City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Laddonia,
MO Audrain Co. United States |
US 54 / MO 19 / CR J (39.28073, -91.64373) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/node/27038 |
Holts Summit,
MO Callaway Co. United States |
MO OO (E Simon Blvd.) / US 54 EB Ramps (38.65479, -92.11091) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. https://www.modot.org/node/29043 |
Lathrop,
MO Clinton Co. United States |
US 69 / MO-116 (39.55283, -94.23581) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/clinton-county-us-route-69-and-route-116-intersection-improvement-project |
Duquesne,
MO Jasper Co. United States |
S Duquesne Rd. / E 20th St. (37.06932, -94.45964) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2010 | |
Belton,
MO Cass Co. United States |
Loch Lloyd Pkwy. / Argyle Dr. (38.84299, -94.59884) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2016). |
Platte City,
MO Platte Co. United States |
MO 92 / MO 45 Spur (39.33177, -94.89577) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2022). |
Rolla,
MO Phelps Co. United States |
US 63 (N Bishop Ave.) / University Dr. (37.95373, -91.77712) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Entrance to Missouri S&T campus. http://moverollatdd.com/university-drive-realignment/ |
Rolla,
MO Phelps Co. United States |
McCutchen Dr. / St Marias St. (37.95999, -91.74801) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Kansas City,
MO Clay Co. United States |
N Shoal Creek Pkwy. / Maplewoods Pkwy. (39.28995, -94.55702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2021 | Merging right-turn bypass lane lane on west leg. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / NE 106th St. / NE Staley Ferris Dr. (39.28508, -94.55712) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2021 | Peanut shaped. Replaced two offset T-intersections. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / New Mark Dr. / NE 100th St. (39.27475, -94.55715) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / NE 96th St. (39.26747, -94.55716) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | East leg stubbed. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Platte Co. United States |
Line Creek Pkwy. / Tiffany Springs Rd. (39.25957, -94.61010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Kansas City,
MO Clay Co. United States |
N Booth Ave. / NE Shoal Creek Valley Dr. / Commercial Dr. (39.24626, -94.47674) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Yield-controlled right-turn bypass lane on west leg. Year Completed estimated (2020-20210. |
Kansas City,
MO Clay Co. United States |
NE Shoal Creek Valley Dr. / (unknown) (39.24673, -94.47459) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2020 | |
Sedalia,
MO Pettis Co. United States |
Rte Y (W 16th St.) / Winchester Dr. (38.69957, -93.27763) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Raymore,
MO Cass Co. United States |
MO 58 / Ward Rd. (38.80255, -94.40147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.raymore.com/Home/Components/News/News/2466/ |
Raymore,
MO Cass Co. United States |
S Madison St. / (park access) (38.78857, -94.45769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2009-2010). |
Waynesville,
MO Pulaski Co. United States |
Historic Route 66 / Hwy T (37.81205, -92.23491) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2018). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / Raider Rd. / US 67 SB Ramps (37.91037, -90.53216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Elliptical shaped. ICD = 155 ft x 145 ft. Year Completed estimated (2007-2009). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / US 67 NB Ramps (37.91294, -90.53029) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Grandview,
MO Jackson Co. United States |
US 71 NB Frontage Road / I-49-US 71 NB Ramps (38.86704, -94.52594) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
US 71 SB Frontage Rd. / I-49-US 71 SB Ramps (38.87725, -94.52680) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
Main St. / US 71 Frontage Rd. (38.88876, -94.52422) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Unknown |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
