City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Sturgeon County,
AB Division 11 Canada |
Sturgeon Rd. / Starkey Rd. (53.67801, -113.56458) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Victoria,
BC Capital Canada |
Glen Lake Rd. / Park Dale Dr. / Alouette Dr. (48.44038, -123.52993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (1985-2011). |
Bracebridge,
ON Muskoka Canada |
Taylor Rd. / Cedar Ln. (45.05055, -79.29578) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2009-2012). |
Ramara,
ON Simcoe Canada |
Hwy 12 / CR 169 / Concession Road 6 (44.57153, -79.18908) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. / Grove Dr. (53.55573, -113.86097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / Copperhaven Dr. / Harvest Ridge Dr. (53.55575, -113.95196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / (unknown) (53.55467, -113.95664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. (Range Road 271) / Fenwyck Blvd. (53.55121, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd (Range Road 271) / (unknown) (53.54856, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / 218th St. NW (53.52741, -113.69339) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / Secord Blvd. NW (53.52657, -113.70582) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / (unknown) (53.52650, -113.70143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2019). |
Edmonton,
AB Division 11 Canada |
Glastonbury Blvd. NW / Granville Dr. NW (53.50464, -113.68570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
Terwillegar Blvd. NW / Towne Centre Blvd. (53.44467, -113.57784) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2000-2004). |
Langford,
BC Capital Canada |
Millstream Rd. / Bear Mountain Pkwy. (48.47140, -123.50526) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Cambridge,
ON Waterloo Canada |
Blenheim Rd. / Bismark Dr. (43.36041, -80.34133) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.cambridgetoday.ca/local-news/citys-newest-roundabout-unique-to-cambridge-west-development-5511610 |
Ottawa,
ON Ottawa Canada |
Greenbank Rd. / Half Moon Bay Rd. (45.25555, -75.73742) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Year Completed estimated (2021-2023). |
Dieppe,
NB Westmorland Canada |
Gauvin Rd. / Alain-Gillette St. / Rue du College (46.09572, -64.74054) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2017-2021). |
West Vancouver,
BC Greater Vancouver Canada |
Cross Creek Rd. / Chartwell Dr. (49.34530, -123.14714) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2013). |
West Vancouver,
BC Greater Vancouver Canada |
Taylor Way / Southborough Dr. / Stevens Dr. (49.34101, -123.13479) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2005 | Yield-controlled right-turn bypass lane on south leg. |
Coquitlam,
BC Greater Vancouver Canada |
Soball St. / Gislason Ave. (49.28930, -122.75026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2009-2011). |
Port Coquitlam,
BC Greater Vancouver Canada |
Fremont St. / Fremont Dr. / Hwy 7B (Loogheed Hwy.) Exit Ramp (49.24939, -122.73402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Raindrop shaped. Year Completed estimated (2008-2011). |
Surrey,
BC Greater Vancouver Canada |
74 Ave. / 194A St. (49.13733, -122.68371) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0000 |
Other (At-Grade) Single-Lane |
2019 | |
Surrey,
BC Greater Vancouver Canada |
194A St. / 73 Ave. (49.13550, -122.68375) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2014 | |
Delta,
BC Greater Vancouver Canada |
Ferry Rd. / Admiral Way (49.11201, -123.07804) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
2005 | |
Delta,
BC Greater Vancouver Canada |
Ferry Rd. / Commodore Dr. (49.10577, -123.07907) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Painted splitter islands. | |
Chilliwack,
BC Fraser Valley Canada |
Columbia Valley Rd. / Sunnyside Blvd. / (parking) (49.07529, -121.97639) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.0000 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2009-2011). |
