| 
                City, 
                State County Country  | 
            
                Intersection (Lat, Lng)  | 
            
                Type Status  | 
            Control Type / Other Control Type | Approaches / Driveways / ICD (m) | 
                Functional Class /  LaneType  | 
            Year Completed | Comments | 
|---|---|---|---|---|---|---|---|
| 
                Cottage Grove,
                MN Washington Co. United States  | 
            
                Jamaica Ave. / US 10-US 61 WB Ramps (44.81586, -92.93379)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 37.2780  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2007 | ICD estimated from Google Maps linework. | 
| 
                Prescott,
                AZ Yavapai Co. United States  | 
            
                Grande Dame Pkwy. / SR 89A EB Ramps (34.63499, -112.39830)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 52.0821  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2011 | ICD estimated from Google Maps linework. | 
| 
                Prescott,
                AZ Yavapai Co. United States  | 
            
                Grande Dame Pkwy. / SR 89A WB Ramps (34.63643, -112.39710)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 51.0985  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2011 | ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                GA Clarke Co. United States  | 
            
                Trinity Pond Rd. / Gray Fox Cir. (33.95083, -83.28500)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 28.7308  | 
            
                Other (At-Grade) Single-Lane  |   
            2004 | Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                GA Cherokee Co. United States  | 
            
                River Ridge High School access / parking access (34.11611, -84.47916)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 140.4079  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2009 | Access to high school. ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                GA Chatham Co. United States  | 
            
                (unknown) / (unknown) (32.21583, -81.19500)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 75.7843  | 
            
                Other (At-Grade) Single-Lane  |   
            2006 | Water fountain in center. ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                GA Chatham Co. United States  | 
            
                Rice Mill Rd. / (unknown) (32.21944, -81.19250)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 74.7708  | 
            
                Other (At-Grade) Single-Lane  |   
            2009 | ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                GA Chatham Co. United States  | 
            
                Rice Mill Rd. / Old Mill Rd. (32.22194, -81.19750)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 40.4156  | 
            
                Other (At-Grade) Single-Lane  |   
            2008 | ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                GA Chatham Co. United States  | 
            
                Highlands Blvd. / Orkney Rd. (32.17750, -81.26083)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 75.8162  | 
            
                Other (At-Grade) Single-Lane  |   
            2007 | ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                GA Camden Co. United States  | 
            
                (unknown) / (unknown) (31.10067, -81.59306)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 39.8836  | 
            
                Other (At-Grade) Single-Lane  |   
            2008 | ICD estimated from Google Maps linework. | 
| 
                Alpharetta,
                GA Fulton Co. United States  | 
            
                Rainwater Dr. / (unknown) (34.06288, -84.28911)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 22.7564  | 
            
                Other (At-Grade) Single-Lane  |   
            1999 | Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                GA Forsyth Co. United States  | 
            
                Blossom Creek Ln. / Overlook Springs Ln. (34.23000, -84.17389)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 36.5358  | 
            
                Other (At-Grade) Single-Lane  |   
            2005 | Painted splitter islands. Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Atlanta,
                GA DeKalb Co. United States  | 
            
                McClendon Ave. NE / Howard Cir. NE (33.76445, -84.32222)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 16.8790  | 
            
                Other (At-Grade) Single-Lane  |   
            2004 | No deflection on entries. ICD estimated from Google Maps linework. | 
| 
                Stone Mountain Park,
                GA DeKalb Co. United States  | 
            
                Robert E Lee Blvd. / Covered Bridge Ln. (33.80518, -84.13525)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 23.8178  | 
            
                Other (At-Grade) Single-Lane  |   
            2003 | Inside Stone Mountain Park. Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Douglasville,
                GA Douglas Co. United States  | 
            
                Reservoir Dr. / Reservoir Dr. (33.72722, -84.74167)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 38.7392  | 
            
                Other (At-Grade) Single-Lane  |   
            2006 | Two right-turn bypass lanes with add lanes. Entrance to Arbor Place Mall commercial development. Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                GA Douglas Co. United States  | 
            
                Double Birch / Knotty Ridge Dr. (33.65278, -84.76861)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 34.7960  | 
            
                Other (At-Grade) Single-Lane  |   
            2001 | Painted splitter islands. Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Newnan,
                GA Coweta Co. United States  | 
            
                Stonebridge Blvd. / Stonebridge Crossing (33.38194, -84.74277)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 1 Driveways 43.8808  | 
            