Lawnbale St. / E 139th St. (38.87251, -94.52865) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Point Lookout,
MO Taney Co. United States |
Opportunity Ave. / L W Hyer Dr. (36.61436, -93.23741) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Kearney,
MO Clay Co. United States |
W 19th St. / Watson Dr. (39.35316, -94.37542) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Designed for future expansion to multilane. https://www.modot.org/interstate-35-interchange-improvements-clay |
Kearney,
MO Clay Co. United States |
W 19th St. / Sam Barr Dr. (future) (39.35391, -94.38445) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | North leg (Sam Barr Dr.) stubbed on opening in 2023. https://www.modot.org/interstate-35-interchange-improvements-clay |
Kearney,
MO Clay Co. United States |
Nation Rd. / W 19th St. / NE 144th St. (39.35350, -94.38891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.modot.org/interstate-35-interchange-improvements-clay |
Springfield,
MO Greene Co. United States |
S Grant Ave / W Chrisman St. / (parking) (37.18891, -93.29950) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | https://sgfneighborhoodnews.com/construction-wraps-up-on-first-section-of-grant-avenue-parkway/ |
Republic,
MO Greene Co. United States |
E Hines St. / N Lynn Ave. (37.12559, -93.46198) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://republicmo.com/1814/Hines-Lynn-Road-Closure |
Blomeyer,
MO Cape Girardeau Co. United States |
MO 25 / MO 77 / Nash Rd. (37.22343, -89.66024) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2011 | |
Weldon Spring,
MO St. Charles Co. United States |
Technology Dr. / Meadows Pkwy. / Wolfrum Rd. / I-64 WB Exit Ramp (38.70526, -90.67410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Freeway Ramps (Grade-Separated) Single-Lane |
Oval shaped. ICD = 200 ft x 180 ft. Built initially as 2x2 roundabout in 2005-2006. Concentric circulatory roadway striping. Converted to single lane using by striping out inner circulatory roadway lane and left entry lane on southwest leg 2020-2021. | |
Chesterfield,
MO St. Louis Co. United States |
N Outer 40 Rd. / I-64 WB Exit Ramp (38.67582, -90.65115) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2010 | Year Completed estimated (2009-2010). |
Raymore,
MO Cass Co. United States |
MO 58 (E Walnut St.) / N Prairie Ln. / S Prairie Ln. (38.80333, -94.42059) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.modot.org/route-58-intersection-improvements |
O'Fallon,
MO St. Charles Co. United States |
Hwy DD / Dalriada Blvd. (38.74631, -90.75882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2022 | Right-turn-only lanes on southwest and northeast legs. Appears to be convertible to 2x1. https://www.sccmo.org/DocumentCenter/View/18378/OF_HIGHWAY-DD |
Nixa,
MO Christian Co. United States |
W Pembrook Ave. / S Norton Rd. (37.03000, -93.30859) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | No splitter island south leg. https://www.nixa.com/blog/2023/06/29/nixa-set-to-open-truman-blvd-tomorrow/ |
Wentzville,
MO St. Charles Co. United States |
Prospect Rd. / I-64 EB Exit Ramp (38.79596, -90.82043) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Interchange replaced single at-grade intersection. Year Completed estimated (2008-2009). |
Wentzville,
MO St. Charles Co. United States |
Prospect Rd. / Corporate Pkwy. / I-64 WB Exit Ramp (38.79597, -90.81810) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Interchange replaced single at-grade intersection. Year Completed estimated (2008-2009). |
O'Fallon,
MO St. Charles Co. United States |
Connecting Rd. / Alta Mira Ct. / MO 364 WB Ramps (38.76954, -90.74393) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | |
O'Fallon,
MO St. Charles Co. United States |
Paul Renaud Blvd. / Lake St Louis Blvd. / Curtis Ln. (38.75382, -90.80034) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2018). |
O'Fallon,
MO St. Charles Co. United States |
Technology Dr. / Waterbury Falls Dr. (38.71843, -90.69627) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2003). Southwest leg added 2008-2009. |
O'Fallon,
MO St. Charles Co. United States |
Technology Dr. / Progress Point Pkwy. / (parking) (38.71685, -90.69499) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2003 | Year Completed estimated (2002-2003). |