Surrey,
BC Greater Vancouver Canada |
25 Ave. / 166 St. (49.04745, -122.76265) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Surrey,
BC Greater Vancouver Canada |
3A Ave. / 172 St. (49.00848, -122.74635) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2012 | |
Langley,
BC Greater Vancouver Canada |
64 Ave. / 232 St. (49.11889, -122.58167) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2020 | |
Milton,
ON Halton Canada |
Campbellville Rd. / Campbell Ave. (43.49642, -79.97028) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Oromocto,
NB Sunbury Canada |
Miramichi Rd. / St Lawrence Ave. (45.84055, -66.48024) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 67.0000 |
Other (At-Grade) Single-Lane |
Before 2002. | |
Riverview,
NB Albert Canada |
Bridgedale Blvd. / Runneymeade Rd. (46.06430, -64.76196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2021 | East leg stubbed. Year Completed estimated (2020-2021). https://www.townofriverview.ca/news/bridgedale-boulevard-is-taking-shape |
Kitchener,
ON Waterloo Canada |
Blair Creek Dr. / Doon South Dr. (43.37282, -80.43378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Kitchener,
ON Waterloo Canada |
Blair Creek Dr. / Thomas Slee Dr. (43.37033, -80.44091) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2018). |
Waterloo,
ON Waterloo Canada |
Millennium Blvd. / Crossgate Blvd. (43.52326, -80.49690) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2011 | West leg stubbed. Year Completed estimated (2009-2012). |
St Albert,
AB Division 11 Canada |
Hwy 633 (Villeneuve Rd.) / (parking) (53.65791, -113.63362) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | https://stalbert.ca/dev/construction/transportation/villeneuve/ |
St Albert,
AB Division 11 Canada |
Villeneuve Rd. / Dennison Dr. / Jensen Gate (53.65788, -113.65248) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | https://stalbert.ca/dev/construction/transportation/villeneuve/ |
(unincorporated),
ON Simcoe Canada |
CR 14 / Bayberry Dr. (44.02934, -79.85396) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2023 | |
Thorold,
ON Niagara Canada |
Lundy's Ln. / Barker Pkwy. (43.08044, -79.18675) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2020). |
Charlottetown,
PE Queens Canada |
Hwy 2 (St Peters Rd. [Veteran's Memorial Hwy.]) / Greenwood Dr. / Macwilliams Rd. (46.28108, -63.09860) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Charlottetown,
PE Queens Canada |
Hwy 2 (St Peters Rd. [Veteran's Memorial Hwy.]) / Avonlea Dr. / Oakland Dr. (46.27385, -63.10747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Charlottetown,
PE Queens Canada |
Hwy 2 (St Peters Rd. [Veteran's Memorial Hwy.]) / Angus Dr. / Hammac Dr. (46.27720, -63.10328) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Niagara Falls,
ON Niagara Canada |
Victoria Ave. / Bridge St. / Thorold Stone Rd. (43.10884, -79.07338) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 64.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.youtube.com/watch?v=PJwDZ6g8cT0 |
Kingston,
ON Frontenac Canada |
Resource Rd. / Centennial Dr. (44.27700, -76.55971) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2019). |
Ottawa,
ON Ottawa Canada |
Campeau Dr. / Winterset Rd. (45.30466, -75.92836) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 56.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Southeast leg stubbed. Completed September 2021. |
Ottawa,
ON Ottawa Canada |
CitiGate Dr. / CrossKeys Pl. (45.26981, -75.78722) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | |
Ottawa,
ON Ottawa Canada |
Barnsdale Rd. / Prince of Wales Dr. (45.24093, -75.71220) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2022). |
Red Deer,
AB Division 8 Canada |
Signet Close / Seneca Dr. (52.23689, -113.82224) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Kamloops,
BC Thompson-Nicola Canada |
Hugh Allan Dr. / Versatile Dr. (50.65301, -120.38349) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2014 | Merging right-turn bypass lane on southeast leg. Year Completed estimated (2012-2016). |
