29411 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Sturgeon County, AB
Division 11
Canada
Sturgeon Rd. / Starkey Rd.
(53.67801, -113.56458)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
32.0000
Other (At-Grade)
Single-Lane
2021 Year Completed estimated (2020-2021).
Victoria, BC
Capital
Canada
Glen Lake Rd. / Park Dale Dr. / Alouette Dr.
(48.44038, -123.52993)
Roundabout
Existing
All-Way Yield
None
4 Approaches
1 Driveways
30.0000
Other (At-Grade)
Single-Lane
2010 Year Completed estimated (1985-2011).
Bracebridge, ON
Muskoka
Canada
Taylor Rd. / Cedar Ln.
(45.05055, -79.29578)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2012 Year Completed estimated (2009-2012).
Ramara, ON
Simcoe
Canada
Hwy 12 / CR 169 / Concession Road 6
(44.57153, -79.18908)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.0000
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2022-2023).
Spruce Grove, AB
Division 11
Canada
Pioneer Rd. / Grove Dr.
(53.55573, -113.86097)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
47.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2017
Spruce Grove, AB
Division 11
Canada
Grove Dr. W / Copperhaven Dr. / Harvest Ridge Dr.
(53.55575, -113.95196)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.0000
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2016-2020).
Spruce Grove, AB
Division 11
Canada
Grove Dr. W / (unknown)
(53.55467, -113.95664)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.0000
Other (At-Grade)
Single-Lane
2020 Year Completed estimated (2016-2020).
Spruce Grove, AB
Division 11
Canada
Pioneer Rd. (Range Road 271) / Fenwyck Blvd.
(53.55121, -113.86090)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
48.0000
Other (At-Grade)
Single-Lane
2020 Year Completed estimated (2017-2020).
Spruce Grove, AB
Division 11
Canada
Pioneer Rd (Range Road 271) / (unknown)
(53.54856, -113.86090)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.0000
Other (At-Grade)
Single-Lane
2020 Year Completed estimated (2017-2020).
Edmonton, AB
Division 11
Canada
92nd Ave. NW / 218th St. NW
(53.52741, -113.69339)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
50.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2017 Year Completed estimated (2017-2020).
Edmonton, AB
Division 11
Canada
92nd Ave. NW / Secord Blvd. NW
(53.52657, -113.70582)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
50.0000
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2016-2020).
Edmonton, AB
Division 11
Canada
92nd Ave. NW / (unknown)
(53.52650, -113.70143)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2017 Year Completed estimated (2017-2019).
Edmonton, AB
Division 11
Canada
Glastonbury Blvd. NW / Granville Dr. NW
(53.50464, -113.68570)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
32.0000
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2017-2020).
Edmonton, AB
Division 11
Canada
Terwillegar Blvd. NW / Towne Centre Blvd.
(53.44467, -113.57784)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2004 Year Completed estimated (2000-2004).
Langford, BC
Capital
Canada
Millstream Rd. / Bear Mountain Pkwy.
(48.47140, -123.50526)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022
Cambridge, ON
Waterloo
Canada
Blenheim Rd. / Bismark Dr.
(43.36041, -80.34133)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.0000
Other (At-Grade)
Single-Lane
2022 https://www.cambridgetoday.ca/local-news/citys-newest-roundabout-unique-to-cambridge-west-development-5511610
Ottawa, ON
Ottawa
Canada
Greenbank Rd. / Half Moon Bay Rd.
(45.25555, -75.73742)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-lane w/ Traversable Central Island
2022 Year Completed estimated (2021-2023).
Dieppe, NB
Westmorland
Canada
Gauvin Rd. / Alain-Gillette St. / Rue du College
(46.09572, -64.74054)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
32.0000
Other (At-Grade)
Single-Lane
2019 Year Completed estimated (2017-2021).
West Vancouver, BC
Greater Vancouver
Canada
Cross Creek Rd. / Chartwell Dr.
(49.34530, -123.14714)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2012 Year Completed estimated (2011-2013).
West Vancouver, BC
Greater Vancouver
Canada
Taylor Way / Southborough Dr. / Stevens Dr.
