29411 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Jackson, TN
Madison Co.
United States
N Highland Ave. / Deaderick St.
(35.61967, -88.81928)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2018 Painted spirals next to central island. https://www.jacksonsun.com/story/news/local/2018/05/11/construction-continues-north-highland-roundabout/578801002/
Starkville, MS
Oktibbeha Co.
United States
Blackjack Rd. / Oktoc Rd.
(33.44708, -88.79340)
Roundabout
Existing
Unknown
Unknown
3 Approaches
0 Driveways
31.8893
Other (At-Grade)
Single-Lane
2002 http://www.msstate.edu/web/media/detail.php?id=1874 Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework.
Watertown, WI
Jefferson Co.
United States
W Main St. (STH 19) / STH 26 SB Ramps
(43.19772, -88.76804)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
35.6971
Freeway Ramps (Grade-Separated)
Single-Lane
2010 ICD estimated from Google Maps linework.
Watertown, WI
Jefferson Co.
United States
W Main St. (STH 19) / STH 26 NB Ramps
(43.19772, -88.76607)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.3091
Freeway Ramps (Grade-Separated)
Single-Lane
2010 ICD estimated from Google Maps linework.
Watertown, WI
Jefferson Co.
United States
E Horseshoe Rd. / CTH T
(43.19009, -88.76381)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
32.2185
Other (At-Grade)
Single-Lane
2007 ICD estimated from Google Maps linework.
Watertown, WI
Jefferson Co.
United States
E Horseshoe Rd. / CTH A (Milford St.)
(43.16401, -88.76087)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.2014
Other (At-Grade)
Single-Lane
2010 ICD estimated from Google Maps linework.
Watertown, WI
Jefferson Co.
United States
Jefferson Rd. / CTH Y
(43.15325, -88.75062)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
36.5944
Other (At-Grade)
Single-Lane
2010 Near railroad crossing. ICD estimated from Google Maps linework.
Watertown, WI
Jefferson Co.
United States
E Horseshoe Rd. / Jefferson Rd.
(43.15839, -88.74851)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
31.3640
Other (At-Grade)
Single-Lane
2010 ICD estimated from Google Maps linework.
Whitewater, WI
Jefferson Co.
United States
Burr Oak Trl. / N Acorn Ridge
(42.85569, -88.74258)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.6434
Other (At-Grade)
Single-Lane
2007 Opened October 2007. Functional Class: Local ICD estimated from Google Maps linework.
Watertown, WI
Jefferson Co.
United States
CTH Y (S Church St.) / STH 26 SB Ramps
(43.15450, -88.74223)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.3362
Freeway Ramps (Grade-Separated)
Single-Lane
2011 ICD estimated from Google Maps linework.
Watertown, WI
Jefferson Co.
United States
CTH Y (S Church St.) / STH 26 NB Ramps
(43.15562, -88.74126)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
35.7217
Freeway Ramps (Grade-Separated)
Single-Lane
2011 ICD estimated from Google Maps linework.
Whitewater, WI
Jefferson Co.
United States
Burr Oak Trl. / (unknown)
(42.85222, -88.74105)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
29.7695
Other (At-Grade)
Single-Lane
2007 Opened November 2007. Functional Class: Local ICD estimated from Google Maps linework.
Dale, WI
Outagamie Co.
United States
US 45 / STH 96 (Wisconsin Rd.)
(44.27234, -88.73946)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
35.0622
Other (At-Grade)
Single-Lane
2018 date: https://www.whby.com/2018/04/15/roundabout-project-to-start-at-hwys-45-96/# ICD estimated from Google Maps linework.
Watertown, WI
Dodge Co.
United States
BUS 26 (N Church St.) / STH 16 WB Ramps / Provimi Rd.
(43.21918, -88.73837)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
43.5177
Freeway Ramps (Grade-Separated)
Single-Lane
2011 ICD estimated from Google Maps linework.
Watertown, WI
Dodge Co.
United States
BUS 26 (N Church St.) / STH 16 EB Ramps
(43.21605, -88.73625)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
38.2976
Freeway Ramps (Grade-Separated)
Single-Lane
2011 ICD estimated from Google Maps linework.
Watertown, WI
Jefferson Co.
