City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Howard,
WI Brown Co. United States |
Lineville Rd. (CTH M) / Belmont Rd. (44.59075, -88.09447) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 25.5159 |
Other (At-Grade) Single-Lane |
2006 | Completed summer 2006. Previously controlled by two-way stop ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Belmont Rd. / Belle Plane Rd. (44.58361, -88.09459) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.9671 |
Other (At-Grade) Single-Lane |
2000 | Roundabout was constructed in center of residential subdivision south of Lineville Road. Roundabout is slightly smaller than the Lineville roundabouts. Completed August 2000. http://www.co.brown.wi.us/Planning/roundabouts.html Functional Class: Local ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / S 9th St. / W Matthew Dr. (44.43063, -88.09529) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.8205 |
Other (At-Grade) Single-Lane |
2004 | Second of two roundabouts on an arterial street separating residential neighborhood from a business park. Many trucks pass through this intersection each day. Completed November 2004. http://www.co.brown.wi.us/Planning/roundabouts.html. Series of 6 roundabouts. Opened November 2004. Functional Class: Arterial ICD estimated from Google Maps linework. |
Greenleaf,
WI Brown Co. United States |
STH 32-STH 57 (Greenleaf Rd.) / STH 96 (Day St.) (44.31343, -88.09599) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.3285 |
Other (At-Grade) Single-Lane |
2007 | Opened August 31, 2007. ICD estimated from Google Maps linework. |
Muskego,
WI Waukesha Co. United States |
Woods Rd. / Moorland Rd. / Durham Dr. (42.91086, -88.09789) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2021). |
Howard,
WI Brown Co. United States |
Glendale Ave. / Hillcrest Heights (44.56551, -88.09801) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9305 |
Other (At-Grade) Single-Lane |
2008 | Opened August 1, 2008. ICD estimated from Google Maps linework. |
Menominee Falls,
WI Waukesha Co. United States |
Megal Ct. / (unknown) (43.18504, -88.10064) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Fourth leg stubbed. Year Completed estimated (2015-2016). |
Howard,
WI Brown Co. United States |
Riverdale Dr. (CTH J) / CTH RK (44.54785, -88.10120) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.4509 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / Lawrence Dr. (44.43083, -88.10675) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7605 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Series of 6 roundabouts. Opened November 2, 2010. ICD estimated from Google Maps linework. |
Bloomingdale,
IL DuPage Co. United States |
Bloomfield Pkwy. / Bloomfield Cir. (41.95403, -88.10742) |
Other Existing |
Uncontrolled None |
3 Approaches 5 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Pedestrian access to central island. | |
New Berlin,
WI Waukesha Co. United States |
Moorland Rd. (CTH O) / I-43 SB Ramps (42.95341, -88.10897) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.3087 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
New Berlin,
WI Waukesha Co. United States |
Moorland Rd. (CTH O) / I-43 NB Ramps / Rockridge Rd. (42.94913, -88.10900) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2068 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2007 | Opened September 2007. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 NB Ramps (44.43074, -88.10989) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2011 | Series of 6 roundabouts. Yield-controlled right-turn bypass lane on south leg; merging right-turn bypass lane on east leg. Opened September 2011. Circular central island. |
Howard,
WI Brown Co. United States |
Glendale Ave. / Pinecrest Rd. (44.56910, -88.11016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.0779 |
Other (At-Grade) Single-Lane |
2005 | Completed summer 2005. Skewed intersection. ICD estimated from Google Maps linework. |
Lake Villa,
IL Lake Co. United States |
Monaville Rd. / N Fairfield Rd. (42.40096, -88.11041) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | https://www.lakecountyil.gov/3686/Fairfield-Rd |
Kansasville,
WI Racine Co. United States |
STH 20 / STH 75 / CTH S (42.74191, -88.11098) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 37.7169 |
Other (At-Grade) Single-Lane |
2014 | Rural, high-speed approaches. ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / US 41 SB Ramps (44.43050, -88.11402) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2011 | Series of 6 roundabouts. Opened September 2011. |
Mobile,
AL Mobile Co. United States |
Satchel Paige Dr. / (unknown) (30.64978, -88.11679) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.9068 |
Other (At-Grade) Single-Lane |
2015 | Left-through and right-turn-only lanes on all entries. Year Completed estimated (2015-2016). ICD estimated from Google Maps linework. |