(49.34101, -123.13479)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2005 Yield-controlled right-turn bypass lane on south leg.
Coquitlam, BC
Greater Vancouver
Canada
Soball St. / Gislason Ave.
(49.28930, -122.75026)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
25.0000
Other (At-Grade)
Single-Lane
2011 Year Completed estimated (2009-2011).
Port Coquitlam, BC
Greater Vancouver
Canada
Fremont St. / Fremont Dr. / Hwy 7B (Loogheed Hwy.) Exit Ramp
(49.24939, -122.73402)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
42.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2010 Raindrop shaped. Year Completed estimated (2008-2011).
Surrey, BC
Greater Vancouver
Canada
74 Ave. / 194A St.
(49.13733, -122.68371)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
27.0000
Other (At-Grade)
Single-Lane
2019
Surrey, BC
Greater Vancouver
Canada
194A St. / 73 Ave.
(49.13550, -122.68375)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2014
Delta, BC
Greater Vancouver
Canada
Ferry Rd. / Admiral Way
(49.11201, -123.07804)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
28.0000
Other (At-Grade)
Single-Lane
2005
Delta, BC
Greater Vancouver
Canada
Ferry Rd. / Commodore Dr.
(49.10577, -123.07907)
Traffic Calming Circle
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other (At-Grade)
Single-lane w/ Traversable Central Island
Painted splitter islands.
Chilliwack, BC
Fraser Valley
Canada
Columbia Valley Rd. / Sunnyside Blvd. / (parking)
(49.07529, -121.97639)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
37.0000
Other (At-Grade)
Single-Lane
2010 Year Completed estimated (2009-2011).
Surrey, BC
Greater Vancouver
Canada
25 Ave. / 166 St.
(49.04745, -122.76265)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2022
Surrey, BC
Greater Vancouver
Canada
3A Ave. / 172 St.
(49.00848, -122.74635)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2012
Langley, BC
Greater Vancouver
Canada
64 Ave. / 232 St.
(49.11889, -122.58167)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2020
Milton, ON
Halton
Canada
Campbellville Rd. / Campbell Ave.
(43.49642, -79.97028)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2022).
Oromocto, NB
Sunbury
Canada
Miramichi Rd. / St Lawrence Ave.
(45.84055, -66.48024)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
67.0000
Other (At-Grade)
Single-Lane
Before 2002.
Riverview, NB
Albert
Canada
Bridgedale Blvd. / Runneymeade Rd.
(46.06430, -64.76196)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.0000
Other (At-Grade)
Single-Lane
2021 East leg stubbed. Year Completed estimated (2020-2021). https://www.townofriverview.ca/news/bridgedale-boulevard-is-taking-shape
Kitchener, ON
Waterloo
Canada
Blair Creek Dr. / Doon South Dr.
(43.37282, -80.43378)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
35.0000
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2017-2018).
Kitchener, ON
Waterloo
Canada
Blair Creek Dr. / Thomas Slee Dr.
(43.37033, -80.44091)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
35.0000
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2017-2018).
Waterloo, ON
Waterloo
Canada
Millennium Blvd. / Crossgate Blvd.
(43.52326, -80.49690)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
35.0000
Other (At-Grade)
Single-Lane
2011 West leg stubbed. Year Completed estimated (2009-2012).
St Albert, AB
Division 11
Canada
Hwy 633 (Villeneuve Rd.) / (parking)
(53.65791, -113.63362)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
35.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2023 https://stalbert.ca/dev/construction/transportation/villeneuve/
St Albert, AB
Division 11
Canada
Villeneuve Rd. / Dennison Dr. / Jensen Gate
(53.65788, -113.65248)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2022 https://stalbert.ca/dev/construction/transportation/villeneuve/
(unincorporated), ON
Simcoe
Canada
CR 14 / Bayberry Dr.
(44.02934, -79.85396)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2023
Thorold, ON
Niagara
Canada
Lundy's Ln. / Barker Pkwy.