                Other (At-Grade) Single-Lane  |   
            2004 | Painted splitter islands. Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Newnan,
                GA Coweta Co. United States  | 
            
                Stonebridge Blvd. / Stonebridge Way (33.38611, -84.74194)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 47.8676  | 
            
                Other (At-Grade) Single-Lane  |   
            2004 | Painted splitter islands. Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Newnan,
                GA Coweta Co. United States  | 
            
                Summerlin Blvd. / Harrison Dr. / Macalester Dr. (33.37722, -84.74667)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 59.8406  | 
            
                Other (At-Grade) Single-Lane  |   
            2005 | Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Evans,
                GA Columbia Co. United States  | 
            
                Ronald Reagan Dr. / (unknown) (33.54462, -82.12749)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 24.8855  | 
            
                Other (At-Grade) Single-Lane  |   
            2012 | Oval shape. Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Waupaca,
                WI Waupaca Co. United States  | 
            
                STH 22 / STH 54 (Royalton St.) (44.35154, -89.03481)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 36.7229  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2008 | Right turn bypass lane. Opened September 2008. ICD estimated from Google Maps linework. | 
| 
                Jacksonville,
                FL Duval Co. United States  | 
            
                Watermill Blvd. / Maidstone Mill Dr. / W Maidstone Mill Dr. (30.19300, -81.81720)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 45.4213  | 
            
                Other (At-Grade) Single-Lane  |   
            2004 | Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Coral Springs,
                FL Broward Co. United States  | 
            
                Blue Sage Way / Bay Leaf Ct. / Eden Manor (26.33207, -80.25658)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 58.8722  | 
            
                Other (At-Grade) Single-Lane  |   
            2005 | Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Janesville,
                WI Rock Co. United States  | 
            
                N Harmony Town Hall Rd. / STH 26 NB Ramps (42.75114, -88.95416)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 39.6240  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2012 | Interchange replaced single at-grade two-way stop-controlled intersection. | 
| 
                Janesville,
                WI Rock Co. United States  | 
            
                N Harmony Town Hall Rd. / STH 26 SB Ramps (42.75331, -88.95426)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 39.6240  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2012 | Interchange replaced single at-grade two-way stop-controlled intersection. | 
| 
                Jackson,
                WI Washington Co. United States  | 
            
                STH 60 / US 45 NB Ramps (43.32441, -88.18568)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 19.1147  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2012 | Opened November 2012. ICD estimated from Google Maps linework. | 
| 
                Jackson,
                WI Washington Co. United States  | 
            
                STH 60 / US 45 SB Ramps (43.32437, -88.18747)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 22.5901  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2012 | Opened November 2012. ICD estimated from Google Maps linework. | 
| 
                Marshfield,
                WI Wood Co. United States  | 
            
                STH 13 / Heritage Dr. (44.62685, -90.18053)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 47.6000  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2012 | ICD estimated from Google Maps linework. | 
| 
                Oshkosh,
                WI Winnebago Co. United States  | 
            
                STH 21 (Omro Rd.) / US 41 SB Ramps (44.03272, -88.58319)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 60.1058  | 
            
                Freeway Ramps (Grade-Separated) Multilane (3+ Lane)  |   
            2012 | Opened August 30, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. | 
| 
                Oshkosh,
                WI Winnebago Co. United States  | 
            
                STH 21 (Omro Rd.) / US 41 NB Ramps (44.03271, -88.58178)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 140.8193  | 
            
                Freeway Ramps (Grade-Separated) Multilane (3+ Lane)  |   
            2012 | Opened October 29, 2012. Three-lane roundabout. Series of 4 roundabouts. ICD estimated from Google Maps linework. | 
| 
                Roberts,
                WI Saint Croix Co. United States  | 
            
                STH 65 / I-94 EB Ramps (44.95862, -92.55999)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 48.1723  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. | 
| 
                Roberts,
                WI Saint Croix Co. United States  | 
            
                STH 65 / I-94 WB Ramps (44.96036, -92.55952)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 50.7061  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2013 | Opened October 2013. Ramp terminal relocated closer to bridge when roundabout was constructed. ICD estimated from Google Maps linework. | 
| 
                Oregon,
                WI Dane Co. United States  | 
            
                STH 138 / US 14 WB Ramps (42.91764, -89.36607)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 47.2309  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2011 | ICD estimated from Google Maps linework. | 
| 
                Oregon,
                WI Dane Co. United States  | 
            