Mobile,
AL Mobile Co. United States |
Satchel Paige Dr. / Tingle Cir. (30.65133, -88.11761) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 31.8514 |
Other (At-Grade) Single-Lane |
2015 | Left-through and right-turn-only lanes on all entries. Year Completed estimated (2015-2016). ICD estimated from Google Maps linework. |
De Pere,
WI Brown Co. United States |
Scheuring Rd. (CTH F) / PDQ Dr. / Mid Valley Dr. (44.43032, -88.11939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 40.9379 |
Other (At-Grade) Single-Lane |
2010 | Series of 6 roundabouts. Opened November 22, 2010. ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
Glendale Ave. / Evergreen Ave. (44.57615, -88.11939) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 28.9252 |
Other (At-Grade) Single-Lane |
2008 | Opened November 2008. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / CTH G (Division Rd.) (43.32329, -88.12235) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.0990 |
Other (At-Grade) Single-Lane |
2012 | ICD estimated from Google Maps linework. |
Green Bay,
WI Brown Co. United States |
Airport Dr. (STH 172) / Airport Entrance (44.49569, -88.12467) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.1882 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened October 2011. ICD estimated from Google Maps linework. |
Hoffman Estates,
IL Cook Co. United States |
Center Dr. / (parking) (42.07088, -88.12878) |
Rotary Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
This is a privately maintained roadway. The site is currently being redeveloped from an office campus to a mixed-use development. A single-lane modern roundabout has been considered as a replacement for the existing rotary. | |
Howard,
WI Brown Co. United States |
CTH C (Shawano Ave.) / CTH FF (Sherwood St.) (44.56660, -88.12972) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7370 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2011-2015). ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
CTH FF(Hillcrest Rd.) / Centennial Centre Blvd. / Navajo Trl. (44.55505, -88.13014) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5952 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2012-2015). ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
CTH FF (Hillcrest Rd.) / STH 29 EB Ramps (44.55969, -88.13035) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.4432 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Howard,
WI Brown Co. United States |
CTH FF (Sherwood St.) / STH 29 WB Ramps (44.56134, -88.13042) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.7403 |
Freeway Ramps (Grade-Separated) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Lawrence,
WI Brown Co. United States |
Lost Dauphin Rd. (CTH D) / Hickory Rd. (44.37573, -88.13582) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2017 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.37572660404294%2C-88.13766541271974&z=17. |
Mobile,
AL Mobile Co. United States |
N McGregor Ave. / Museum Dr. (30.70235, -88.14456) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.7807 |
Other (At-Grade) Single-Lane |
2015 | https://www.al.com/news/mobile/2015/08/portion_of_mcgregor_ave_rounda.html . ICD estimated from Google Maps linework. |
Brookfield,
WI Waukesha Co. United States |
North Ave. (CTH M) / Brookfield Rd. (43.06123, -88.14588) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 17.4521 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Bolingbrook,
IL Will Co. United States |
Rodeo Dr. / Kings Rd. (41.66750, -88.14597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2019 | Right-turn-only lanes on east and west legs; designed for future expansion to two through lanes. |
Green Bay,
WI Brown Co. United States |
Airport Dr. (STH 172) / S. Pine Tree Rd. (44.49955, -88.14986) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.2968 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
Stonewall Dr. / Living Word Ln. / Eagle Dr. (43.32521, -88.14996) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 21.7210 |
Other (At-Grade) Single-Lane |
2008 | Functional Class: Local ICD estimated from Google Maps linework. |
Forest Junction,
WI Calumet Co. United States |
US 10 / STH 32 (44.21245, -88.15433) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 37.6660 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Germantown,
WI Washington Co. United States |
STH 175 (Appleton Ave.) / CTH Y (Lannon Rd.) (43.20619, -88.15727) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.8216 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2017 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
Centennial Centre Blvd. / Centerline Dr. / Adriana Ct. (44.56730, -88.15748) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.6753 |
Other (At-Grade) Single-Lane |