(43.08044, -79.18675)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.0000
Other (At-Grade)
Single-Lane
2020 Year Completed estimated (2019-2020).
Charlottetown, PE
Queens
Canada
Hwy 2 (St Peters Rd. [Veteran's Memorial Hwy.]) / Greenwood Dr. / Macwilliams Rd.
(46.28108, -63.09860)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021
Charlottetown, PE
Queens
Canada
Hwy 2 (St Peters Rd. [Veteran's Memorial Hwy.]) / Avonlea Dr. / Oakland Dr.
(46.27385, -63.10747)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021
Charlottetown, PE
Queens
Canada
Hwy 2 (St Peters Rd. [Veteran's Memorial Hwy.]) / Angus Dr. / Hammac Dr.
(46.27720, -63.10328)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021
Niagara Falls, ON
Niagara
Canada
Victoria Ave. / Bridge St. / Thorold Stone Rd.
(43.10884, -79.07338)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
64.0000
Other (At-Grade)
Single-Lane
2022 https://www.youtube.com/watch?v=PJwDZ6g8cT0
Kingston, ON
Frontenac
Canada
Resource Rd. / Centennial Dr.
(44.27700, -76.55971)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.0000
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2017-2019).
Ottawa, ON
Ottawa
Canada
Campeau Dr. / Winterset Rd.
(45.30466, -75.92836)
Roundabout
Existing
All-Way Yield
Rectangular Rapid Flashing Beacon (RRFB)
4 Approaches
0 Driveways
56.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021 Southeast leg stubbed. Completed September 2021.
Ottawa, ON
Ottawa
Canada
CitiGate Dr. / CrossKeys Pl.
(45.26981, -75.78722)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2017
Ottawa, ON
Ottawa
Canada
Barnsdale Rd. / Prince of Wales Dr.
(45.24093, -75.71220)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2020 Year Completed estimated (2020-2022).
Red Deer, AB
Division 8
Canada
Signet Close / Seneca Dr.
(52.23689, -113.82224)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2016-2017).
Kamloops, BC
Thompson-Nicola
Canada
Hugh Allan Dr. / Versatile Dr.
(50.65301, -120.38349)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2014 Merging right-turn bypass lane on southeast leg. Year Completed estimated (2012-2016).
Ottawa, ON
Ottawa
Canada
Palladium Dr. / Robert Grant Ave. / Derreen Ave.
(45.28924, -75.93237)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2022
Morrisburg, ON
Stormont (Dundas & Glengarry)
Canada
CR 2 / CR 31 / Ottawa St.
(44.90050, -75.18542)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2022). https://www.renewcanada.net/three-levels-of-government-mark-unveiling-of-morrisburg-roundabout/
Olds, AB
Division 6
Canada
Hwy 2A / 68 St.
(51.77414, -114.09612)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.0000
Other (At-Grade)
Single-Lane
2022 East leg stubbed. Year Completed estimated (2021-2022).
Innisfil, ON
Simcoe
Canada
6th Line / Webster Blvd.
(44.28848, -79.55307)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
51.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2020 Year Completed estimated (2019-2020).
Delta, BC
Greater Vancouver
Canada
Nordel Way / Highway 91 Connector EB Ramps / Frontage Rd.
(49.14617, -122.94689)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
55.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2022 Merging right-turn bypass lane on east leg; add-lane right-turn bypass lane on south leg.
Delta, BC
Greater Vancouver
Canada
Dunlop Rd. / Sunset Dr.
(49.15687, -122.93145)
Traffic Calming Circle
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Delta, BC
Greater Vancouver
Canada
Dunlop Rd. / Terrace Dr. / Harrogate Dr.
(49.15901, -122.92808)
Traffic Calming Circle
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Burnaby, BC
Greater Vancouver
Canada
Douglas Rd. / Goring St.
(49.26283, -122.98698)
Roundabout
Existing
All-Way Yield
Rectangular Rapid Flashing Beacon (RRFB)
3 Approaches
1 Driveways
30.0000
Other (At-Grade)
Single-Lane
2022
Burnaby, BC
Greater Vancouver
Canada
Cliff Ave. / Kitchener St.