Weldon Spring,
MO St. Charles Co. United States |
Weldon Spring Rd. / Technology Dr. / Siedentop Rd. (38.71551, -90.68906) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2004 | Painted splitter island on east leg. Year Completed estimated (2003-2004). |
New Florence,
MO Montgomery Co. United States |
MO 19 / Tree Farm Rd. / I-70 EB Ramps (38.89821, -91.45624) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.modot.org/node/35298 |
New Florence,
MO Montgomery Co. United States |
MO 19 / Booneslick Rd. / I-70 WB Ramps (38.90090, -91.45707) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.modot.org/node/35298 Combined freeway interchange with at-grade intersection. Previously, the interchange was stop controlled and the intersection had traffic lights. |
Columbia,
MO Boone Co. United States |
Tiger Ave. / Hospital Dr. / (parking) (38.93766, -92.33084) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.columbiamissourian.com/news/higher_education/roundabout-at-tiger-avenue-and-hospital-drive-opens-to-drivers/article_fc81909a-2d89-11ee-ad36-cbd098b5227c.html |
St Peters,
MO St. Charles Co. United States |
Executive Centre Pkwy. / Jungermann Cir. (38.79655, -90.58169) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2015 | Two circulating lanes throughout even though side street has only one entering lane. Year Completed estimated (2014-2015). |
St Peters,
MO St. Charles Co. United States |
Jungermann Cir. / Wellness Dr. (38.79591, -90.57980) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2014-2015). |
Neosho,
MO Newton Co. United States |
SR 86 / Hammer Rd. (36.88055, -94.42702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.facebook.com/JoplinNewsFirst/videos/live-koamtrafficalert-neosho-roundabout-mo-86-at-hammer-road-in-neosho-is-open-a/328370780290443/ |
Hazelwood,
MO St. Louis Co. United States |
Dunn Rd. / Sieloff Dr. / I-270 WB Entrance Ramp (38.77626, -90.33959) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Left-turn-only lane on east leg. Little deflection westbound. |
Spanish Lake,
MO St. Louis Co. United States |
Dunn Rd. / I-270 WB Ramps (38.77088, -90.22381) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2020 | Left-turn-only lane on east leg. Little deflection westbound. |
Columbia,
MO Boone Co. United States |
Nocona Pkwy. / Artemis Dr. (38.89292, -92.28649) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Wentzville,
MO St. Charles Co. United States |
Veterans Memorial Pkwy. / I-70 EB Ramps / Ruggeri Rd. (38.80935, -90.87713) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Des Peres,
MO St. Louis Co. United States |
Des Peres Rd. / Old des Peres Rd. / (parking) (38.59822, -90.45349) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.youtube.com/watch?v=njKGqjmTBVA |
Lake St Louis,
MO St. Charles Co. United States |
Breton Pkwy. / Welsh Dr. (38.76444, -90.79387) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2005-2007). |
Lake St Louis,
MO St. Charles Co. United States |
Ridgeway Dr. / Breton Pkwy. (38.76456, -90.79000) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2005 | |
St Louis,
MO St. Louis City United States |
SR 115 (Natural Bridge Ave.) / Goodfellow Blvd. (38.68607, -90.27131) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2021 | Add-lane right-turn bypass lane on southeast leg; yield-controlled right-turn bypass lane on northeast leg. |
St Louis,
MO St. Louis City United States |
SR 115 (Natural Bridge Ave.) / Vandeventer Ave. (38.66375, -90.22271) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | https://nextstl.com/2022/03/crashes-down-on-natural-bridge-but-more-work-still-to-be-done/ |
St Louis,
MO St. Louis City United States |
SR 115 (Natural Bridge Ave. / Salisbury St.) / Natural Bridge Ave. / Parnell St. (38.65785, -90.20947) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2020 | Elliptical shaped. ICD = 135 ft x 110 ft. https://nextstl.com/2022/03/crashes-down-on-natural-bridge-but-more-work-still-to-be-done/ |
Gordonville,
MO Cape Girardeau Co. United States |
SR 25 / CR K (37.31757, -89.66588) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.msn.com/en-us/autos/news/rte-25k-roundabout-at-gordonville-finished-early/ar-AA1rkPGt |