                STH 138 / US 14 EB Ramps (42.91774, -89.36817)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 41.1083  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2011 | ICD estimated from Google Maps linework. | 
| 
                Oregon,
                WI Dane Co. United States  | 
            
                CTH MM / US 14 EB Ramps (42.95128, -89.37859)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 29.7217  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. | 
| 
                Oregon,
                WI Dane Co. United States  | 
            
                CTH MM / US 14 WB Ramps (42.95272, -89.37769)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 41.9591  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. | 
| 
                Oregon,
                WI Dane Co. United States  | 
            
                CTH MM / CTH M (42.94950, -89.37981)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 41.9613  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2012 | Series of 3 roundabouts. ICD estimated from Google Maps linework. | 
| 
                Appleton,
                WI Calumet Co. United States  | 
            
                CTH AP (Plank Rd.) / Midway Rd. (44.23008, -88.37485)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 34.2316  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2011 | ICD estimated from Google Maps linework. | 
| 
                Platteville,
                WI Grant Co. United States  | 
            
                Chestnut St. / Markee Ave. (42.72607, -90.48517)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 38.6039  | 
            
                Other (At-Grade) Single-Lane  |   
            2010 | ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                WI Sauk Co. United States  | 
            
                CTH BD (Fern Dell Rd.) / Timothy Ln. (43.55597, -89.77811)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 1 Driveways 39.8145  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                WI Sauk Co. United States  | 
            
                CTH BD (Fern Dell Rd.) / US 12 EB Ramps (43.55774, -89.77940)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 40.6788  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                WI Sauk Co. United States  | 
            
                CTH BD (Fern Dell Rd.) / US 12 WB Ramps (43.55867, -89.78077)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 41.5437  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2010 | Series of 4 roundabouts. ICD estimated from Google Maps linework. | 
| 
                Beloit,
                WI Rock Co. United States  | 
            
                E Hart Rd. / CTH X / Gateway Blvd. (42.53840, -88.94769)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 38.7205  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2009 | Opened October 2009. Series of 3 roundabouts. ICD estimated from Google Maps linework. | 
| 
                Beloit,
                WI Rock Co. United States  | 
            
                E Hart Rd. / I-43 NB Ramps (42.53960, -88.94841)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 31.6798  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. | 
| 
                Beloit,
                WI Rock Co. United States  | 
            
                E Hart Rd. / I-43 SB Ramps (42.54142, -88.94933)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 36.0787  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2009 | Opened October 2009. Series of 3 roundabouts. Right turn bypass lane. ICD estimated from Google Maps linework. | 
| 
                Milton,
                WI Rock Co. United States  | 
            
                STH 59 / STH 26 NB Ramps (42.76902, -88.92310)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 39.6240  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2009 | Opened October 2009. | 
| 
                Milton,
                WI Rock Co. United States  | 
            
                STH 59 / STH 26 SB Ramps (42.76911, -88.92484)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 39.6240  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2009 | Opened October 2009. | 
| 
                Milton,
                WI Rock Co. United States  | 
            
                STH 59 / CTH M (42.76886, -88.91364)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 31.5632  | 
            
                Other (At-Grade) Single-Lane  |   
            2009 | Opened October 2009. ICD estimated from Google Maps linework. | 
| 
                Appleton,
                WI Calumet Co. United States  | 
            
                CTH LP (Lake Park Rd.) / S Kensington Dr. (44.23956, -88.36281)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 29.0922  | 
            
                Other (At-Grade) Single-Lane  |   
            2007 | Opened October 2007. ICD estimated from Google Maps linework. | 
| 
                Beloit,
                WI Rock Co. United States  | 
            
                Millington Rd. / Kerry America Corp. Entrance (42.52895, -88.97019)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 32.5653  | 
            
                Other (At-Grade) Single-Lane  |   
            2008 | Opened November 2008. ICD estimated from Google Maps linework. | 
| 
                Hudson,
                WI Saint Croix Co. United States  | 
            
                Hanley Rd. / STH 35 NB Ramps (44.94889, -92.69390)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 35.5014  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. | 
| 
                Hudson,
                WI Saint Croix Co. United States  | 
            
                Hanley Rd. / STH 35 SB Ramps (44.94890, -92.69675)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 38.0372  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2005 | Right-turn bypass lane. Opened October 21, 2005. ICD estimated from Google Maps linework. | 
| 
                Summit,
                WI Waukesha Co. United States  | 
            