Ottawa,
ON Ottawa Canada |
Palladium Dr. / Robert Grant Ave. / Derreen Ave. (45.28924, -75.93237) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | |
Morrisburg,
ON Stormont (Dundas & Glengarry) Canada |
CR 2 / CR 31 / Ottawa St. (44.90050, -75.18542) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). https://www.renewcanada.net/three-levels-of-government-mark-unveiling-of-morrisburg-roundabout/ |
Olds,
AB Division 6 Canada |
Hwy 2A / 68 St. (51.77414, -114.09612) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Single-Lane |
2022 | East leg stubbed. Year Completed estimated (2021-2022). |
Innisfil,
ON Simcoe Canada |
6th Line / Webster Blvd. (44.28848, -79.55307) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Year Completed estimated (2019-2020). |
Delta,
BC Greater Vancouver Canada |
Nordel Way / Highway 91 Connector EB Ramps / Frontage Rd. (49.14617, -122.94689) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2022 | Merging right-turn bypass lane on east leg; add-lane right-turn bypass lane on south leg. |
Delta,
BC Greater Vancouver Canada |
Dunlop Rd. / Sunset Dr. (49.15687, -122.93145) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Delta,
BC Greater Vancouver Canada |
Dunlop Rd. / Terrace Dr. / Harrogate Dr. (49.15901, -122.92808) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Burnaby,
BC Greater Vancouver Canada |
Douglas Rd. / Goring St. (49.26283, -122.98698) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 1 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Burnaby,
BC Greater Vancouver Canada |
Cliff Ave. / Kitchener St. (49.27159, -122.95905) |
Traffic Calming Circle Unknown |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Burnaby,
BC Greater Vancouver Canada |
Cliff Ave. / Union St. (49.27779, -122.95902) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Delta,
BC Greater Vancouver Canada |
Audley Blvd. / Cundy Ave. (49.17521, -122.93062) |
Other Existing |
All-Way Yield None |
3 Approaches 2 Driveways |
Other (At-Grade) Single-Lane |
||
Delta,
BC Greater Vancouver Canada |
Derwent Way / Belgrave Way (49.18186, -122.92912) |
Other Existing |
All-Way Yield None |
3 Approaches 1 Driveways |
Other (At-Grade) Single-Lane |
||
Delta,
BC Greater Vancouver Canada |
Lyon Rd. / Huff Blvd. (49.12736, -122.91501) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.0000 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2004-2007). |
Surrey,
BC Greater Vancouver Canada |
125A St. / Station Rd. (49.10068, -122.87456) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.0000 |
Other (At-Grade) Single-Lane |
2015 | |
Lake Country,
BC Central Okanagan Canada |
Oceola Rd. - Okanagan Centre Rd. E / Lake Hill Dr. (50.06064, -119.41844) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2019). |
Fredericton,
NB York Canada |
Rte 105 (Ring Rd.) / Brookside Dr. (45.99016, -66.65182) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | https://www.youtube.com/watch?v=ZmnmNNx1cpA |
Cambridge,
ON Waterloo Canada |
Dundas St. / Beverly St. (43.36588, -80.30592) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2022 | https://www.therecord.com/local-cambridge/news/2022/09/10/what-s-going-on-here-beverly-and-dundas-streets-in-cambridge.html |
Greater Sudbury,
ON Greater Sudbury Canada |
Falconbridge Hwy. (Longyear Dr.) / Edison Rd. (46.57135, -80.82822) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | https://www.greatersudbury.ca/live/transportation-parking-and-roads/road-construction-and-projects/2022-construction-projects/longyear-drive-construction-update/ |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. WB Ramps (49.97435, -98.35997) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://portageonline.com/articles/see-aerial-view-of-west-end-roundabout-now-open https://www.portageonline.com/articles/final-plan-for-west-end-overpass-complete |
Portage la Prairie,
MB Division 9 Canada |