2010 | ICD estimated from Google Maps linework. |
New Berlin,
WI Waukesha Co. United States |
CTH Y (Racine Ave.) / I-43 NB Ramps (42.93221, -88.15884) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.9731 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened November 2009. ICD estimated from Google Maps linework. |
New Berlin,
WI Waukesha Co. United States |
CTH Y (Racine Ave.) / I-43 SB Ramps (42.93426, -88.15884) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 47.2182 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Opened November 2009. ICD estimated from Google Maps linework. |
Norway,
WI Racine Co. United States |
Racine Ave. / Oakridge Dr. / S Loomis Rd. (42.82942, -88.15896) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.5395 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Muskego,
WI Waukesha Co. United States |
CTH Y (Racine Ave.) / Kelsey Dr. (42.85757, -88.15911) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.6425 |
Other (At-Grade) Single-Lane |
2009 | Opened November 9, 2009. ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
STH 96 (High St.) / Turner St. (44.32438, -88.16021) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.5944 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
West Bend,
WI Washington Co. United States |
Paradise Dr. / CTH G (43.39770, -88.16100) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.5053 |
Other (At-Grade) Single-Lane |
2003 | Completed September 18, 2003 Previously controlled by two-way stop Functional Class: Arterial ICD estimated from Google Maps linework. |
West Bend,
WI Washington Co. United States |
CTH NN / CTH G / Jackson Dr. / S Silver Rd. (43.36865, -88.16113) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 21.7054 |
Other (At-Grade) Single-Lane |
2015 | ICD estimated from Google Maps linework. |
Brookfield,
WI Waukesha Co. United States |
Barker Rd. (CTH Y) / North Ave. (CTH M) (43.06136, -88.16629) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 34.9042 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2010 | Functional Class: Arterial ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
Broadway St. / Main St. (44.32745, -88.16800) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
4 Approaches 0 Driveways 51.2624 |
Other (At-Grade) Single-Lane |
2015 | At-grade rail crossing on north leg. ICD estimated from Google Maps linework. |
Lake Barrington,
IL Lake Co. United States |
Roberts Rd. / River Rd. (42.23849, -88.16919) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 31.8321 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2015 | ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
N Overland Rd. / Centennial Centre Blvd. (44.56766, -88.16971) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.3942 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2014 | Year Completed estimated (2011-2015). Fourth leg added 2018. ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
N Overland Rd. / Oneida Way / Centerline Dr. (44.57140, -88.16988) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2022 | |
Howard,
WI Brown Co. United States |
Evergreen Rd. / Marley St. (44.58025, -88.17017) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | West leg stubbed. |
Saint Cloud,
WI Fond Du Lac Co. United States |
CR G / STH 23 WB Ramps (43.77241, -88.17078) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Raindrop shaped. |
Saint Cloud,
WI Fond Du Lac Co. United States |
CR G / STH 23 EB Ramps (43.77066, -88.17090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | Raindrop shaped. |
Howard,
WI Brown Co. United States |
CR VV (Marley St.) / STH 29 WB Ramps (44.57753, -88.17131) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Hobart,
WI Brown Co. United States |
CR VV (Marley St.) / STH 29 EB Ramps (44.57594, -88.17273) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Hobart,
WI Brown Co. United States |
Marley St. / Triangle Dr. / Oneida Way (44.57460, -88.17586) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | North leg stubbed. https://wisconsindot.gov/Pages/projects/by-region/ne/wis29study/schedule.aspx |
Green Bay,
WI Brown Co. United States |
W Mason St. (STH 54) / STH 172 (Airport Dr.) (44.50001, -88.17641) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2011 | Opened November 2011. |
Island Lake,
IL Lake Co. United States |
N Darrell Rd. / Neville Rd. / W Case Rd. (42.29948, -88.17938) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Oval shaped. Year Completed estimated (2021-2023). |
West Bend,
WI Washington Co. United States |
Veterans Ave. / Water St. / S Island Ave. (43.42306, -88.18069) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 32.0952 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
West Bend,
WI Washington Co. United States |
CR-P / CR-NN E (43.36879, -88.18095) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 38.2015 |
