City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
Grandview,
MO Jackson Co. United States |
US 71 NB Frontage Road / I-49-US 71 NB Ramps (38.86704, -94.52594) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
US 71 SB Frontage Rd. / I-49-US 71 SB Ramps (38.87725, -94.52680) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
Main St. / US 71 Frontage Rd. (38.88876, -94.52422) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Unknown |
2022 | https://www.grandview.org/government/city-departments/public-works/projects/i-49-outer-roads-conversion |
Grandview,
MO Jackson Co. United States |
Lawnbale St. / E 139th St. (38.87251, -94.52865) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
South Fulton,
GA Fulton Co. United States |
Stonewall Tell Rd. / Butner Rd. (north) (33.65148, -84.59440) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Two single-lane roundabouts replaced single, skewed intersection. https://www.mdjonline.com/neighbor_newspapers/south_metro/news/dual-roundabouts-opened-in-city-of-south-fulton/article_921e127e-8dce-11ed-92b5-a370f676eb67.html |
South Fulton,
GA Fulton Co. United States |
Stonewall Tell Rd. / Butner Rd. (south) (33.65079, -84.59496) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Two single-lane roundabouts replaced single, skewed intersection. https://www.mdjonline.com/neighbor_newspapers/south_metro/news/dual-roundabouts-opened-in-city-of-south-fulton/article_921e127e-8dce-11ed-92b5-a370f676eb67.html |
Rochester Hills,
MI Oakland Co. United States |
E Auburn Rd. / Harrison Ave. (42.63763, -83.09821) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2019 | Pair of roundabouts installed as part of a streetscape renovation. |
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. NE / I-80 WB Ramps (41.67198, -91.44380) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was entrance ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Iowa City,
IA Johnson Co. United States |
Herbert Hoover Hwy. SE / I-80 EB Ramps (41.67099, -91.44629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | Previous intersection was exit ramp only. https://www.news.iowadot.gov/newsandinfo/2022/06/eastbound-i-80-ramps-at-herbert-hoover-highwayjohnson-county-road-f-44-exit-249-in-johnson-county-to.html |
Rocklin,
CA Placer Co. United States |
Rocklin Rd. / Pacific St. (38.79073, -121.23610) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2023 | Yield-controlled right-turn bypass lanes on west and south legs; add-lane right-turn bypass lane on east leg. https://www.rocklin.ca.us/roundabout |
(unincorporated),
NE Sarpy Co. United States |
S 180th St. / Cornhusker Rd. (41.16150, -96.19661) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Lakewood,
WA Pierce Co. United States |
North Gate Rd. SW / Edgewood Ave. SW / Winona St. SW (47.14678, -122.56385) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.kiro7.com/news/south-sound-news/stolen-car-stopped-by-wet-cement-lakewood/GDU77T3M6NC2RKBPTKKY5N53SA/ |
Kalispell,
MT Flathead Co. United States |
US 2 / Springcreek Rd. / Dern Rd. (48.19696, -114.37378) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | https://www.mdt.mt.gov/pubinvolve/dernspring/ |
Viviers-du-Lac,
Auvergne-Rhône-Alpes Savoie France |
D1202 (Les Rives du Lac) / D1201a (Route du Bourget) / D17b (Route du Lac) (45.64779, 5.89304) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
Two entries have two lanes both designated as through movements but with single-lane exits throughout. | |
Viviers-du-Lac,
Auvergne-Rhône-Alpes Savoie France |
D1201 (Les Rives du Lac) / D50 / Chemin du Port (45.65105, 5.89320) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Voglans,
Auvergne-Rhône-Alpes Savoie France |
D1201 (Route d'Aix) / D17 / Route de l'Aéroport (45.63766, 5.89217) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Voglans,
Auvergne-Rhône-Alpes Savoie France |
D1504 / D1201 Ramps (45.61639, 5.88404) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 96.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
||
Chambéry,
Auvergne-Rhône-Alpes Savoie France |
Avenue de Villarcher / Rue des Marais (45.61489, 5.88752) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Chambéry,
Auvergne-Rhône-Alpes Savoie France |
Avenue de Villarcher / Rue des Marais (45.61268, 5.88781) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, unspecified) |
||
Chambéry,
Auvergne-Rhône-Alpes Savoie France |
Rue de Belle Eau / Avenue de Villarcher (45.61041, 5.88918) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 28.0000 |
Other (At-Grade) Single-Lane |
||
Waynesville,
MO Pulaski Co. United States |
Historic Route 66 / Hwy T (37.81205, -92.23491) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2018). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / Raider Rd. / US 67 SB Ramps (37.91037, -90.53216) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.2440 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Elliptical shaped. ICD = 155 ft x 145 ft. Year Completed estimated (2007-2009). |
Bonne Terre,
MO St. Francois Co. United States |
Old Orchard Rd. / US 67 NB Ramps (37.91294, -90.53029) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
2008 | Year Completed estimated (2007-2009). |
Lino Lakes,
MN Anoka Co. United States |