United States
BUS 26 (S Church St.) / High Rd.
(43.16088, -88.73526)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
41.8169
Other (At-Grade)
Multilane (2 Lane, unspecified)
2011 ICD estimated from Google Maps linework.
De Kalb, IL
DeKalb Co.
United States
Health Services Dr. / (unknown) / (parking lot)
(41.96413, -88.72497)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.0746
Other (At-Grade)
Single-Lane
2011 Year Completed estimated (2010-2011). ICD estimated from Google Maps linework.
De Kalb, IL
DeKalb Co.
United States
E Gurler Rd. / N Peace Rd.
(41.89286, -88.72396)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2020 https://www.facebook.com/1360WlbkRadio/posts/wlbk-local-newsdekalbs-new-roundabout-is-opening-soon-dekalb-city-manager-bill-n/3211580668940104/
Whitewater, WI
Walworth Co.
United States
BUS 12-STH 59 (E Milwaukee St.-Elkhorn Rd.) / Bluff Rd. / Clay St.
(42.83102, -88.71045)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.2833
Other (At-Grade)
Multilane (2 Lane, unspecified)
2007 Opened October 2007. ICD estimated from Google Maps linework.
Paducah, KY
McCracken Co.
United States
(unknown) / (unknown)
(37.07051, -88.70338)
Roundabout
Existing
All-Way Yield
None
4 Approaches
1 Driveways
39.6240
Other (At-Grade)
Single-Lane
2017 External truck apron on northeast leg. Year Completed estimated (2015-2018).
Gautier, MS
Jackson Co.
United States
N Dolphin Dr. / William Payne Adams Blvd. / (unknown)
(30.39643, -88.65932)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.1462
Other (At-Grade)
Multilane (2 Lane, unspecified)
2013 ICD estimated from Google Maps linework.
Keshena, WI
Menominee Co.
United States
STH 47-STH 55 / Standing Pines Dr.
(44.85970, -88.62769)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
26.2441
Other (At-Grade)
Multilane (2 Lane, unspecified)
2018 https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.859088195652475%2C-88.62733226609475&z=17 ICD estimated from Google Maps linework.
Marengo, IL
McHenry Co.
United States
SR 23 / Harmony Rd.
(42.18243, -88.61803)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2020 Yield-controlled right-turn bypass lane on north leg.
Marengo, IL
McHenry Co.
United States
SR 23 / I-90 WB Ramps
(42.17930, -88.61798)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2020 Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp.
Marengo, IL
McHenry Co.
United States
SR 23 / I-90 EB Ramps
(42.17539, -88.61798)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Freeway Ramps (Grade-Separated)
Single-Lane
2020 Yield-controlled right turn bypass lane on east leg off freeway exit ramp. Merging right turn bypass lane on south leg onto freeway entrance ramp.
Ixonia, WI
Jefferson Co.
United States
STH 16 / American St. (CTH F)
(43.14647, -88.59080)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
47.0551
Other (At-Grade)
Single-Lane
2014 ICD estimated from Google Maps linework.
Oshkosh, WI
Winnebago Co.
United States
STH 21 (Omro Rd.) / Brooks Ln. / N Washburn St.
(44.03244, -88.58758)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.9435
Other (At-Grade)
Multilane (3+ Lane)
2012 Opened June 8, 2012. Three-lane roundabout. Series of 4 roundabouts. Functional Class: Arterial ICD estimated from Google Maps linework.
Oshkosh, WI
Winnebago Co.
United States
W 9th Ave. / S Washburn St.
(44.01085, -88.58483)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
50.2920
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2011
Oshkosh, WI
Winnebago Co.
United States
CR T / CR Y
(44.08259, -88.58346)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
29.1697
Other (At-Grade)
Single-Lane
2013 Year Completed estimated (2011-2015). ICD estimated from Google Maps linework.
Oshkosh, WI
Winnebago Co.
United States
CTH E (Witzel Ave.) / Washburn St.
(44.01808, -88.58321)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
50.2920
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2010 Opened September 24, 2010.
Oshkosh, WI
Winnebago Co.