(49.27159, -122.95905)
Traffic Calming Circle
Unknown
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Burnaby, BC
Greater Vancouver
Canada
Cliff Ave. / Union St.
(49.27779, -122.95902)
Traffic Calming Circle
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
Delta, BC
Greater Vancouver
Canada
Audley Blvd. / Cundy Ave.
(49.17521, -122.93062)
Other
Existing
All-Way Yield
None
3 Approaches
2 Driveways
Other (At-Grade)
Single-Lane
Delta, BC
Greater Vancouver
Canada
Derwent Way / Belgrave Way
(49.18186, -122.92912)
Other
Existing
All-Way Yield
None
3 Approaches
1 Driveways
Other (At-Grade)
Single-Lane
Delta, BC
Greater Vancouver
Canada
Lyon Rd. / Huff Blvd.
(49.12736, -122.91501)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
20.0000
Other (At-Grade)
Single-Lane
2006 Year Completed estimated (2004-2007).
Surrey, BC
Greater Vancouver
Canada
125A St. / Station Rd.
(49.10068, -122.87456)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
25.0000
Other (At-Grade)
Single-Lane
2015
Lake Country, BC
Central Okanagan
Canada
Oceola Rd. - Okanagan Centre Rd. E / Lake Hill Dr.
(50.06064, -119.41844)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.0000
Other (At-Grade)
Single-Lane
2019 Year Completed estimated (2018-2019).
Fredericton, NB
York
Canada
Rte 105 (Ring Rd.) / Brookside Dr.
(45.99016, -66.65182)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2022 https://www.youtube.com/watch?v=ZmnmNNx1cpA
Cambridge, ON
Waterloo
Canada
Dundas St. / Beverly St.
(43.36588, -80.30592)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2022 https://www.therecord.com/local-cambridge/news/2022/09/10/what-s-going-on-here-beverly-and-dundas-streets-in-cambridge.html
Greater Sudbury, ON
Greater Sudbury
Canada
Falconbridge Hwy. (Longyear Dr.) / Edison Rd.
(46.57135, -80.82822)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2022 https://www.greatersudbury.ca/live/transportation-parking-and-roads/road-construction-and-projects/2022-construction-projects/longyear-drive-construction-update/
Portage la Prairie, MB
Division 9
Canada
Hwy 1A / Trans Canada Hwy. WB Ramps
(49.97435, -98.35997)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Single-Lane
2022 https://portageonline.com/articles/see-aerial-view-of-west-end-roundabout-now-open https://www.portageonline.com/articles/final-plan-for-west-end-overpass-complete
Portage la Prairie, MB
Division 9
Canada
Hwy 1A / Trans Canada Hwy. EB Ramps
(49.97330, -98.36839)
Roundabout
Unknown
All-Way Yield
None
3 Approaches
0 Driveways
Freeway Ramps (Grade-Separated)
Unknown
https://www.portageonline.com/articles/update-on-west-end-overpass-replacement-construction
Warwick, ON
Lambton
Canada
Hwy 79 (Egremont Rd.) / Nauvoo Rd.
(43.00424, -81.87951)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2022 https://www.lambtononline.ca/en/news/roundabout-construction-complete-at-nauvoo-and-egremont-road-intersection.aspx
Whitchurch-Stouffville, ON
York
Canada
Spofford Dr/Baker Hill Blvd/Bellcastle Gate
(43.97216, -79.27581)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
35.0000
Other (At-Grade)
Single-Lane
2020
Ajax, ON
Durham
Canada
Williamson Dr. / Warner Dr. / Seward Crescent
(43.89788, -79.01488)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
43.0000
Other (At-Grade)
Single-Lane
2005
Whitby, ON
Durham
Canada
Des Newman Blvd. / Twin Streams Rd.
(43.89968, -78.98829)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
52.0000
Other (At-Grade)
Single-Lane
2020 Year Completed estimated (2019-2020).
Bowmanville, ON
Durham
Canada
Green Rd. / Clarington Blvd. / Boswell Dr.
(43.90509, -78.71026)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2019 East leg added with construction of roundabout. Year Completed estimated (2018-2019).
