City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Federal Way,
WA King Co. United States |
Weyerhaeuser Way S / 33rd Pl S / 32nd Dr. S (47.29863, -122.29280) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.6385 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2000 | Opened April 2000. Previously controlled by one-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
Federal Way,
WA King Co. United States |
S 323rd St. / 32nd Ave. S (47.31214, -122.29250) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.5368 |
Other (At-Grade) Single-Lane |
2000 | Opened April 2000. ICD estimated from Google Maps linework. |
Deer Park,
WA Spokane Co. United States |
US 395 / N Short Rd. / N Main St. (47.94267, -117.47734) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.2022 |
Other (At-Grade) Single-Lane |
2018 | Opened 7/18/2018. ICD estimated from Google Maps linework. |
Martinsville,
IN Morgan Co. United States |
SR 252 (Morgantown Rd.) / Cramertown Loop (39.42394, -86.39938) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Opened 12/2021 as part of the I-69 opening around Martinsville. https://i69finishline.com/construction-schedule/. |
Akron,
OH Summit Co. United States |
OH 91 (Canton Rd.) / East Market St. (41.05544, -81.43963) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Opened 10/15/2021. A quarter of the circle has 2 lanes. Pictures are here: https://twitter.com/AkronOhioMayor/status/1449057995766239232. |
Spokane Valley,
WA Spokane Co. United States |
SR 290 (E Trent Ave.) / Barker Rd. (47.69983, -117.15503) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2021 | Open to westbound traffic week of September 24, 2021. Fourth approach for north leg to be added at a later date by private developer. |
Bozeman,
MT Gallatin Co. United States |
Durston Rd. / Ferguson Ave. (45.68569, -111.09355) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.2023 |
Other (At-Grade) Single-Lane |
2019 | Open to traffic in 2019, not completed until 2020. https://www.youtube.com/watch?v=alzAe8c-fuU ICD estimated from Google Maps linework. |
Vista,
CA San Diego Co. United States |
S Santa Fe Ave. / Pala Vista Dr. (33.19467, -117.23597) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2021 | Open to traffic 2021 but incomplete. Year Completed estimated (2021-2022). |
Apex,
NC Wake Co. United States |
James St. / Minley Way (35.72147, -78.85924) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.3016 |
Other (At-Grade) Single-Lane |
2019 | Open to traffic 2015 but not completed until 2018-2019. ICD = 95 ft. ICD estimated from Google Maps linework. |
Davis,
CA Yolo Co. United States |
Engineering Bikeway / (unknown) (38.53777, -121.75421) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Open to bicycles and pedestrians only. | |
Greenacres,
WA Spokane Co. United States |
N Barker Rd. / I-90 EB Ramps (47.66457, -117.15376) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Open September 4, 2020. |
Woodland,
WA Cowlitz Co. United States |
SR 503 (Lewis River Rd.) / Scott Ave. (45.91699, -122.74009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 40.7138 |
Other (At-Grade) Single-Lane |
2015 | Open September 2015. ICD estimated from Google Maps linework. |
Kendall,
WA Whatcom Co. United States |
SR 542 / SR 547 (Kendall Corner) (48.91692, -122.13767) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.5337 |
Other (At-Grade) Single-Lane |
2015 | Open September 2015. ICD estimated from Google Maps linework. |
Ruston,
WA Pierce Co. United States |
Main St. / Bay View Corridor (47.29744, -122.50297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.1095 |
Other (At-Grade) Single-Lane |
2014 | Open September 2014. ICD estimated from Google Maps linework. |
Lenexa,
KS Johnson Co. United States |
Renner Rd. / W 86th St. (38.97310, -94.77980) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.2116 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Open September 2014. ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
W Metaline Ave. / N Nevada St. / W Montana St. (46.22031, -119.23826) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 14.0478 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | Open September 2013. ICD estimated from Google Maps linework. |
Poulsbo,
WA Kitsap Co. United States |