United States
STH 21 (Omro Rd.) / US 41 SB Ramps
(44.03272, -88.58319)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
60.1058
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
2012 Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework.
Oshkosh, WI
Winnebago Co.
United States
W 9th Ave. / US 41 SB Ramps
(44.01089, -88.58318)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
50.2920
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2011
Oshkosh, WI
Winnebago Co.
United States
STH 21 (Omro Rd.) / US 41 NB Ramps
(44.03271, -88.58178)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
140.8193
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
2012 Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework.
Oshkosh, WI
Winnebago Co.
United States
W 9th Ave. / US 41 NB Ramps
(44.01078, -88.58145)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
50.2920
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2011
Oshkosh, WI
Winnebago Co.
United States
CTH E (Witzel Ave.) / Koeller St.
(44.01805, -88.58098)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.7680
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2010 Opened September 24, 2010.
Oshkosh, WI
Winnebago Co.
United States
W 9th Ave. / S Koeller St.
(44.01079, -88.57978)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
50.2920
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2011
Oshkosh, WI
Winnebago Co.
United States
STH 21 (Omro Rd.) / N Koeller St. / Oshkosh Ave.
(44.03258, -88.57882)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2012 Roundabout relocated to west of previous intersection. Series of 4 roundabouts. Opened June 18, 2012.
Oshkosh, WI
Winnebago Co.
United States
US 45 / US 41 SB Ramps
(44.06074, -88.57443)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
54.8640
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2011
Oshkosh, WI
Winnebago Co.
United States
US 45 / Fernau Ave. / Lake Butte des Morts Dr.
(44.05513, -88.57150)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
50.2920
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2010 Opened August 24, 2010.
Neenah, WI
Winnebago Co.
United States
STH 76 / CR JJ (Breezewood Ln.)
(44.15610, -88.54400)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, unspecified)
2020
Neenah, WI
Winnebago Co.
United States
STH 76 / CR G
(44.14099, -88.54394)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2020
Neenah, WI
Winnebago Co.
United States
STH 76 / CR GG
(44.11205, -88.54355)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2020
Greenville, WI
Outagamie Co.
United States
Parkview Dr. / Reimer Dr.
(44.30527, -88.54295)
Traffic Calming Circle
Existing
One-Way/Two-Way Stop
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
Oshkosh, WI
Winnebago Co.
United States
Jackson St. / Murdock Ave.
(44.03947, -88.54265)
Roundabout
Existing
All-Way Yield
Rectangular Rapid Flashing Beacon (RRFB)
4 Approaches
0 Driveways
41.1480
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2010
Greenville, WI
Outagamie Co.
United States
Parkview Dr. / Orchid Way
(44.30454, -88.54160)
Traffic Calming Circle
Existing
One-Way/Two-Way Stop
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
(unincorporated), WI
Outagamie Co.
United States
STH 76 / CTH O
(44.35172, -88.53697)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
40.1389
Other (At-Grade)
Single-Lane
2010 Opened September 24, 2010. High-speed approach roadways. ICD estimated from Google Maps linework.
Pascagoula, MS
Jackson Co.
United States
Hospital Rd. / Old Mobile Hwy.
(30.36849, -88.53333)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
88.6193
Other (At-Grade)
Single-Lane
2017 http://cityofpascagoula.com/482/Hospital-Road-Improvements ICD estimated from Google Maps linework.
Oshkosh, WI
Winnebago Co.
United States
Country Park Dr. / Community Park Dr.
(44.07467, -88.53138)
Other
Existing
Unknown
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
No splitter islands.
Coral, IL
McHenry Co.
United States
US 20 / Harmony Rd.
(42.16114, -88.52668)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.7680
Other (At-Grade)
Single-Lane
2020
Appleton, WI
Outagamie Co.
United States
Challenger Dr. / (unknown) / (airport terminal loop)
(44.26217, -88.50818)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
42.6717
Other (At-Grade)
Single-Lane
2019 Entrance to Appleton International Airport.
Greenville, WI
Outagamie Co.
United States
CTH CB / W Atlantis Dr.
