City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Bowling Green,
KY Warren Co. United States |
Frist Blvd. / Golden Autumn Way (36.96509, -86.40386) |
Other Existing |
All-Way Yield None |
2 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2018 | Lane change required to make left turn. |
Rogers,
AR Benton Co. United States |
S Pinnacle Hills Pkwy. / W JB Hunt Dr. (36.30245, -94.18936) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2023 | Yield-controlled right-turn bypass lanes on north and south legs. https://www.youtube.com/watch?v=fxI71JbGsVk |
Rogers,
AR Benton Co. United States |
S Pinnacle Hills Pkwy. / S Champions Dr. (36.30103, -94.18902) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2023 | https://www.youtube.com/watch?v=fxI71JbGsVk |
Richmond Hill,
GA Bryan Co. United States |
GA 144 / Belfast River Rd. / Captain Matthew Freeman Dr. (31.88082, -81.26192) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2015 | Yield-controlled right-turn bypass lanes on north, east, and south legs included in permanent construction. Initial construction 2015 as temporary roundabout; permanent construction completed 2022. |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass WB Ramps (35.31432, -81.48908) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / Shelby Bypass EB Ramps (35.31324, -81.49081) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2022-2024). |
Shelby,
NC Cleveland Co. United States |
NC-150 (Cherryville Rd.) / NC-180 (N Post Rd.) (35.31228, -81.49215) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Left-turn-only lane on northeast leg. Year Completed estimated (2022-2024). |
Basehor,
KS Leavenworth Co. United States |
N 155th St. / Parallel Rd. (39.12860, -94.93856) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/photo/?fbid=843322321249859&set=happy-friday-basehor-we-are-very-excited-to-share-that-the-155th-street-roundabo |
Macon,
GA Bibb Co. United States |
US 80-GA 22 (Eisenhower Pkwy.) / GA 361 (Fulton Mill Rd.) (32.79946, -83.75254) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2023 | Yield-controlled right-turn bypass lanes on east and west legs. |
Columbia,
MO Boone Co. United States |
Nocona Pkwy. / Artemis Dr. (38.89292, -92.28649) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
Macon,
GA Bibb Co. United States |
N Pierce Ave. / N Pierce Cir. (32.87326, -83.65562) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2013-2015). |
Napa,
CA Napa Co. United States |
RiverSound Way / Kaiser Rd. (38.25745, -122.27725) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | |
Davison,
MI Genesee Co. United States |
Lapeer Rd. / Oak Rd. (43.01793, -83.49786) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://davisonindex.mihomepaper.com/articles/new-roundabout-opens/ |
Cecilia,
KY Hardin Co. United States |
Woodland Way / Greencrest Dr. / Lombardy Dr. / Red Sunset Blvd. (37.66056, -85.94234) |
Other Existing |
All-Way Yield None |
4 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
Shepherdsville,
KY Bullitt Co. United States |
Michelle Dr. / Lanai Dr. (37.97994, -85.66681) |
Other Existing |
Uncontrolled None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2006 | |
Shepherdsville,
KY Bullitt Co. United States |
Michelle Dr. / Landon Way / Casey Ct. (37.97969, -85.66524) |
Other Existing |
Uncontrolled None |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2006 | |
(uninc),
GA Paulding Co. United States |
Ridge Rd. / Bob Hunton Rd. / Cohran Store Rd. (33.80461, -84.84089) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2019-2022). |
Whitestown,
IN Boone Co. United States |
S Perry Worth Rd. / Sunset Way (39.95375, -86.36091) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
(unincorporated),
CO Jefferson Co. United States |
US 40 / CR 65 / I-70 WB Exit Ramp (39.71621, -105.39166) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects. |
Evergreen,
CO Clear Creek Co. United States |
US 40 / Homestead Rd. / I-70 WB Entrance Ramp (39.72195, -105.40944) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | Through bypass lane on east leg. Year Completed estimated (2023-2024). https://www.codot.gov/projects/i70floydhill/earlyprojects. |