NE Lincoln Rd / Noll Rd. NE / Gala Way NE (47.75092, -122.61274) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Open September 2012. Replaced two offset T-intersections. |
Sammamish,
WA King Co. United States |
NE 8th St. / 233rd Ave NE (47.61687, -122.02903) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 63.6012 |
Other (At-Grade) Single-Lane |
2012 | Open September 2012. ICD estimated from Google Maps linework. |
Silverdale,
WA Kitsap Co. United States |
Silverdale Way NW / Chico Way NW / NW Newberry Hill Rd. (47.63704, -122.70135) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 15.2906 |
Other (At-Grade) Single-Lane |
2012 | Open September 2012. ICD estimated from Google Maps linework. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
Murray Rd. SW / 150th St. SW (47.12084, -122.54259) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open September 2012. |
Redmond,
WA King Co. United States |
NE Union Hill Rd. / 196th Ave. NE (47.67501, -122.07901) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open September 2012. |
Shawnee,
KS Johnson Co. United States |
W 55th St. / Hedge Lane Terr. (39.02902, -94.85512) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.5338 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Open September 2011. ICD estimated from Google Maps linework. |
Shawnee,
KS Johnson Co. United States |
W 55th St. / Johnson Dr. / K-7 Ramps (39.02903, -94.85268) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 105.7677 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2011 | Open September 2011. ICD estimated from Google Maps linework. |
Covington,
WA King Co. United States |
SE 256th St. / 164th Ave. SE (47.37256, -122.12290) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.1477 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2007 | Open September 2007. ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
E Wellesley Ave. / N Freya St. (47.70060, -117.35714) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.6198 |
Other (At-Grade) Single-Lane |
2016 | Open October 2016. ICD estimated from Google Maps linework. |
Lacey,
WA Thurston Co. United States |
Willamette Dr. NE / 31st Ave. NE (47.07789, -122.75228) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.9205 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | Open October 2015. ICD estimated from Google Maps linework. |
Seabeck,
WA Kitsap Co. United States |
Seabeck Hwy NW / NW Holly Rd. (47.60901, -122.75692) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2015 | Open October 2015. |
Cashmere,
WA Chelan Co. United States |
N Division St. / Cottage Ave. (47.52214, -120.46999) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2015 | Open October 2015. |
Sedro-Woolley,
WA Skagit Co. United States |
Cook Rd. / Ferry St. / Washington St. / Edward R Murrow St. (48.50715, -122.24729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 69.6321 |
Other (At-Grade) Single-Lane |
2013 | Open October 2013. ICD estimated from Google Maps linework. |
Bellingham,
WA Whatcom Co. United States |
N State St. / Wharf St. / N Forest St. / Boulevard (48.74361, -122.48473) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.8297 |
Other (At-Grade) Single-Lane |
2013 | Open October 2013. ICD estimated from Google Maps linework. |
Liberty Lake,
WA Spokane Co. United States |
Liberty Lake Rd. / Harvard Rd. / E Mission Ave. / I-90 WB Off-Ramp (47.67454, -117.11097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.0137 |
Freeway Ramps (Grade-Separated) Single-Lane |
2013 | Open October 2013. ICD estimated from Google Maps linework. |
Arlington,
WA Snohomish Co. United States |
SR 531 (172nd St NE) / SR 9 (48.15166, -122.11325) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.6373 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
Portland Ave. SW / Boundary St. SW / Camp Murray Gate (47.12106, -122.56300) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.6312 |
Other (At-Grade) Single-Lane |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Wenatchee,
WA Chelan Co. United States |
US 97 Alt / Ohme Garden Rd. / Warehouse Way (47.48082, -120.32091) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0940 |
Other (At-Grade) Single-Lane |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
N Waikiki Rd. / N Mill Rd. (47.76113, -117.42815) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.5085 |