Bowmanville, ON
Durham
Canada
Port Darlington Rd. / East Shore Dr.
(43.89136, -78.65940)
Other
Existing
All-Way Yield
None
3 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
No splitter islands.
Oakbank, MB
Division 12
Canada
Garven Rd. / Provincial Road 206
(49.97438, -96.84232)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
50.0000
Other (At-Grade)
Single-Lane
2020 https://winnipeg.ctvnews.ca/roundabout-to-be-built-at-problem-intersection-in-manitoba-province-1.4999829
Charlottetown, PE
Queens
Canada
St Peters Rd. / Belvedere Ave. / Falconwood Dr. / Brackley Point Rd.
(46.25888, -63.11950)
Roundabout
Existing
All-Way Yield
Rectangular Rapid Flashing Beacon (RRFB)
5 Approaches
0 Driveways
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022 https://twitter.com/ChtownPE/status/1601305941785264128?cxt=HHwWgICqzaPR_bgsAAAA https://www.saltwire.com/atlantic-canada/news/major-charlottetown-roundabout-project-to-begin-in-july-100733988/
Bedford, NS
Halifax
Canada
Larry Uteck Blvd. / Broad St. / Brookline Dr.
(44.70824, -63.70896)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2022 https://www.cbc.ca/news/canada/nova-scotia/traffic-delays-bedford-larry-uteck-roundabout-1.6183663
Montreal, QC
Montreal
Canada
Avenue Pierre-de Coubertin / Avenue Desjardins
(45.55450, -73.55120)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2021
Caledonia, PE
Queens
Canada
PE 315 (Wood Islands Rd.) / PE 24 (Murray Harbour Rd.)
(46.06054, -62.71099)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.0000
Other (At-Grade)
Single-Lane
2020 https://www.peicanada.com/eastern_graphic/truckers-stress-disconnect-with-roundabouts/article_a22bf178-5d51-11ea-842b-d74254b428db.html
Campbell River, BC
Strathcona
Canada
Maryland Rd. / Willow Creek Rd.
(49.95296, -125.21632)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.0000
Other (At-Grade)
Single-Lane
2008 Year Completed estimated (2005-2009).
Revelstoke, BC
Columbia-Shuswap
Canada
Nichol Rd. / Nels Nelson Crescent / (unknown)
(50.97572, -118.17129)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2021 https://revelstokemountaineer.com/brief-construction-to-begin-on-new-roundabout-near-revelstoke-mountain-resort/
Edmonton, AB
Division 11
Canada
Blatchford Rd. NW / (unknown)
(53.57018, -113.51201)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
27.0000
Other (At-Grade)
Single-Lane
2024
Edmonton, AB
Division 11
Canada
Blatchford Rd. NW / Alpha Blvd. NW
(53.56939, -113.51664)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
31.0000
Other (At-Grade)
Single-Lane
2022
Dieppe, NB
Westmorland
Canada
Rue des Élèves / Belle-Forêt St. / Dieppe Blvd.
(46.07055, -64.69125)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2018 https://www.dieppe.ca/en/nouvelles/travaux-routiers-boulevard-dieppe-et-rue-bellefort.aspx
Charlottetown, PE
Queens
Canada
Brackley Point Rd. / Oak Dr.
(46.26962, -63.12694)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
20.0000
Other (At-Grade)
Single-lane w/ Traversable Central Island
2016 https://www.saltwire.com/prince-edward-island/news/local/reviews-good-for-new-brackley-point-roadoak-drive-mini-roundabout-102371/
Saint-Sauveur-des-Monts, QC
Les Pays-d'en-Haut Regional County Municipality
Canada
Avenue Saint-Denis / Chemin du Mont Saint-Sauveur
(45.88627, -74.14848)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2019-2024).
View Royal, BC
Capital
Canada
Six Mile Rd. / Atkins Rd.