Joplin,
MO Jasper Co. United States |
E Zora St. / Hall St. / Duquesne Rd. (37.11261, -94.45761) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/JoplinNewsFirst/videos/koamtrafficalert-roundabout-opens-at-zoraduquesnehall-to-all-traffic/1644473069823426/ |
Hanover,
MN Wright Co. United States |
CSAH 19 (Labeaux Ave. NE) / CSAH 34 (Beebe Lake Rd. NE) (45.16175, -93.66604) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | |
Richfield,
MN Hennepin Co. United States |
Lyndale Ave. S / 65th St. (44.88522, -93.28611) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Elliptical shaped. ICD = 125 ft x 115 ft. https://www.facebook.com/story.php/?story_fbid=641870717972314&id=100064481752700 |
Buffalo,
MN Wright Co. United States |
STH 25 / CSAH 83 (35th St. NE) (45.20141, -93.86692) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Single-Lane |
2024 | |
Apple Valley,
MN Dakota Co. United States |
Diamond Path W / 140th St. W / Connemara Trl. (44.74637, -93.15649) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | On the border between Apple Valley and Rosemount. https://nextdoor.com/agency-post/mn/rosemount/city-of-rosemount/the-intersection-at-diamond-path-and-connemara-trail-is-now-closed-to-through-traffic-for-construction-of-a-roundabout-282288126/ |
Merrifield,
MN Crow Wing Co. United States |
CSAH 3 / CSAH 4 (46.48182, -94.17288) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.instagram.com/crowwingcountymn/p/C8sK5DXvURa/ |
Northfield,
MN Rice Co. United States |
Lonsdale Blvd. W (SR 19 / CR 46) / I-35 NB Ramps / Anoka Ave. / Hazelwood Ave. (44.47181, -93.29085) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Combines a 4-way intersection with a freeway interchange ramp terminal intersection. https://www.ricecountymn.gov/CivicAlerts.aspx?AID=969 |
Baxter,
MN Crow Wing Co. United States |
Highland Scenic Rd. (CSAH 48) / Cypress Dr. (46.33797, -94.23156) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | |
West St Paul,
MN Dakota Co. United States |
Thompson Ave. E (CR 6) / Oakdale Ave. (CR 73) (44.90155, -93.07054) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 130 ft x 100 ft. https://www.co.dakota.mn.us/Transportation/CurrentConstruction/ThompsonOakdale. |
Thief River Falls,
MN Pennington Co. United States |
US 59 / Center St. E (CR 3) (48.01959, -96.05493) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
Edina,
MN Hennepin Co. United States |
Interlachen Blvd./ Blake Rd. (44.91393, -93.38343) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | Year Completed estimated (2023-2024). https://www.youtube.com/watch?v=dm2G51ZohRY |
Buffalo,
MN Wright Co. United States |
35th St. NE / Braddock Ave. (45.20177, -93.87000) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Intersection moved 250-300 feet to the west. |
Glencoe,
MN McLeod Co. United States |
16th St. E / 110th St. / Falcon Ave. / Morningside Dr. (44.77578, -94.13155) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2020-2022). |
Ramsey,
MN Anoka Co. United States |
Armstrong Blvd. NW / Alpine Dr. NW (45.24865, -93.47053) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2023 | Elliptical shaped. ICD = 140 ft x 125 ft. https://stories.opengov.com/anokacountymn/published/3CanECRn-XG |
Anoka,
MN Anoka Co. United States |
Thurston Ave. / US 10-US 169 Ramps (45.21253, -93.41300) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Peanut shaped. Node ICDs 140 ft; length 290 ft. Year Completed estimated (2023-2024). |
Maple Grove,
MN Hennepin Co. United States |
101st Ave. N / Lawndale Ln. (45.13832, -93.50388) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Maple Grove,
MN Hennepin Co. United States |
101st Ave. N / Troy Ln. N (45.13846, -93.51193) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Arden Hills,
MN Ramsey Co. United States |
Snelling Ave. N / Lake Johanna Blvd. / CR E (45.05023, -93.16374) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | |
St Louis Park,
MN Hennepin Co. United States |
36th St. W / Belt Line Blvd. / Monterey Dr. (44.93795, -93.34154) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Right-turn-only lane on north leg. Left-turn-only lane on west leg. |