Other (At-Grade) Single-Lane |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE Novelty Hill Rd. / 195th Ave. NE (47.68845, -122.07993) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.5909 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open October 2012. ICD estimated from Google Maps linework. |
Sedro-Woolley,
WA Skagit Co. United States |
SR 9 / Rhodes Rd. / Jameson Rd. (48.49863, -122.24720) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.4477 |
Other (At-Grade) Single-Lane |
2016 | Open November 2016. ICD estimated from Google Maps linework. |
Edmonds,
WA Snohomish Co. United States |
212th St. SW / 84th Ave. W / SW Bowdoin Way (47.80701, -122.34716) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 113.9049 |
Other (At-Grade) Single-Lane |
2014 | Open November 2014. ICD estimated from Google Maps linework. |
Topeka,
KS Shawnee Co. United States |
NW 46th St. / NW Topeka Blvd. (39.12957, -95.66378) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.3968 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Open November 2014. ICD estimated from Google Maps linework. |
Ferndale,
WA Whatcom Co. United States |
Slater Rd. / Pacific Hwy. (48.81718, -122.54435) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.8741 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2014 | Open November 2014. ICD estimated from Google Maps linework. |
Topeka,
KS Shawnee Co. United States |
NW 46th St. / NW Rochester Rd. (39.12910, -95.67268) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2014 | Open November 2014. |
Bellevue,
WA King Co. United States |
W Lake Sammamish Pkwy SE / I-90 WB Ramps (47.56690, -122.09947) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 139.9998 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2013 | Open November 2013. Raindrop shape. |
Mount Vernon,
WA Skagit Co. United States |
Anderson Rd. / Cedardale Rd. (48.39943, -122.32812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | Open November 2013. |
Wellington,
KS Sumner Co. United States |
US 160 (E 15th St.-E 16th St.) / N A St (37.27534, -97.39388) |
Roundabout Existing |
Unknown None |
4 Approaches 0 Driveways 116.8953 |
Other (At-Grade) Single-Lane |
2011 | Open November 2011. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE 116th St. / 162nd Ave. NE (47.70420, -122.12313) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 116.5413 |
Other (At-Grade) Single-Lane |
2014 | Open May 2014. ICD estimated from Google Maps linework. |
Fishers,
IN Hamilton Co. United States |
E 96th St. / Sargent Rd. (39.92707, -86.00638) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | Open June 8, 2020. https://twitter.com/DriveFishers/status/1270045736265297922 |
Lynden,
WA Whatcom Co. United States |
SR 546 / Northwood Rd. (48.96424, -122.40709) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.9551 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2016 | Open June 2016. ICD estimated from Google Maps linework. |
East Wenatchee,
WA Douglas Co. United States |
US 2-US 97 / Enterprise Dr. (47.51101, -120.29731) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2016 | Open June 2016. |
Bellingham,
WA Whatcom Co. United States |
Everson Goshen Rd. / E Smith Rd. (48.83263, -122.37755) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2015 | Open June 2015. |
Kennewick,
WA Benton Co. United States |
W 45th St. / S Olympia St. (46.16925, -119.13812) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.3928 |
Other (At-Grade) Single-Lane |
2014 | Open June 2014. ICD estimated from Google Maps linework. |
Hunts Point,
WA King Co. United States |
Hunts Point Rd. / NE 28th St. / 84th Ave. NE / SR 520 ramps (47.63600, -122.22744) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6536 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2014 | Open June 2014. ICD estimated from Google Maps linework. |
Bellingham,
WA Whatcom Co. United States |
Northwest Blvd. / McLeod Rd. (48.78262, -122.50297) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.6614 |
Other (At-Grade) Single-Lane |
2013 | Open June 2013. ICD estimated from Google Maps linework. |
Sedro-Woolley,
WA Skagit Co. United States |
SR 20 / Cook Rd. (48.50724, -122.24428) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 58.5542 |
Other (At-Grade) Single-Lane |
2014 | Open July 2014. ICD estimated from Google Maps linework. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