(48.45846, -123.46432)
Roundabout
Existing
All-Way Yield
Rectangular Rapid Flashing Beacon (RRFB)
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2024 https://www.viewroyal.ca/EN/meta/new/2024-latest-news/new-roundabout-in-view-royal-is-complete.html?media=mobile
Niagara-on-the-Lake, ON
Niagara
Canada
York Rd. (Regional Road 81) / Glendale Ave. (Regional Road 89)
(43.16034, -79.16236)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
44.0000
Other (At-Grade)
Single-Lane
2023 Add-lane right-turn bypass lanes on west and south legs. https://www.insauga.com/construction-finally-finished-on-niagara-on-the-lakes-diverging-diamond-interchange/
Sherbrooke, QC
Sherbrooke
Canada
Rue Terrill / Rue des Grandes-Fourches N
(45.40783, -71.89476)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2023 Previous control type was a grade-separated interchange. https://www.sherbrookerecord.com/new-grandes-fourches-bridge-opens-in-sherbrooke/
Val-d’Or, QC
La Vallée-de-l'Or Regional County Municipality
Canada
Boulevard Barrette / 7e Rue
(48.08434, -77.79004)
Roundabout
Unknown
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Unknown
2024 Here's the construction tender: https://seao.ca/OpportunityPublication/ConsulterAvis/Categorie?ItemId=5993fe76-ad0e-4a4c-9002-bcbf9ee6f299&SubCategoryCode=C02&callingPage=4&searchId=f5dcd1ec-11bf-4860-b7dc-6c1ddd425347 A news article: https://www.lecitoyenrouynlasarre.com/article/2024/05/27/7e-rue%E2%80%AF-un-carrefour-giratoire-pret-d-ici-la-mi-septembre A Facebook post from the city: https://www.facebook.com/villedevaldor/posts/pfbid02e5dS7vEpjSSTvz1i4nsAhbWzrQ2qFr4V825kPb5f9L6V3rpqaaNV4ZjohEgx5gWpl
Sarnia, ON
Lambton
Canada
Rapids Pkwy. / Quinn Dr.
(42.98639, -82.35855)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
40.0000
Other (At-Grade)
Single-Lane
2023 https://www.theobserver.ca/news/local-news/new-sarnia-roundabout-could-open-soon
Antigonish, NS
Antigonish
Canada
Hwy. 4 (Old Hwy. 104) / Hwy. 7
(45.61419, -61.99859)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.0000
Other (At-Grade)
Single-Lane
2024 Year Completed estimated (2023-2024).
Edmonton, AB
Division 11
Canada
97 St. NW / 66 Ave. NW
(53.50289, -113.47947)
Traffic Calming Circle
Unknown
All-Way Yield
Unknown
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2015 No splitter islands.
Essa Township, ON
Simcoe
Canada
CR 21 / CR 56
(44.25352, -79.79946)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2023 https://barrie.ctvnews.ca/simcoe-county-opens-new-roundabout-in-essa-township-1.6691867
Springwater, ON
Simcoe
Canada
Wilson Dr. / Carson Rd. / Seadon Rd.
(44.41593, -79.75453)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2023 https://www.simcoe.com/news/growth-is-coming-wilson-drive-roundabout-opens-north-of-barrie/article_3e5d1463-0a87-51e4-a5ca-96ced0df7c93.html
Cowansville, QC
Brome-Missisquoi Regional County Municipality
Canada
Rte 104 (Boulevard Jean-Jacques-Bertrand) / Rte 241 (Rue Principale)
(45.20232, -72.69436)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
Other (At-Grade)
Unknown
2023 Year Completed estimated (2015-2024).
Waskatenau, AB
Division 12
Canada
Hwy 28 / Hwy 831
(54.09904, -112.80128)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
62.0000
Other (At-Grade)
Single-Lane
2021 Large truck apron. https://www.ae.ca/articles/award-winning-highway-28-roundabout-addresses-safety-concerns-and-reduces-traffic-delays/
Colwood, BC
Capital
Canada
Latoria Rd. / Veterans Memorial Pkwy. / Medalist Ave.
(48.40853, -123.50873)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Unknown
2023 https://www.colwood.ca/news-events/news/2023-12-15-000000/now-open-new-roundabout-latoria-road-and-veterans-memorial