Birch St. / Tomahawk Trl. (45.14236, -93.11531) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | Completed October 2021. |
Lino Lakes,
MN Anoka Co. United States |
Birch St. / Shadow Lake Dr. (45.14228, -93.10960) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2021 | Completed October 2021. |
Afton,
VA Albemarle Co. United States |
US 250 (Rockfish Gap Turnpike) / SR 151 (Critzers Shop Rd.) (38.02982, -78.80684) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.blueridgelife.com/2022/11/17/250-151-roundabout-is-active-so-far-so-good-but-its-early/ |
Kansas City,
MO Clay Co. United States |
N Shoal Creek Pkwy. / Maplewoods Pkwy. (39.28995, -94.55702) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2021 | Merging right-turn bypass lane lane on west leg. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / NE 106th St. / NE Staley Ferris Dr. (39.28508, -94.55712) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2021 | Peanut shaped. Replaced two offset T-intersections. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / New Mark Dr. / NE 100th St. (39.27475, -94.55715) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2021 | https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Clay Co. United States |
N Maplewoods Pkwy. / NE 96th St. (39.26747, -94.55716) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | East leg stubbed. https://www.kcmo.gov/Home/Components/FacilityDirectory/FacilityDirectory/139/360?npage=2 |
Kansas City,
MO Platte Co. United States |
Line Creek Pkwy. / Tiffany Springs Rd. (39.25957, -94.61010) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
Kansas City,
MO Clay Co. United States |
N Booth Ave. / NE Shoal Creek Valley Dr. / Commercial Dr. (39.24626, -94.47674) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2020 | Yield-controlled right-turn bypass lane on west leg. Year Completed estimated (2020-20210. |
Kansas City,
MO Clay Co. United States |
NE Shoal Creek Valley Dr. / (unknown) (39.24673, -94.47459) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2020 | |
Sedalia,
MO Pettis Co. United States |
Rte Y (W 16th St.) / Winchester Dr. (38.69957, -93.27763) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. (38.63617, -121.09165) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
Folsom,
CA Sacramento Co. United States |
Grand Prairie Rd. / Rustic Ridge Dr. / Alder Creek Pkwy (38.64059, -121.09212) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2018-2019). |
(unincorporated),
OH Delaware Co. United States |
Eagles Landing Dr. / Liberty Grand Blvd. (40.20685, -83.10250) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
Delaware,
OH Delaware Co. United States |
SR 521 / Byxbe Pkwy. (40.30186, -83.02598) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://engineer.co.delaware.oh.us/image_slider/byxbe-campus-project-2022/ |
Avila Beach,
CA San Luis Obispo Co. United States |
Avila Beach Dr. / Palisades Rd. / US 101 SB Ramps (35.17977, -120.70042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening in fall of 2024. | |
Santa Barbara,
CA Santa Barbara Co. United States |
Olive Mill Rd. / Coast Village Rd. / N Jameson Ln. / US 101 Ramps (34.42156, -119.63993) |
Roundabout Unknown |
All-Way Yield Unknown |
5 Approaches 0 Driveways 46.3296 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening in fall 2025. | |
Montecito,
CA Santa Barbara Co. United States |
San Ysidro Rd. / N Jameson Ln. / US 101 NB Ramps (34.42287, -119.63152) |
Roundabout Unknown |
Unknown Unknown |
5 Approaches 0 Driveways 53.6445 |
Freeway Ramps (Grade-Separated) Single-Lane |
This is an unique kidney shaped single-lane roundabout (approx. varying ICD 176' x 116'). Anticipated opening in fall 2025. | |
San Juan Bautista,
CA San Benito Co. United States |
SR 156 (San Juan Hollister Rd.) / Bixby Rd. (36.84096, -121.49042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 68.2749 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
ICD 224 ft x 211 ft. Anticipated opening year in 2025. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 EB Ramps (36.76908, -121.73823) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.7573 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. Future 3rd leg is planned to connect to BlackieRd. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 WB Ramps (36.77058, -121.73771) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. | |
Castroville,
CA Monterey Co. United States |
Castroville Blvd. / (unknown) (36.77419, -121.74051) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 49.3776 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2025. | |
Fisherman Flats,
CA Monterey Co. United States |
SR 68 / Josselyn Canyon Rd. (36.58359, -121.85655) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / Olmsted Rd. (36.58399, -121.84976) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.6344 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Del Rey Oaks,
CA Monterey Co. United States |
SR 68 / Canyon del Rey Blvd. / Monterra Rd. (36.58090, -121.82797) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 52.5780 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / York Rd. (36.57156, -121.80839) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 ./ Pasadera Dr. / Boots Rd. (36.56766, -121.77857) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.9087 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Laureles Grade Rd. (36.56964, -121.75566) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.5427 |