                CTH P (N Sawyer Rd.) / I-94 EB Ramps (43.06063, -88.44229)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 34.9046  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. | 
| 
                Summit,
                WI Waukesha Co. United States  | 
            
                CTH P (N Sawyer Rd.) / I-94 WB Ramps (43.06174, -88.44228)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 47.1203  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2011 | Opened November 23, 2011. ICD estimated from Google Maps linework. | 
| 
                Summit,
                WI Waukesha Co. United States  | 
            
                CTH P (N Sawyer Rd.) / CTH DR (Delafield Rd.) (43.05922, -88.44241)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 1 Driveways 36.6506  | 
            
                Other (At-Grade) Single-Lane  |   
            2011 | Opened August 11, 2011. ICD estimated from Google Maps linework. | 
| 
                De Pere,
                WI Brown Co. United States  | 
            
                CTH G (Main Ave.) / US 41 NB Ramps (44.45238, -88.08887)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 60.9600  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2012 | |
| 
                De Pere,
                WI Brown Co. United States  | 
            
                CTH G (Main St.) / US 41 SB Ramps (44.45374, -88.09212)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 48.5943  | 
            
                Freeway Ramps (Grade-Separated) Multilane (3+ Lane)  |   
            2012 | ICD estimated from Google Maps linework. | 
| 
                Barksdale,
                WI Bayfield Co. United States  | 
            
                STH 13 / US 2 WB Ramps (46.58774, -90.95454)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 45.9645  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2012 | ICD estimated from Google Maps linework. | 
| 
                Neenah,
                WI Winnebago Co. United States  | 
            
                Breezewood Ln. / US 41 SB Ramps (44.15623, -88.48662)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 47.1274  | 
            
                Freeway Ramps (Grade-Separated) Multilane (3+ Lane)  |   
            2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. | 
| 
                Neenah,
                WI Winnebago Co. United States  | 
            
                Breezewood Ln. / US 41 NB Ramps (44.15602, -88.48505)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 45.4139  | 
            
                Freeway Ramps (Grade-Separated) Multilane (3+ Lane)  |   
            2012 | Opened October 12, 2012. ICD estimated from Google Maps linework. | 
| 
                Wisconsin Dells,
                WI Columbia Co. United States  | 
            
                Waubeek Rd. / River Rd. (43.63800, -89.76709)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 30.2523  | 
            
                Other (At-Grade) Single-Lane  |   
            2007 | Opened November 2007. ICD estimated from Google Maps linework. | 
| 
                Whitewater,
                WI Jefferson Co. United States  | 
            
                Burr Oak Trl. / N Acorn Ridge (42.85569, -88.74258)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 30.6434  | 
            
                Other (At-Grade) Single-Lane  |   
            2007 | Opened October 2007. Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Whitewater,
                WI Jefferson Co. United States  | 
            
                Burr Oak Trl. / (unknown) (42.85222, -88.74105)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 29.7695  | 
            
                Other (At-Grade) Single-Lane  |   
            2007 | Opened November 2007. Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Cottage Grove,
                WI Dane Co. United States  | 
            
                CTH N / I-94 WB Ramps (43.11037, -89.19930)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 36.6200  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. | 
| 
                Cottage Grove,
                WI Dane Co. United States  | 
            
                CTH N / I-94 EB Ramps (43.10877, -89.19923)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 38.3649  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2011 | Series of 3 roundabouts. ICD estimated from Google Maps linework. | 
| 
                Jackson,
                WI Washington Co. United States  | 
            
                Stonewall Dr. / Living Word Ln. / Eagle Dr. (43.32521, -88.14996)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 21.7210  | 
            
                Other (At-Grade) Single-Lane  |   
            2008 | Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                West Bend,
                WI Washington Co. United States  | 
            
                Veterans Ave. / Water St. / S Island Ave. (43.42306, -88.18069)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 1 Driveways 32.0952  | 
            
                Other (At-Grade) Single-Lane  |   
            2009 | ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                WI Sauk Co. United States  | 
            
                Reedsburg Rd. / US 12 WB Ramps (43.53249, -89.78612)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 41.5617  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2010 | ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                WI Sauk Co. United States  | 
            
                Reedsburg Rd. / US 12 EB Ramps (43.53258, -89.78800)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 46.7569  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2010 | ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                WI Sauk Co. United States  | 
            
                STH 33 / US 12 WB Ramps (43.51445, -89.78288)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 41.5741  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2010 | ICD estimated from Google Maps linework. | 
| 
                (unincorporated),
                WI Sauk Co. United States  | 
            