(44.26708, -88.50676)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
59.4360
Other (At-Grade)
Multilane (2 Lane, unspecified)
2019 Access to airport.
Greenville, WI
Outagamie Co.
United States
CR CB / Greenville Dr. / Wally Way
(44.28549, -88.50618)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
32.4894
Other (At-Grade)
Multilane (2 Lane, unspecified)
2012 Year Completed estimated (2011-2012). ICD estimated from Google Maps linework.
Greenville, WI
Outagamie Co.
United States
STH 15 / CTH CB (Greenville Dr.)
(44.28721, -88.50600)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
52.1525
Other (At-Grade)
Multilane (2 Lane, unspecified)
2013 Opened August 2013. ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
CR JJ (Winneconne Ave.) / Pendleton Rd. / CR CB
(44.17142, -88.50521)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
51.8160
Other (At-Grade)
Single-Lane
2022 Yield-controlled right-turn bypass lane on east leg. https://www.postcrescent.com/story/news/local/2022/05/20/neenah-roundabout-construction-start-june-september-winnebago-county-cb-jj/9794939002/
Neenah, WI
Winnebago Co.
United States
Oakridge Rd. / CR CB
(44.18512, -88.50515)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
46.2479
Other (At-Grade)
Multilane (2 Lane, unspecified)
2019 https://fox11online.com/news/local/new-roundabout-legacy-of-victim-killed-in-town-of-neenah-crash ICD estimated from Google Maps linework.
Yorkville, IL
Kendall Co.
United States
Fox Rd. / Eldamain Rd. / (unknown)
(41.62718, -88.49774)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2023 https://www.youtube.com/watch?v=69pkvRANbUs
Grand Chute, WI
Outagamie Co.
United States
W College Ave. / Mayflower Dr.
(44.26220, -88.49662)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2020 Year Completed estimated (2019-2020).
Menasha, WI
Winnebago Co.
United States
CTH CB / Mutual Way
(44.23560, -88.49555)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
56.3880
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2018 Yield-controlled right-turn bypass lane on west leg.
Corinth, MS
Alcorn Co.
United States
Harper Rd. / Droke Rd.
(34.92347, -88.49539)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2010 School 1000' west of roundabout.
Neenah, WI
Winnebago Co.
United States
Breezewood Ln. / Tullar Rd.
(44.15640, -88.49503)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
23.1352
Other (At-Grade)
Single-Lane
2005 Right turn bypass lane on east leg. Opened September 2005. Functional Class: Arterial ICD estimated from Google Maps linework.
Oconomowoc, WI
Waukesha Co.
United States
Wisconsin Ave. / Walnut St.
(43.10956, -88.49469)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
36.6205
Other (At-Grade)
Multilane (2 Lane, unspecified)
2008 Opened August 15, 2008. ICD estimated from Google Maps linework.
Sugar Grove, IL
Kane Co.
United States
Dugan Rd. / Granart Rd. / Bucktail Ln.
(41.76143, -88.48939)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
36.5260
Other (At-Grade)
Multilane (2 Lane, unspecified)
2015 date: https://www.kcchronicle.com/2015/08/18/sugar-grove-roundabout-opens/a5jsq7l/ Granart Rd. moved about 300 ft south to align with Bucktail Ln. ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
Breezewood Ln. / Gillingham Rd. / Bergstrom Rd.
(44.15643, -88.48816)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.5587
Other (At-Grade)
Multilane (2 Lane, unspecified)
2012 Opened October 12, 2012. Functional Class: Arterial ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
Breezewood Ln. / US 41 SB Ramps
(44.15623, -88.48662)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.1274
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
2012 Opened October 12, 2012. ICD estimated from Google Maps linework.
Grand Chute, WI
Outagamie Co.
United States
W Greenville Dr. / N McCarthy Rd.
(44.27984, -88.48649)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
44.1960
Other (At-Grade)
Single-Lane
2020 Elliptical shaped. ICD = 145 ft x 130 ft. https://www.facebook.com/AyresAssociatesInc/videos/roundabout-at-mccarthy-road-and-greenville-drive-town-of-grand-chute-wi/1396427694078498/
Grand Chute, WI
Outagamie Co.