Other (At-Grade) Single-Lane |
2014 | ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
CTH P (Old US 45) / CTH PV (Pleasant Valley Rd.) (43.35352, -88.18166) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.0005 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
West Bend,
WI Washington Co. United States |
Poplar St. / 6th Ave. (43.42078, -88.18365) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-Lane |
1999 | No splitter islands. |
Belize City,
Belize Belize |
Marine Parade Blvd. / Craig St. (17.50031, -88.18373) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 28.4762 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Lannon,
WI Waukesha Co. United States |
CTH V (Town Line Rd.) / W Good Hope Rd. (43.14820, -88.18388) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.0124 |
Other (At-Grade) Single-Lane |
2011 | ICD estimated from Google Maps linework. |
Lannon,
WI Waukesha Co. United States |
STH 74 (Main St.) / CTH V (Townline Dr.) / McLaughlin Rd. (43.13902, -88.18408) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.3459 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2008 | Opened November 15, 2008. ICD estimated from Google Maps linework. |
Mobile,
AL Mobile Co. United States |
USA Circle Dr. (30.69583, -88.18431) |
Rotary Existing |
Unknown Unknown |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Unknown |
University of Southern Alabama campus. | |
Belize City,
Belize Belize |
Craig St. / Eve St. (17.49973, -88.18465) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 22.7811 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Richfield,
WI Washington Co. United States |
STH 145 / US 45 NB Ramps (43.28380, -88.18485) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 30.4301 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 NB Ramps (43.32441, -88.18568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 19.1147 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 45 SB Ramps (43.28387, -88.18716) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.5606 |
Freeway Ramps (Grade-Separated) Single-Lane |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / US 45 SB Ramps (43.32437, -88.18747) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.5901 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Burlington,
WI Racine Co. United States |
STH 11 (Durand Ave). / CR J (English Settlement Ave.) (42.68366, -88.18849) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://projects.511wi.gov/11roundabout/full-project-overview/ |
Richfield,
WI Washington Co. United States |
STH 145 / Cabela Way (43.28377, -88.18944) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.9939 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. Functional Class: Arterial ICD estimated from Google Maps linework. |
Jackson,
WI Washington Co. United States |
STH 60 / Tillie Rd. / Cedar Pkwy (43.32438, -88.19016) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.1475 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Opened November 2012. Functional Class: Arterial ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
Holy Hill Rd. / Appleton Ave. (43.25080, -88.19111) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4466 |
Other (At-Grade) Single-Lane |
2016 | Year Completed estimated (2015-2017). ICD estimated from Google Maps linework. |
Wrightstown,
WI Brown Co. United States |
County Line Rd. / Golf Course Rd. / Broadway St. / Lock Rd. (44.32815, -88.19128) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.4268 |
Other (At-Grade) Single-Lane |
2015 | https://www.google.com/maps/d/viewer?mid=1kRgB04jjoXd6tLLe0r20FJoxJMI&ll=44.327271862015316%2C-88.1974894025879&z=14 ICD estimated from Google Maps linework. |
Richfield,
WI Washington Co. United States |
STH 145 / US 41 NB Ramps (43.28247, -88.19345) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 34.7780 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Hobart,
WI Brown Co. United States |
STH 54 (W Mason St.) / CTH J (Seminary Rd.) (44.50105, -88.19372) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.7030 |
Other (At-Grade) Single-Lane |
2011 | Opened November 2011. ICD estimated from Google Maps linework. |
Belize City,
Belize Belize |
Freetown Rd. / Saint Thomas St. (17.50430, -88.19507) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 28.4756 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Richfield,
WI Washington Co. United States |
STH 145 / US 41 SB Ramps (43.28170, -88.19557) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 37.3868 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2009 | Series of 5 roundabouts. Corridor serves two interchanges and Cabelas commercial development. ICD estimated from Google Maps linework. |
Belize City,
Belize Belize |