D St. / South Dr. / Integrity Gate (47.11600, -122.61932) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.3273 |
Other (At-Grade) Single-Lane |
2014 | Open July 2014. ICD estimated from Google Maps linework. |
Snohomish,
WA Snohomish Co. United States |
Ave. D / Bickford Ave. / 15th St. (47.93037, -122.10101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 79.2238 |
Other (At-Grade) Single-Lane |
2014 | Open July 2014. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
Eastridge Dr. NE / 244th Pl. NE (47.68499, -122.01300) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 16.8846 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2014 | Open July 2014. ICD estimated from Google Maps linework. |
Edgewood,
WA Pierce Co. United States |
Jovita Blvd. E / Emerald St. (47.25272, -122.29104) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.6695 |
Other (At-Grade) Single-Lane |
2013 | Open July 2013. ICD estimated from Google Maps linework. |
Airway Heights,
WA Spokane Co. United States |
Sprague Ave. / Quest Dr. (47.65441, -117.56614) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.4880 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Open July 2012. Concentric circulatory roadway striping. ICD estimated from Google Maps linework. |
(unincorporated),
WA Spokane Co. United States |
S Grove Rd. / I-90 EB Ramps (47.61877, -117.50139) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5277 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | Open July 2, 2021. |
Spokane,
WA Spokane Co. United States |
US 2 / (development entrance) (47.76691, -117.38533) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 49.7715 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Open July 19, 2018. This intersection was originally accepted in 2012 as stop control (evolving to a signal with growth) for the first phase of a development. Because there was a long lapse prior to construction, it became subject to the WSDOT Intersection Control Evaluation process adopted July 2013. Subsequently, this is the first roundabout in WSDOT Eastern Region recommended by a consultant employing that process. ICD estimated from Google Maps linework. |
Marysville,
WA Snohomish Co. United States |
SR 531 (172nd St. NE) / 23rd Ave. NE (48.15210, -122.19919) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2016 | Open January 2016. |
Joint Base Lewis-McChord,
WA Pierce Co. United States |
Colorado Ave. / Garcia Blvd. (47.09688, -122.58387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.4657 |
Other (At-Grade) Single-Lane |
2015 | Open January 2015. ICD estimated from Google Maps linework. |
Lawrence,
KS Douglas Co. United States |
Wakarusa Dr. / Legends Dr. / Inverness Dr. (38.96296, -95.30698) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.3602 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | Open January 2015. ICD estimated from Google Maps linework. |
Bonney Lake,
WA Pierce Co. United States |
Cascadia Blvd E. / Forest Park Blvd. E (47.12820, -122.18033) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.0035 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Open December 2014. ICD estimated from Google Maps linework. |
Anacortes,
WA Skagit Co. United States |
R Ave. / 22nd St. (48.50423, -122.60992) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.6011 |
Other (At-Grade) Single-Lane |
2013 | Open December 2013. ICD estimated from Google Maps linework. |
Mulvane,
KS Sumner Co. United States |
E 119th St. connector / (casino access) / I-35 NB Ramps (Kansas Turnpike) (37.47198, -97.32102) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 70.1040 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Open December 2011. |
Mulvane,
KS Sumner Co. United States |
E 119th St. connector / (casino access) / I-35 SB Ramps (Kansas Turnpike) (37.47137, -97.32445) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 70.1040 |
Freeway Ramps (Grade-Separated) Single-Lane |
2011 | Open December 2011. |
Noblesville,
IN Hamilton Co. United States |
E 141st St. / Promise Rd. (39.99383, -85.97090) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Open August 30, 2024. https://www.noblesville.in.gov/topic/subtopic.php?topicid=645&structureid=1 |
Snoqualmie,
WA King Co. United States |
SR 202 / Tokul Rd. / Mill Pond Rd. (47.54073, -121.83292) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.8938 |