Hwy 1A / Trans Canada Hwy. EB Ramps (49.97330, -98.36839) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Unknown |
https://www.portageonline.com/articles/update-on-west-end-overpass-replacement-construction | |
Warwick,
ON Lambton Canada |
Hwy 79 (Egremont Rd.) / Nauvoo Rd. (43.00424, -81.87951) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | https://www.lambtononline.ca/en/news/roundabout-construction-complete-at-nauvoo-and-egremont-road-intersection.aspx |
Whitchurch-Stouffville,
ON York Canada |
Spofford Dr/Baker Hill Blvd/Bellcastle Gate (43.97216, -79.27581) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0000 |
Other (At-Grade) Single-Lane |
2020 | |
Ajax,
ON Durham Canada |
Williamson Dr. / Warner Dr. / Seward Crescent (43.89788, -79.01488) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.0000 |
Other (At-Grade) Single-Lane |
2005 | |
Whitby,
ON Durham Canada |
Des Newman Blvd. / Twin Streams Rd. (43.89968, -78.98829) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 52.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2020). |
Bowmanville,
ON Durham Canada |
Green Rd. / Clarington Blvd. / Boswell Dr. (43.90509, -78.71026) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2019 | East leg added with construction of roundabout. Year Completed estimated (2018-2019). |
Bowmanville,
ON Durham Canada |
Port Darlington Rd. / East Shore Dr. (43.89136, -78.65940) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
No splitter islands. | |
Oakbank,
MB Division 12 Canada |
Garven Rd. / Provincial Road 206 (49.97438, -96.84232) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2020 | https://winnipeg.ctvnews.ca/roundabout-to-be-built-at-problem-intersection-in-manitoba-province-1.4999829 |
Charlottetown,
PE Queens Canada |
St Peters Rd. / Belvedere Ave. / Falconwood Dr. / Brackley Point Rd. (46.25888, -63.11950) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
5 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://twitter.com/ChtownPE/status/1601305941785264128?cxt=HHwWgICqzaPR_bgsAAAA https://www.saltwire.com/atlantic-canada/news/major-charlottetown-roundabout-project-to-begin-in-july-100733988/ |
Bedford,
NS Halifax Canada |
Larry Uteck Blvd. / Broad St. / Brookline Dr. (44.70824, -63.70896) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2022 | https://www.cbc.ca/news/canada/nova-scotia/traffic-delays-bedford-larry-uteck-roundabout-1.6183663 |
Montreal,
QC Montreal Canada |
Avenue Pierre-de Coubertin / Avenue Desjardins (45.55450, -73.55120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Caledonia,
PE Queens Canada |
PE 315 (Wood Islands Rd.) / PE 24 (Murray Harbour Rd.) (46.06054, -62.71099) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.0000 |
Other (At-Grade) Single-Lane |
2020 | https://www.peicanada.com/eastern_graphic/truckers-stress-disconnect-with-roundabouts/article_a22bf178-5d51-11ea-842b-d74254b428db.html |
Campbell River,
BC Strathcona Canada |
Maryland Rd. / Willow Creek Rd. (49.95296, -125.21632) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2005-2009). |
Revelstoke,
BC Columbia-Shuswap Canada |
Nichol Rd. / Nels Nelson Crescent / (unknown) (50.97572, -118.17129) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2021 | https://revelstokemountaineer.com/brief-construction-to-begin-on-new-roundabout-near-revelstoke-mountain-resort/ |
Edmonton,
AB Division 11 Canada |
Blatchford Rd. NW / (unknown) (53.57018, -113.51201) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Edmonton,
AB Division 11 Canada |
Blatchford Rd. NW / Alpha Blvd. NW (53.56939, -113.51664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.0000 |
Other (At-Grade) Single-Lane |
2022 | |
Dieppe,
NB Westmorland Canada |
Rue des Élèves / Belle-Forêt St. / Dieppe Blvd. (46.07055, -64.69125) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2018 | https://www.dieppe.ca/en/nouvelles/travaux-routiers-boulevard-dieppe-et-rue-bellefort.aspx |
Charlottetown,
PE Queens Canada |