Other (At-Grade) Single-Lane |
Future 4th leg connects to Laguna Seca Entrance. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Corral de Tierra Rd. / Cypress Church Dr. (36.57854, -121.72709) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.1772 |
Other (At-Grade) Single-Lane |
Oval shaped. ICD = 151.5 ft x 141.5 ft. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / San Benancio Rd. (36.57977, -121.72073) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.2323 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 NB Ramps (35.56543, -120.70151) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.0829 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 184 ft x 157 ft. Anticipated opening year 2030. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 SB Ramps / Theatre Dr. (35.56644, -120.70261) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.8909 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2030. | |
Morro Bay,
CA San Luis Obispo Co. United States |
Atascadero Rd. / US 101 NB Ramps / Main St. (35.38023, -120.85489) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 160 ft x 130 ft. Anticipated opening year 2026. | |
New Haven,
CT New Haven Co. United States |
Chapel St. / Yale Ave. (41.31448, -72.95891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Peanut shaped. Replaces skewed intersection. https://www.fox61.com/video/news/local/new-haven-county/new-haven/first-of-its-kind-peanut-shaped-roundabout-opens-in-new-haven/520-3db77500-495f-4ae7-a441-ed85863cd327 |
Raymore,
MO Cass Co. United States |
MO 58 / Ward Rd. (38.80255, -94.40147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.raymore.com/Home/Components/News/News/2466/ |
Raymore,
MO Cass Co. United States |
S Madison St. / (park access) (38.78857, -94.45769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2009-2010). |
Lafayette,
LA Lafayette Par. United States |
Dulles Dr. / N Domingue Ave. (30.21055, -92.08378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Ottawa,
ON Ottawa Canada |
Greenbank Rd. / Half Moon Bay Rd. (45.25555, -75.73742) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Year Completed estimated (2021-2023). |
Novi,
MI Oakland Co. United States |
W 9 Mile Rd. / Taft Rd. (42.45158, -83.49410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.candgnews.com/news/novi-council-approves-lighting-for-new-roundabout-635 |
Le Claire,
IA Scott Co. United States |
Wisconsin St. / 35th St. SW / (parking) (41.59770, -90.39139) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | Replaced offset T intersections. https://www.leclaireiowa.gov/340/Wisconsin-Street-and-35th-Street-Reconst |
Truckee,
CA Nevada Co. United States |
Donner Pass Rd. / Cold Stream Rd. / I-80 EB Ramps (39.32359, -120.22747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Panama City Beach,
FL Bay Co. United States |
Front Beach Rd. / S Arnold Rd. (30.22327, -85.89081) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Triangular section of roads converted to roundabout with two of the former triangle sides to be converted to large-radius right-turn bypass lanes. https://www.pcbfl.gov/Home/Components/News/News/4818/ https://www.newsherald.com/story/news/local/2023/01/20/panama-city-beach-opens-a-new-lane-on-front-beach-road-roundabout/69820095007/ |
Stockton,
CA San Joaquin Co. United States |
E Miner Ave. / N San Joaquin St. (37.95611, -121.28804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Bicycle lanes leading into roundabout with bicycle sharrows on outer edge of circulatory roadway beyond each entry. https://twitter.com/stocktonupdates/status/1407046118156947458 |
Santa Clara,
CA Santa Clara Co. United States |
(shopping center entrance) / (parking) (37.35667, -121.93755) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.svvoice.com/coleman-costco-installing-roundabout/ |
Ramara,
ON Simcoe Canada |
Hwy 12 / CR 169 / Concession Road 6 (44.57153, -79.18908) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 NB Ramps (57.12949, 12.31446) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2009 and before July 2016 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches. |
Varberg,
Halland County Varberg Sweden |
Värnamovägen / E6-E20 SB Ramps (57.12786, 12.31052) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7190 |
Freeway Ramps (Grade-Separated) Single-Lane |
2016 | Built after 2012 and before 2018 as shown by Google StreetView. Previous control Yield from ramp and no control on other two approaches |
Varberg,
Halland County Varberg Sweden |
Rte 153 (Värnamovägen) / Holmagärdegatan (57.12562, 12.30381) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7190 |
Other (At-Grade) Single-Lane |
2021 | Construction of crossroad stared in 2019. Roundabout operational in 2021 with three approaches and possibly in 2020 as well. Fourth approach 'built' but not yet opened to traffic in 2021. |
Varberg,
Halland County Varberg Sweden |