Other (At-Grade) Single-Lane |
2016 | Open August 2016. ICD estimated from Google Maps linework. |
Kennewick,
WA Benton Co. United States |
S Clodfelter Rd. / W 10th St. (46.20097, -119.24385) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 52.9044 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | Open August 2015. ICD estimated from Google Maps linework. |
Kelso,
WA Cowlitz Co. United States |
SR 432 / Old Hwy 99 / I-5 NB Ramps / Kelso Dr. (46.10491, -122.87586) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Freeway Ramps (Grade-Separated) Single-Lane |
2015 | Open August 2015. Elliptical shape. ICD = approximately 110 ft x 100 ft. |
Yarrow Point,
WA King Co. United States |
92nd Ave. NE / NE Points Dr. / NE 33rd St. / SR 520 WB Off-Ramp (47.64153, -122.21728) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 86.9075 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | Open August 2014. ICD estimated from Google Maps linework. |
Lynden,
WA Whatcom Co. United States |
SR 546 / Bender Rd. (48.96442, -122.44116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.2849 |
Other (At-Grade) Single-Lane |
2013 | Open August 2013. ICD estimated from Google Maps linework. |
Lynden,
WA Whatcom Co. United States |
SR 546 / Depot Rd. (48.96478, -122.45217) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.2052 |
Other (At-Grade) Single-Lane |
2013 | Open August 2013. ICD estimated from Google Maps linework. |
Mill Creek,
WA Snohomish Co. United States |
SE 116th St. / 56th Ave SE (47.89201, -122.15856) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 80.8842 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2012 | Open August 2012. ICD estimated from Google Maps linework. |
Pasco,
WA Franklin Co. United States |
N 4th Ave. / N 3rd Ave. / W Marie St. (46.23961, -119.09537) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 61.1277 |
Other (At-Grade) Single-Lane |
2012 | Open August 2012. ICD estimated from Google Maps linework. |
Spokane,
WA Spokane Co. United States |
Freya St. / US 395 SB Ramps (47.72328, -117.35776) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.1548 |
Freeway Ramps (Grade-Separated) Single-Lane |
2012 | Open August 2012. ICD estimated from Google Maps linework. |
Redmond,
WA King Co. United States |
NE 116th St. / 172nd Ave. NE (47.70403, -122.11106) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.5420 |
Other (At-Grade) Single-Lane |
2015 | Open April 2015. ICD estimated from Google Maps linework. |
Airway Heights,
WA Spokane Co. United States |
US 2 / Spokane Tribe Casino Entrance (47.64293, -117.61009) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 49.0853 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | Open 11/13/2017. Casino open on January 8, 2018. First multilane on a WSDOT facility in Eastern Region. ICD estimated from Google Maps linework. |
Miami Springs,
FL Miami-Dade Co. United States |
Curtiss Pkwy. / Royal Poinciana / Westward Dr. / Palmetto Dr. (25.82130, -80.28160) |
Other Existing |
Other Unknown |
6 Approaches 0 Driveways 83.8565 |
Other (At-Grade) Multilane (3+ Lane) |
On-street parking within circulatory roadway, pedestrian access to central island, yield control on circulatory roadway, some stop-controlled entries. ICD estimated from Google Maps linework. | |
Amesbury,
MA Essex Co. United States |
Market St (Rte 150) / Elm St / Main St (Rte 150) / High St (42.85794, -70.93010) |
Traffic Calming Circle Existing |
Other None |
4 Approaches 0 Driveways 13.1324 |
Other (At-Grade) Single-Lane |
On-Street parking in the traffic circle ICD estimated from Google Maps linework. | |
Bend,
OR Deschutes Co. United States |
NE 18th St. / Cooley Rd. (44.11047, -121.27940) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.5914 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Only two legs to open initially - full operation in 2008. ICD estimated from Google Maps linework. |
Avon,
IN Hendricks Co. United States |
E CR 100 S / (unknown) (39.74854, -86.36651) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Only two legs finished as of June 2022, but it looks like north and south legs will be added. |
Ottawa,
ON Ottawa Canada |
Robert Grant Ave. / Abbott St. E (45.27428, -75.89569) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.8637 |
Other (At-Grade) Single-Lane |