United States
W College Ave. / McCarthy Rd.
(44.26207, -88.48603)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2020 Year Completed estimated (2019-2020).
Neenah, WI
Winnebago Co.
United States
Green Bay Rd. / Shopko Dr.
(44.17852, -88.48511)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
37.6877
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
Breezewood Ln. / US 41 NB Ramps
(44.15602, -88.48505)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.4139
Freeway Ramps (Grade-Separated)
Multilane (3+ Lane)
2012 Opened October 12, 2012. ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
Winneconne Ave. / S Green Bay Rd.
(44.17697, -88.48500)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
47.1109
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 Opened November 2010. Functional Class: Arterial ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
S Green Bay Rd. / Fox Point Plaza
(44.17558, -88.48499)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
37.6896
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 Functional Class: Arterial ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
S Green Bay Rd. / W Cecil St.
(44.17098, -88.48497)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
27.4128
Other (At-Grade)
Multilane (2 Lane, unspecified)
2007 Opened October 2007. ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
Winneconne Ave. / S Lake St. / Fox Point Plaza
(44.17743, -88.48352)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
41.9712
Other (At-Grade)
Multilane (2 Lane, unspecified)
2010 Opened November 2010. Functional Class: Arterial ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
Breezewood Ln. / W Bell St. / Harrison St.
(44.15568, -88.48331)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
41.1298
Other (At-Grade)
Multilane (3+ Lane)
2012 Opened October 12, 2012. Functional Class: Arterial ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
Co. Hwy. PP / Jacobsen Rd. / American Dr.
(44.21429, -88.47825)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.8167
Other (At-Grade)
Single-Lane
2007 ICD estimated from Google Maps linework.
Grand Chute, WI
Outagamie Co.
United States
Olde Casaloma Dr. / W Converters Dr. / N Victory Dr.
(44.28936, -88.47671)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
34.1971
Other (At-Grade)
Unknown
2018 ICD estimated from Google Maps linework.
Oconomowoc, WI
Waukesha Co.
United States
Pabst Rd. / Olympia Fields Dr.
(43.08687, -88.47287)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.7680
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022
Neenah, WI
Winnebago Co.
United States
Marathonh Ave. / Fort Dr.
(44.14576, -88.47097)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
21.4254
Other (At-Grade)
Single-Lane
2010 ICD estimated from Google Maps linework.
Campton Hills, IL
Kane Co.
United States
SR 47 / Burlington Rd.
(41.98813, -88.47064)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2016 Rural, high-speed approaches.
Fond du Lac, WI
Fond Du Lac Co.
United States
W Pioneer Rd. / S Military Rd.
(43.76131, -88.47064)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
43.9914
Other (At-Grade)
Multilane (2 Lane, unspecified)
2017 https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=43.760977353650404%2C-88.47475648794119&z=15. ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
Castle Oak Dr. / Marathon Ave.
(44.14932, -88.47024)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
23.1380
Other (At-Grade)
Single-Lane
2016 https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.14891305159338%2C-88.47012163076346&z=16. ICD estimated from Google Maps linework.
Elgin, IL
Kane Co.
United States
SR 47 / Plato Rd.
(42.01941, -88.46401)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2020 Year Completed estimated (2019-2020).
Fond du Lac, WI
Fond Du Lac Co.
United States
W Pioneer Rd. / S Hickory St.
(43.75473, -88.46229)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
35.3695
Other (At-Grade)
Multilane (2 Lane, unspecified)
2013 ICD estimated from Google Maps linework.
Rubicon, WI
Dodge Co.
United States
STH 60 / CTH P
(43.32538, -88.45889)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
42.5730
Other (At-Grade)
Single-Lane
2014 ICD estimated from Google Maps linework.
Fond du Lac, WI
Fond Du Lac Co.
United States
W Pioneer Rd. / Morris St.
(43.75418, -88.45711)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
37.9579
Other (At-Grade)
Multilane (2 Lane, unspecified)
2013 ICD estimated from Google Maps linework.
Fond du Lac, WI
Fond Du Lac Co.
United States
S Military Rd. / W 9th St.
(43.76954, -88.45704)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2022
Grand Chute, WI
Outagamie Co.