Richfield,
MN Hennepin Co. United States |
Lyndale Ave. S / W 70th St. (44.87632, -93.28918) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2019 | https://www.hometownsource.com/sun_current/community/richfield/lyndale-avenue-road-construction-continues-in-richfield/article_4df9bdb4-817f-11e9-9352-733310e3eaf2.html |
Owatonna,
MN Steele Co. United States |
24th Ave. SW / W Bridge St. (44.08433, -93.25657) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2021 | |
Grand Rapids,
MN Itasca Co. United States |
Fairgrounds Rd. / Crystal Lake Blvd. / Ridgewood Rd. / 14th St. N (47.24598, -93.52334) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2013-2019). |
Goodhue,
MN Goodhue Co. United States |
STH 58 / CR 9 (44.39796, -92.62018) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.q-mediagroup.com/post/goodhue-roundabout-open-and-bridge-work-starts |
Edina,
MN Hennepin Co. United States |
Eden Ave. / Wilson Rd. / Dale Dr. (44.91042, -93.34835) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2023 | Series of 2 roundabouts. Roundabout located 75 feet from roundabout to the west. |
Edina,
MN Hennepin Co. United States |
Eden Ave. / Grange Rd. (44.91059, -93.34897) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2023 | Series of 2 roundabouts. Roundabout located 75 feet from roundabout to the east. |
New Ulm,
MN Brown Co. United States |
US 14 / N Highland Ave. (44.32624, -94.49732) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.nujournal.com/news/local-news/2024/08/10/roundabout-opens-to-traffic/ |
St Michael,
MN Wright Co. United States |
CSAH 35 (30th St. NE) / Jamison Ave. NE (45.19541, -93.69572) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.co.wright.mn.us/CivicAlerts.aspx?AID=4301 |
St Michael,
MN Wright Co. United States |
CSAH 35 (Kahl Ave. / 30th St. NE) / Jansen Ave. / 30th St. NE (45.19612, -93.68491) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.co.wright.mn.us/CivicAlerts.aspx?AID=4301 |
St Michael,
MN Wright Co. United States |
CSAH 35 (Kahl Ave. NE) / 34th St. NE / 35th St. NE (45.20235, -93.68130) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.co.wright.mn.us/CivicAlerts.aspx?AID=4301 |
Hugo,
MN Washington Co. United States |
US 61 (Forest Blvd. N) / 159th St. N (45.17901, -92.98769) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
Blaine,
MN Anoka Co. United States |
117th Ave. NE / Ulysses St. NE (45.18304, -93.24007) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.blainemn.gov/3995/23-09-Ulysses-Street-117th-Avenue-Rounda |
New Ulm,
MN Nicollet Co. United States |
CSAH 37 / US 14 WB Ramps (44.30186, -94.42165) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
New Ulm,
MN Nicollet Co. United States |
CSAH 37 / US 14 EB Ramps (44.30098, -94.42365) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Raindrop shaped. Year Completed estimated (2021-2024). |
Oak Park Heights,
MN Washington Co. United States |
Norell Ave. N / 59th St. N (45.03462, -92.83299) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2022 | Right-turn-only lane on north leg. |
Oakdale,
MN Washington Co. United States |
40th St. N / Helmo Ave. N (45.00596, -92.95083) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
Mankato,
MN Blue Earth Co. United States |
STH 22 / Augusta Dr. (44.18859, -93.94948) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://www.keyc.com/video/2024/10/04/roundabout-highway-22-augusta-drive-mankato-opens-october-5/ |
Lakeville,
MN Dakota Co. United States |
185th St. W / Highview Ave. (44.68129, -93.23745) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2023 | https://www.facebook.com/sehinc/videos/-view-from-a-drone-185th-street-roadway-extension-in-lakeville-minnesota-roadway/928613455591395/ |
Alexandria,
MN Douglas Co. United States |
CR 82 (Viking Trl.) / CR 45 SW / Karl Dr. (45.89291, -95.40409) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.echopress.com/news/roundabout-at-intersection-of-county-road-45-and-82-on-pace-to-open-by-fair-time |
Alexandria,
MN Douglas Co. United States |
STH 27 / I-94 EB Ramps (45.86026, -95.43178) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.dot.state.mn.us/d4/projects/i94interchange/index.html |