                STH 33 / US 12 EB Ramps (43.51449, -89.78516)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 40.7080  | 
            
                Freeway Ramps (Grade-Separated) Single-Lane  |   
            2010 | ICD estimated from Google Maps linework. | 
| 
                Madison,
                WI Dane Co. United States  | 
            
                Hanson Rd. / Eastpark Blvd. / Portage Rd. (43.15377, -89.30464)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 35.7228  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2008 | Opened October 14, 2008. ICD estimated from Google Maps linework. | 
| 
                Franklin,
                WI Milwaukee Co. United States  | 
            
                Drexel Ave. / Shoppes of Wyndham driveway (42.90494, -88.03474)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 25.3700  | 
            
                Other (At-Grade) Single-Lane  |   
            2008 | Opened July 2008. ICD estimated from Google Maps linework. | 
| 
                Rice Lake,
                WI Barron Co. United States  | 
            
                College Dr. / Technology Dr. (45.47778, -91.74466)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 31.8230  | 
            
                Other (At-Grade) Single-Lane  |   
            2005 | Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Chippewa Falls,
                WI Chippewa Co. United States  | 
            
                Parkland Dr. / Cottage Ln. (44.95369, -91.35110)  | 
            
                Traffic Calming Circle Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 22.8600  | 
            
                Other (At-Grade) Single-Lane  |   
            2006 | ICD estimated from Google Earth. | 
| 
                Chippewa Falls,
                WI Chippewa Co. United States  | 
            
                Parkland Dr. / Wissota Green Blvd. (44.95308, -91.35039)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 28.7371  | 
            
                Other (At-Grade) Single-Lane  |   
            2006 | Functional Class: Local ICD estimated from Google Maps linework. | 
| 
                Chippewa Falls,
                WI Chippewa Co. United States  | 
            
                STH 124 / BUS 29 (44.93498, -91.39065)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 35.5100  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2009 | Opened October 2009. ICD estimated from Google Maps linework. | 
| 
                Buffalo,
                NY Erie Co. United States  | 
            
                Aero Dr. / S. Youngs Rd. (42.94547, -78.72490)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 30.5988  | 
            
                Other (At-Grade) Single-Lane  |   
            2010 | Year completed estimated. ICD estimated from Google Maps linework. | 
| 
                Buffalo,
                NY Erie Co. United States  | 
            
                Aero Dr. / Holtz Dr. (42.94093, -78.71780)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 27.1038  | 
            
                Other (At-Grade) Single-Lane  |   
            2010 | ICD estimated from Google Maps linework. | 
| 
                Brunswick,
                MD Frederick Co. United States  | 
            
                MD 17 / Volunteer Drive (39.33261, -77.63365)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 36.9516  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2010 | ICD estimated from Google Maps linework. | 
| 
                Indianapolis,
                IN Marion Co. United States  | 
            
                Crawfordsville Rd. / W Main St. (39.78814, -86.24068)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 79.2480  | 
            
                Other (At-Grade) Multilane (2 Lane, 2x1 max)  |   
            2015 | Right-turn-only lane on south leg. | 
| 
                Juneau,
                AK Juneau United States  | 
            
                Glacier Hwy. / Mendenhall Loop Rd. (Back Loop) (58.38637, -134.64432)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 40.0674  | 
            
                Other (At-Grade) Single-Lane  |   
            2015 | ICD estimated from Google Maps linework. | 
| 
                Carmel,
                IN Hamilton Co. United States  | 
            
                Old Meridian St. / US 31 SB Ramps (39.98504, -86.14209)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 45.7200  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2014 | |
| 
                Carmel,
                IN Hamilton Co. United States  | 
            
                Old Meridian St. / US 31 NB Ramps (39.98429, -86.14154)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 44.1960  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified)  |   
            2015 | |
| 
                Carmel,
                IN Hamilton Co. United States  | 
            
                Old Meridian St. / W Smokey Row Rd. (39.98359, -86.14087)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 42.6720  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2014 | ICD estimated from Google Maps linework. | 
| 
                Carmel,
                IN Hamilton Co. United States  | 
            
                W Main St. / US 31 NB Ramps (39.97797, -86.15668)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 50.2920  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max)  |   
            2015 | Raindrop shaped. | 
| 
                Carmel,
                IN Hamilton Co. United States  | 
            
