815) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2017 | North and east legs stubbed. |
Calgary,
AB Division 6 Canada |
Skyview Ranch Blvd. NE / Skyview Ranch Rd. NE / Skyview Ranch Manor NE (51.16287, -113.95109) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Calgary,
AB Division 6 Canada |
Skyview Ranch Dr. NE / 52 St. NE (51.15802, -113.95843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Cityscape Dr. NE / Cityscape Gate NE (51.15240, -113.95842) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2013 | |
Calgary,
AB Division 6 Canada |
Cityscape Blvd. NE / Cityscape Dr. NE (51.14719, -113.96633) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2014 | North and west legs 2014. East leg 2016. South leg 2018. |
Calgary,
AB Division 6 Canada |
104 Ave. NE / 42 St. NE (51.14721, -113.97406) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | |
Calgary,
AB Division 6 Canada |
Savanna Blvd. NE / Savanna St. NE (51.13504, -113.95242) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Single-Lane |
2016 | |
Calgary,
AB Division 6 Canada |
Savanna Blvd. NE / 52 St. NE (51.13495, -113.95843) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
46 St. NE / Savanna Blvd. NE (51.13503, -113.96582) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Crowfoot Cir. NW / Crowfoot Parade / (transit center) (51.12465, -114.20779) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Single-Lane |
2008 | Oval shaped. ICD = 53 m x 42 m. Year Completed estimated (2008-2012). |
Calgary,
AB Division 6 Canada |
Nose Hill Dr. NW / Haskayne Dr. NW / Rosemont Blvd. NW (51.10814, -114.26887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2020-2021). |
Calgary,
AB Division 6 Canada |
McCall Way NE / Barlow Trl. NE (51.10221, -114.00061) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2010 | Year Completed estimated (2008-2011). |
Calgary,
AB Division 6 Canada |
Uxbridge Dr. NW / Ulster Rd. NW (51.06991, -114.12950) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Calgary,
AB Division 6 Canada |
Springborough Blvd. SW / Springborough Gate SW (51.03379, -114.19200) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Calgary,
AB Division 6 Canada |
Lower Springbank Rd. (Township Rd. 241A) / Township Rd. 242 (51.03721, -114.24617) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Calgary,
AB Division 6 Canada |
Westhills Way SW / Glenmore Trl. SW (Hwy 8-Hwy 201) WB Ramps (51.00996, -114.17395) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Westhills Way SW / Tsuut'ina Pkwy. / Glenmore Trl. (Hwy 8-Hwy 201) EB Ramps (51.00743, -114.17479) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW NB Ramps (51.00090, -114.16348) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Tsuut'ina Pkwy / Tsuut'ina Trl. SW SB Ramps (51.00130, -114.16953) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Calgary,
AB Division 6 Canada |
Peacekeepers Way SW / Don Ethell Blvd. SW (51.00475, -114.12697) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Calgary,
AB Division 6 Canada |
Quarry Way SE / Quarry Gate SE (50.96118, -114.01967) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2011 | |
Tsuu T'ina Nation 145,
AB Division 6 Canada |
Buffalo Run Blvd. / 130 Ave. SW / Tsuut'ina Trl. SB Entrance Ramp (50.93654, -114.14333) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Raindrop shaped. Merging right-turn bypass lane on west leg. Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
130 Ave. SW / Tsuut'ina Trl. NB Exit Ramp (50.93611, -114.13893) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2020 | Raindrop shaped. |
Calgary,
AB Division 6 Canada |
Woodpark Blvd. SW / 24 St. SW (50.93578, -114.11793) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2019-2020). |
Calgary,
AB Division 6 Canada |
Marine Dr. SE / Mahogany Rd. SE (50.89464, -113.92917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 43.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Marine Dr. SE / Masters Ave. SE (50.89226, -113.92533) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Chaparral Valley Square SE / Chaparral Valley Dr. SE (50.88594, -114.01532) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.0000 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2008-2011). |
Calgary,
AB Division 6 Canada |
Chaparral Valley Dr. SE / Chaparral Valley Gate SE / Chaparral Valley Grove SE (50.88197, -114.01471) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2008). |
Calgary,
AB Division 6 Canada |
194 Ave. SE / Wolf Willow Blvd. SE (50.87758, -114.00378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Cranston Gate SE / Deerfoot Trl. (Hwy 2) SB Ramps (50.86657, -113.96433) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 72.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
212 Ave. SE / Deerfoot Trl. NB Exit Ramp (50.86526, -113.96014) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 70.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2019 | Raindrop shaped. Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / 212 Ave. SE / Union Ave. / Seton Cir. SE (50.86832, -113.95356) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Seton Way SE / Seton Ave. SE (50.87133, -113.95589) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2019 | Year Completed estimated (2017-2020). |
Calgary,
AB Division 6 Canada |
Legacy Village Way SE / Legacy Village Rd. SE (50.85969, -114.02478) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2016). |
Okotoks,
AB Division 6 Canada |
D'Arcy Blvd. / Sandstone Dr. / Larkspur Bend (50.73559, -113.98112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2021). |
Okotoks,
AB Division 6 Canada |
Mountainview Dr. / Mountainview Gate (50.72974, -113.98983) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). |
Lethbridge,
AB Division 2 Canada |
Metis Trl. W / Temple Blvd. W (49.66881, -112.89288) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Saskatoon,
SK Division 11 Canada |
Feheregyhazi Blvd. / Orban Way (52.17548, -106.55102) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2020). |
Saskatoon,
SK Division 11 Canada |
Nelson Rd. / (parking) (52.14987, -106.57944) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2005 | No splitter islands on north and south legs. Year Completed estimated (2004-2005). |
Saskatoon,
SK Division 11 Canada |
Nelson Rd. / (parking) (52.14844, -106.58254) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2005 | At entrance to school. No splitter islands on northwest and southeast legs. Year Completed estimated (2004-2005). |
Holyrood,
NL Division 1 Canada |
Hwy 60 (Conception Bay Hwy.) / Hwy 62 (47.38499, -53.12423) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2019 |