2016 | Only two approaches upon initial opening in 2016. ICD estimated from Google Maps linework. |
Cary,
NC Wake Co. United States |
Carpenter Upchurch Rd. / Green Hope High School entrance (35.80318, -78.86969) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.4946 |
Other (At-Grade) Single-Lane |
2014 | Only one circulating lane is provided. South leg has two lanes (TH and RT); east leg has two lanes (LT and RT). ICD estimated from Google Maps linework. |
Boston Spa,
England Leeds United Kingdom |
Grange Moor Roundabout [A659 (Wattle Syke - Moor End) / A1(M) Ramps] (53.90620, -1.37749) |
Signalized Roundabout/Circle Existing |
Signal None |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
Only one approach is signalised. | |
Cheyenne,
WY Laramie Co. United States |
High Plains Rd. / I-25 NB Ramps (41.06046, -104.87620) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 55.8337 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Only 3 of the 5 approaches are currently in service. One is under construction for the new Southeast Wyoming Welcome Center. The last is a future extension of High Plains to the east. ICD estimated from Google Maps linework. |
Frisco,
TX Collin Co. United States |
John Hickman Pkwy. / Gridiron Rd. (33.11428, -96.83209) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2020 | Only 2 legs open as of 2021. E-W is 2 lanes, N-S is 1 lane |
James City,
NC Craven Co. United States |
Terminal Dr. / Airline Dr. / (parking) (35.07889, -77.03292) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Only 2 approaches but 4 exits. Year Completed estimated (2019-2022). |
St Louis,
MO St. Louis Co. United States |
Willow Village Pkwy. / Beckham Ridge Ct. / Willowbrooke Manors Ct. / Kennabrooke Ct. (38.68853, -90.41193) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | One-stage unmarked pedestrian crossings. |
Green Cove Springs,
FL Clay Co. United States |
Cold Stream Ln. / Evening Oaks Ln. (30.03912, -81.74621) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2019 | One-stage pedestrian crossings. Year Completed estimated (2018-2021). |
Cypress,
TX Harris Co. United States |
Blueberry Cedar Dr. / Maravillas Cove Dr. (29.94677, -95.74442) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5277 |
Other (At-Grade) Single-Lane |
2017 | One-stage pedestrian crossings. Year Completed estimated (2016-2017). |
Cypress,
TX Harris Co. United States |
Timberwood Run Dr. / Watchful Willow Dr. (29.94878, -95.74262) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5277 |
Other (At-Grade) Single-Lane |
2016 | One-stage pedestrian crossings. Year Completed estimated (2015-2016). |
Cypress,
TX Harris Co. United States |
Lumberton Dr. / Town Bluff Dr. (29.94483, -95.73031) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5277 |
Other (At-Grade) Single-Lane |
2015 | One-stage pedestrian crossings. Year Completed estimated (2014-2015). |
Miami,
FL Miami-Dade Co. United States |
NE 11th Ave. / NE 141st St. (25.90530, -80.17706) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-Lane |
2013 | One-stage pedestrian crossings. Year Completed estimated (2011-2013). |
Miami,
FL Miami-Dade Co. United States |
SW 28th St. / SW 32nd Ct. (25.73898, -80.24701) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 21.3360 |
Other (At-Grade) Single-Lane |
2012 | One-stage pedestrian crossings. Year Completed estimated (2011-2013). |
Miami,
FL Miami-Dade Co. United States |
SW 14th St. / SW 31st Ave. (25.75943, -80.24478) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 16.7640 |
Other (At-Grade) Single-Lane |
2008 | One-stage pedestrian crossings. Year Completed estimated (2007-2009). |
Miami,
FL Miami-Dade Co. United States |
SW 25th Ave. / SW 24th Terrace (25.74637, -80.23603) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-Lane |
2008 | One-stage pedestrian crossings. Year Completed estimated (2007-2009). |
Wichita,
KS Sedgwick Co. United States |
N Covington St. / W Fontana St. / N Landon Cir. (37.74034, -97.47556) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2007 | One-stage pedestrian crossings. Year Completed estimated (2006-2008). |
Miami,
FL Miami-Dade Co. United States |
NW 207th St. / NW 1st Ct. (25.96553, -80.20480) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-Lane |
2006 | One-stage pedestrian crossings. Year Completed estimated (2006-2007). |