United States
N Bluemound Dr. / W Glenpark Dr.
(44.28499, -88.45678)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
37.6196
Other (At-Grade)
Multilane (2 Lane, unspecified)
2012 ICD estimated from Google Maps linework.
Grand Chute, WI
Outagamie Co.
United States
N Bluemound Dr. / Tri-Park Way
(44.28158, -88.45652)
Roundabout
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
41.0419
Other (At-Grade)
Multilane (2 Lane, unspecified)
2012 ICD estimated from Google Maps linework.
Neenah, WI
Winnebago Co.
United States
E. North Water St. / 1st St.
(44.18921, -88.45475)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
29.9734
Other (At-Grade)
Single-Lane
2006 Opened October 2006. ICD estimated from Google Maps linework.
Mayville, WI
Dodge Co.
United States
STH 33 / CR P
(43.43082, -88.45031)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2019 https://www.washingtoncountyinsider.com/dodge-county-highway-p-and-wi-33-roundabout-nears-completion-by-ron-naab/
Menasha, WI
Winnebago Co.
United States
Racine Road Connector / US 10 WB Ramps
(44.22103, -88.44994)
Roundabout
Existing
All-Way Yield
Unknown
2 Approaches
0 Driveways
45.3638
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2017 ICD estimated from Google Maps linework.
Theresa, WI
Dodge Co.
United States
STH 67-STH 175 / STH 28 / CR TW
(43.53623, -88.44702)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
51.8160
Other (At-Grade)
Single-Lane
2022 External truck aprons on north, east, and south legs.
Menasha, WI
Winnebago Co.
United States
Racine St. / Main St.
(44.20131, -88.44619)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022 https://fox11online.com/news/state/wisconsin-roundabouts-traffic-intersections-lee-rodegerdts-washington-post-analysis-data-study Image of this roundabout is the 2nd picture in the set of 5 at the top of the page.
(unincorporated), WI
Outagamie Co.
United States
CTH A / CTH JJ
(44.31701, -88.44591)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
40.1627
Other (At-Grade)
Single-Lane
2010 ICD estimated from Google Maps linework.
Menasha, WI
Winnebago Co.
United States
Racine Rd / US 10 Ramps
(44.21780, -88.44526)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
52.2141
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2016 ICD estimated from Google Maps linework.
Menasha, WI
Winnebago Co.
United States
Ahnaip St. / Racine St. / Keyes St. / Naymut St.
(44.19843, -88.44508)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2022 Previously a 3-way stop. https://www.wearegreenbay.com/news/local-news/supply-chain-issues-halting-construction-progression-in-winnebago-county/
Woodstock, IL
McHenry Co.
United States
S Madison St. / S South St. / Lake Ave.
(42.31289, -88.44469)
Roundabout
Existing
All-Way Yield
Unknown
5 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2022 https://www.woodstockil.gov/publicworks/page/south-lake-madison-roundabout
Summit, WI
Waukesha Co.
United States
CTH P (N Sawyer Rd.) / Pabst Farms Blvd. / CTH DR
(43.06441, -88.44336)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.3731
Other (At-Grade)
Multilane (2 Lane, unspecified)
2011 Opened November 23, 2011. ICD estimated from Google Maps linework.
Summit, WI
Waukesha Co.
United States
CTH P (N Sawyer Rd.) / CTH DR (Delafield Rd.)
(43.05922, -88.44241)
Roundabout
Existing
All-Way Yield
None
3 Approaches
1 Driveways
36.6506
Other (At-Grade)
Single-Lane
2011 Opened August 11, 2011. ICD estimated from Google Maps linework.
Summit, WI
Waukesha Co.
United States
CTH P (N Sawyer Rd.) / I-94 EB Ramps
(43.06063, -88.44229)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
34.9046
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2011 Opened November 23, 2011. ICD estimated from Google Maps linework.
Summit, WI
Waukesha Co.
United States
CTH P (N Sawyer Rd.) / I-94 WB Ramps
(43.06174, -88.44228)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
47.1203
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, unspecified)
2011 Opened November 23, 2011. ICD estimated from Google Maps linework.