29410 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Durango, CO
La Plata Co.
United States
US 550 / US 160 EB Entrance Ramp
(37.22666, -107.83949)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Unknown
2024 https://www.facebook.com/coloradodot/videos/grandview-interchange-us-550-us-160-durango-on-monday-715-many-motorists-travele/853241030015092/
Penrose, CO
Fremont Co.
United States
SR 115 / US 50 EB Ramps
(38.41802, -105.04263)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 https://krdo.com/news/top-stories/2024/07/02/traffic-roundabout-now-open-at-interchange-of-us-50-highway-115-in-fremont-county/
Fremont, NE
Dodge Co.
United States
US 77 / US 275 NB Ramps / Old Highway 8
(41.40473, -96.44391)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
50.2920
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2024).
Fremont, NE
Dodge Co.
United States
US 77 / US 275 SB Ramps
(41.40474, -96.44633)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
48.7680
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Yield-controlled right-turn-only lane on west leg. Year Completed estimated (2021-2024).
Helena, MT
Lewis and Clark Co.
United States
SR 279 (Lincoln Rd. E) / I-15 NB Ramps
(46.70444, -112.01118)
Roundabout
Existing
All-Way Yield
Unknown
3 Approaches
0 Driveways
32.0040
Freeway Ramps (Grade-Separated)
Single-Lane
2022 Raindrop shaped. Right-turn-only lane on south leg. Year Completed estimated (2021-2024).
Tumwater, WA
Thurston Co.
United States
6th Ave. SW / I-5 NB Ramps
(46.99904, -122.91042)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
36.5760
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 Yield-controlled right-turn bypass lane with low entry angle on north leg. Left-turn-only lane on south leg. https://www.facebook.com/cityoftumwater/videos/roundabouts/851059580420485/
Kirkland, WA
King Co.
United States
NE 132nd St. / Totem Lake Blvd. NE / 116th Ave. NE / I-405 NB Entrance Ramp
(47.71844, -122.18653)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
36.5760
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2024 https://wsdot.wa.gov/construction-planning/search-projects/i-405northeast-132nd-street-interchange-project
Kirkland, WA
King Co.
United States
NE 132nd St. / 116th Way NE / I-405 SB Exit Ramp / 114th Pl. NE
(47.71843, -122.18834)
Roundabout
Existing
All-Way Yield
Rectangular Rapid Flashing Beacon (RRFB)
5 Approaches
0 Driveways
42.6720
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x2 max)
2024 https://wsdot.wa.gov/construction-planning/search-projects/i-405northeast-132nd-street-interchange-project
Portage Township, OH
Ottawa Co.
United States
SR 53 (Catawba Rd.) / SR 2 Ramps
(41.50681, -82.85952)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2024 https://sanduskyregister.com/news/522707/recognizing-the-roundabout/
Anoka, MN
Anoka Co.
United States
Thurston Ave. / US 10-US 169 Ramps
(45.21253, -93.41300)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6720
Freeway Ramps (Grade-Separated)
Single-Lane
2024 Peanut shaped. Node ICDs 140 ft; length 290 ft. Year Completed estimated (2023-2024).