Central American Blvd. / Northern Hwy. / Princess Margaret Dr. / Freetown Rd. (17.50425, -88.19637) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 63.7854 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Belize City,
Belize Belize |
Central American Blvd. / Mahogany St. (17.50022, -88.19887) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 33.0325 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Belize City,
Belize Belize |
Century Rd. / Central American Blvd. (17.49568, -88.19901) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.8677 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
ICD estimated from Google Maps linework. | |
Urbana,
IL Champaign Co. United States |
E Stebbins Dr. / N Division Ave. (40.11989, -88.20528) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 28.3123 |
Other (At-Grade) Single-Lane |
2009 | ICD estimated from Google Maps linework. |
McHenry,
IL McHenry Co. United States |
S River Rd. / Dowell Rd. (42.29240, -88.21199) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 35.3388 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | ICD estimated from Google Maps linework. |
Channahon,
IL Will Co. United States |
S Navajo Dr. / St Ann Way (41.43729, -88.22099) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Pulaski,
WI Brown Co. United States |
STH 32 (S Wisconsin St.) / CTH B (Crest Dr.) (44.65709, -88.22159) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.4779 |
Other (At-Grade) Single-Lane |
2011 | Opened September 6, 2011. ICD estimated from Google Maps linework. |
Belize City,
Belize Belize |
Western Hwy. / Fabers Rd. / Chetumal St. (17.49991, -88.22232) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 17.0858 |
Other (At-Grade) Single-Lane |
ICD estimated from Google Maps linework. | |
Naperville,
IL Will Co. United States |
Honey Locust Dr. / 103rd St. (41.69412, -88.22994) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Pittsfield,
WI Brown Co. United States |
Crest Dr. / Pelican Dr. (44.65696, -88.23054) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2019 | |
Hoffman Estates,
IL Cook Co. United States |
Essex Dr. / Beacon Pointe Dr. (42.06310, -88.23064) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 29.2604 |
Other (At-Grade) Single-Lane |
2007 | Roundabout pictures available at Village Website http://www.hoffmanestates.org/government/departments-comdev-transportation.shtml#InterestandInfo Functional Class: Collector ICD estimated from Google Maps linework. |
Plainfield,
IL Will Co. United States |
Island Dr. / Creekview Dr. / S Indian Boundary Line Rd. (41.59740, -88.23185) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
Irvington,
AL Mobile Co. United States |
Hwy 24 (Half Mile Rd.) / Hwy 19 (Irvington-Bayou La Batre Hwy.) (30.49445, -88.23393) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.2816 |
Other (At-Grade) Single-Lane |
2016 | ICD estimated from Google Maps linework. |
Plainfield,
IL Will Co. United States |
W Renwick Rd. / S Drauden Rd. (41.59347, -88.23543) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
Polk,
WI Washington Co. United States |
STH 60 / CTH C (Hillsdale Rd.) (43.32433, -88.24101) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 43.4426 |
Other (At-Grade) Multilane (3+ Lane) |
2012 | Opened November 2012. ICD estimated from Google Maps linework. |
Slinger, Village of,
WI Washington Co. United States |
CTH C (Hillsdale Rd.) / American Eagle Dr. (43.32600, -88.24102) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.2284 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2012 | Add-lane right-turn bypass lane on west leg. ICD estimated from Google Maps linework. |
Colgate,
WI Waukesha Co. United States |
CTH Q / Hillside Rd. (43.19319, -88.24181) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 42.6717 |
Other (At-Grade) Single-Lane |
2023 | |
Johnsburg,
IL McHenry Co. United States |
Johnsburg Rd. / St Johns Ave. / N Chapel Hill Rd. (42.38032, -88.24188) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5249 |
Other (At-Grade) Single-Lane |
2014 | Elliptical shape. Year Completed estimated (2013-2015). ICD estimated from Google Maps linework. |
Mobile,
AL Mobile Co. United States |
Dawes Rd. / Grelot Rd. / Air Terminal Dr. (30.66119, -88.24205) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 64.7236 |
Other (At-Grade) Single-Lane |
2010 | One leg has bypass lane. Functional Class: Minor Arterial ICD estimated from Google Maps linework. |
Irvington,
AL Mobile Co. United States |
SR 188 / Irvington Bayou La Batre Hwy. (30.42821, -88.24595) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.wlox.com/video/2024/01/24/bayou-la-batre-roundabout-open-today/ |
Warwick,
AL Mobile Co. United States |
Jeff Hamilton Rd. / Dawes Rd. (30.65204, -88.24647) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Opened October 29, 2021. https://www.wkrg.com/mobile-county/roundabout-at-dawes-and-jeff-hamilton-roads-reopens/ |