                W Main St. / US 31 SB Ramps (39.97787, -86.15802)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 50.2920  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max)  |   
            2015 | Raindrop shaped. | 
| 
                Apex,
                NC Wake Co. United States  | 
            
                Homeplace Dr. / Blue Thorn Dr. (35.66598, -78.75475)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 35.9014  | 
            
                Other (At-Grade) Single-Lane  |   
            2007 | ICD estimated from Google Maps linework. | 
| 
                Cary,
                NC Wake Co. United States  | 
            
                Carpenter Upchurch Rd. / Green Hope High School entrance (35.80318, -78.86969)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 46.4946  | 
            
                Other (At-Grade) Single-Lane  |   
            2014 | Only one circulating lane is provided. South leg has two lanes (TH and RT); east leg has two lanes (LT and RT). ICD estimated from Google Maps linework. | 
| 
                Morrisville,
                NC Wake Co. United States  | 
            
                Shiloh Glenn Dr. / Lower Shiloh Way (35.86587, -78.84024)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 31.9398  | 
            
                Other (At-Grade) Single-Lane  |   
            2009 | ICD estimated from Google Maps linework. | 
| 
                Durham,
                NC Durham Co. United States  | 
            
                Danziger Dr. / Witherspoon Blvd. (35.94866, -78.98963)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 1 Driveways 30.9395  | 
            
                Other (At-Grade) Single-Lane  |   
            2004 | ICD estimated from Google Maps linework. | 
| 
                Shallotte,
                NC Brunswick Co. United States  | 
            
                Bricklanding Rd. / Hale Swamp Rd. (33.94207, -78.41089)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 53.5042  | 
            
                Other (At-Grade) Single-Lane  |   
            2015 | Right-turn bypass lane in SE quadrant. ICD estimated from Google Maps linework. | 
| 
                Castle Hayne,
                NC New Hanover Co. United States  | 
            
                US 117 / NC 133-NC 132 (34.34860, -77.90085)  | 
            
                Roundabout Existing  | 
            
                Unknown Unknown  | 
            
                3 Approaches 0 Driveways 50.2891  | 
            
                Other (At-Grade) Multilane (2 Lane, unspecified)  |   
            2015 | ICD estimated from Google Maps linework. | 
| 
                Rocky Mount,
                NC Nash Co. United States  | 
            
                Eastern Ave. / Nash Community College entrance (35.97127, -77.89972)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 32.8639  | 
            
                Other (At-Grade) Single-Lane  |   
            2013 | ICD estimated from Google Maps linework. | 
| 
                Smithfield,
                NC Johnston Co. United States  | 
            
                Industrial Park Dr. / Outlet Center Dr. (35.50568, -78.32335)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 26.2508  | 
            
                Other (At-Grade) Single-Lane  |   
            2014 | ICD estimated from Google Maps linework. | 
| 
                Notre Dame,
                IN St. Joseph Co. United States  | 
            
                Douglas Rd. / Moreau Dr. (41.70933, -86.23394)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 48.7680  | 
            
                Other (At-Grade) Multilane (2 Lane, 2x2 max)  |   
            2013 | Year Completed estimated (2011-2015). | 
| 
                South Bend,
                IN St. Joseph Co. United States  | 
            
                Douglas Rd. / Juniper Rd. (41.71270, -86.23662)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 48.7680  | 
            
                Other (At-Grade) Multilane (2 Lane, 2x2 max)  |   
            2013 | Year Completed estimated (2011-2015). | 
| 
                Westfield,
                IN Hamilton Co. United States  | 
            
                E 161st St. / US 31 NB Ramps (40.02195, -86.13092)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 50.2920  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max)  |   
            2013 | Raindrop shaped. Series of 3 roundabouts. | 
| 
                Westfield,
                IN Hamilton Co. United States  | 
            
                E 161st St. / US 31 SB Ramps (40.02183, -86.13259)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield Unknown  | 
            
                3 Approaches 0 Driveways 50.2920  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max)  |   
            2013 | Raindrop shaped. Series of 3 roundabouts. | 
| 
                Carmel,
                IN Hamilton Co. United States  | 
            
                E Main St. / Keystone Pkwy. SB Ramps (39.97844, -86.11319)  | 
            
                Roundabout Existing  | 
            
                All-Way Yield None  | 
            
                3 Approaches 0 Driveways 45.7200  | 
            
                Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max)  |   
            2009 | Raindrop shaped. Year Completed estimated (2008-2010). |