Brackley Point Rd. / Oak Dr. (46.26962, -63.12694) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2016 | https://www.saltwire.com/prince-edward-island/news/local/reviews-good-for-new-brackley-point-roadoak-drive-mini-roundabout-102371/ |
Saint-Sauveur-des-Monts,
QC Les Pays-d'en-Haut Regional County Municipality Canada |
Avenue Saint-Denis / Chemin du Mont Saint-Sauveur (45.88627, -74.14848) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2019-2024). |
View Royal,
BC Capital Canada |
Six Mile Rd. / Atkins Rd. (48.45846, -123.46432) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2024 | https://www.viewroyal.ca/EN/meta/new/2024-latest-news/new-roundabout-in-view-royal-is-complete.html?media=mobile |
Niagara-on-the-Lake,
ON Niagara Canada |
York Rd. (Regional Road 81) / Glendale Ave. (Regional Road 89) (43.16034, -79.16236) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.0000 |
Other (At-Grade) Single-Lane |
2023 | Add-lane right-turn bypass lanes on west and south legs. https://www.insauga.com/construction-finally-finished-on-niagara-on-the-lakes-diverging-diamond-interchange/ |
Sherbrooke,
QC Sherbrooke Canada |
Rue Terrill / Rue des Grandes-Fourches N (45.40783, -71.89476) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | Previous control type was a grade-separated interchange. https://www.sherbrookerecord.com/new-grandes-fourches-bridge-opens-in-sherbrooke/ |
Val-d’Or,
QC La Vallée-de-l'Or Regional County Municipality Canada |
Boulevard Barrette / 7e Rue (48.08434, -77.79004) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2024 | Here's the construction tender: https://seao.ca/OpportunityPublication/ConsulterAvis/Categorie?ItemId=5993fe76-ad0e-4a4c-9002-bcbf9ee6f299&SubCategoryCode=C02&callingPage=4&searchId=f5dcd1ec-11bf-4860-b7dc-6c1ddd425347 A news article: https://www.lecitoyenrouynlasarre.com/article/2024/05/27/7e-rue%E2%80%AF-un-carrefour-giratoire-pret-d-ici-la-mi-septembre A Facebook post from the city: https://www.facebook.com/villedevaldor/posts/pfbid02e5dS7vEpjSSTvz1i4nsAhbWzrQ2qFr4V825kPb5f9L6V3rpqaaNV4ZjohEgx5gWpl |
Sarnia,
ON Lambton Canada |
Rapids Pkwy. / Quinn Dr. (42.98639, -82.35855) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 40.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.theobserver.ca/news/local-news/new-sarnia-roundabout-could-open-soon |
Antigonish,
NS Antigonish Canada |
Hwy. 4 (Old Hwy. 104) / Hwy. 7 (45.61419, -61.99859) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Edmonton,
AB Division 11 Canada |
97 St. NW / 66 Ave. NW (53.50289, -113.47947) |
Traffic Calming Circle Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2015 | No splitter islands. |
Essa Township,
ON Simcoe Canada |
CR 21 / CR 56 (44.25352, -79.79946) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2023 | https://barrie.ctvnews.ca/simcoe-county-opens-new-roundabout-in-essa-township-1.6691867 |
Springwater,
ON Simcoe Canada |
Wilson Dr. / Carson Rd. / Seadon Rd. (44.41593, -79.75453) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2023 | https://www.simcoe.com/news/growth-is-coming-wilson-drive-roundabout-opens-north-of-barrie/article_3e5d1463-0a87-51e4-a5ca-96ced0df7c93.html |
Cowansville,
QC Brome-Missisquoi Regional County Municipality Canada |
Rte 104 (Boulevard Jean-Jacques-Bertrand) / Rte 241 (Rue Principale) (45.20232, -72.69436) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2023 | Year Completed estimated (2015-2024). |
Waskatenau,
AB Division 12 Canada |
Hwy 28 / Hwy 831 (54.09904, -112.80128) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 62.0000 |
Other (At-Grade) Single-Lane |
2021 | Large truck apron. https://www.ae.ca/articles/award-winning-highway-28-roundabout-addresses-safety-concerns-and-reduces-traffic-delays/ |
Colwood,
BC Capital Canada |
Latoria Rd. / Veterans Memorial Pkwy. / Medalist Ave. (48.40853, -123.50873) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Unknown |
2023 | https://www.colwood.ca/news-events/news/2023-12-15-000000/now-open-new-roundabout-latoria-road-and-veterans-memorial |