Rte 153 (Värnamovägen) / Österleden (57.12319, 12.28811) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2008 | Built as a roundabout with four single lane approaches at or before 2008. Widened and has since 2018 three approaches with double entry lanes. Two of those approaches have separate islands between the approach lanes. |
Varberg,
Halland County Varberg Sweden |
Värnamovägen / Kamremsgatan (57.12255, 12.26719) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 2 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2017 | Construction of one approach finished in 2018. |
Varberg,
Halland County Varberg Sweden |
Rte 41 / Rte 153 (57.12336, 12.26199) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, unspecified) |
2000 | Construction year is approximate but before 2008. |
Lincoln,
NE Lancaster Co. United States |
Holdrege St. / Cedar Cove Rd. (40.82790, -96.59731) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | Cedar Cove was previously a gravel road with no stop sign. Year Completed estimated (2021-2022). |
Lincoln,
NE Lancaster Co. United States |
W Holdrege St. / W Partridge Ln. (40.82819, -96.79292) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Lincoln,
NE Lancaster Co. United States |
W Holdrege St. / NW 50th St. (40.82822, -96.78975) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Lincoln,
NE Lancaster Co. United States |
A St. / S 89th St. (40.79883, -96.59931) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2021 | |
Lincoln,
NE Lancaster Co. United States |
A St. / S 94th St. (40.79880, -96.59348) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | |
Lincoln,
NE Lancaster Co. United States |
Van Dorn St. / S 87th St. (40.78424, -96.60261) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2020-2021). |
Lincoln,
NE Lancaster Co. United States |
Van Dorn St. / S 91st St. / Big Timber Rd. (40.78422, -96.59548) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2020 | |
Lincoln,
NE Lancaster Co. United States |
S 40th St. / Wilderness Hills Blvd. (40.71914, -96.66346) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Lincoln,
NE Lancaster Co. United States |
Rokeby Rd. / S 73rd Ave. (40.71184, -96.62136) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Lincoln,
NE Lancaster Co. United States |
Rokeby Rd. / Friedman Rd. (40.71183, -96.61568) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Lincoln,
NE Lancaster Co. United States |
Yankee Hill Rd. / S 44th St. (40.72623, -96.65865) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.klkntv.com/lincolns-yankee-hill-road-reopens-after-more-than-a-year/ |
Lincoln,
NE Lancaster Co. United States |
Yankee Hill Rd. / S 48th St. (40.72625, -96.65407) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.klkntv.com/lincolns-yankee-hill-road-reopens-after-more-than-a-year/ |
Lincoln,
NE Lancaster Co. United States |
Yankee Hill Rd. / S 50th St. (40.72629, -96.64915) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.klkntv.com/lincolns-yankee-hill-road-reopens-after-more-than-a-year/ |
Varberg,
Halland County Varberg Sweden |
Lindbergsvägen / Sävstaholmsvägen / Astrakanvägen (57.13049, 12.27130) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2010 | Year Completed estimated (2009-2012). |
Varberg,
Halland County Varberg Sweden |
Lindsbergvägen / Vlaidas väg (57.13218, 12.27183) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2010 | Around 2009 and definitely before April 2010 |
Varberg,
Halland County Varberg Sweden |
Lindbergsvägen / Kockatorpsvägen (57.13711, 12.27906) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2017 | South leg stubbed. Construction started after 2011, probably in 2017. Operational in July 2018 |
Varberg,
Halland County Varberg Sweden |
Kockatorpsvägen 3 (57.13904, 12.27763) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2018 | North and east legs stubbed. Year Completed estimated (2017-2018). |
Hickman,
NE Lancaster Co. United States |
S 68th St. / Hickman Rd. (40.62515, -96.62933) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://www.facebook.com/photo/?fbid=457338483244753&set=ecnf.100069058155212 https://www.hickman.ne.gov/vnews/display.v/ART/62acd7b6a8725 |
Varberg,
Halland County Varberg Sweden |
Österleden / Trädlyckevägen (57.11130, 12.29228) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2000 | The roundabout may be older than from 2000. StreetView from 2010 shows grown vegetation in center island |
Varberg,
Halland County Varberg Sweden |
Trädlyckevägen / Föreningsgatan / Äckregårdsvägen (57.11134, 12.27585) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2000 | Probably completed before the year 2000 |
Varberg,
Halland County Varberg Sweden |
Västkustvägen / Trädlyckevägen (57.11118, 12.26063) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2000 | Right-turn-only lane on north leg; two-lane exit on west leg. Probably completed a few years before 2000 |
Varberg,
Halland County Varberg Sweden |
Västkustvägen / Gödestadsvägen (57.11252, 12.26023) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2000 | The roundabout was originally built with 4 legs; west leg closed off before 2009. That leg was completely eliminated by 2018. Center island also reconstructed around 2017. The roundabout has single lane approaches but two exit lanes on south leg. |
Varberg,
Halland County Varberg Sweden |
Trädlyckevägen / Magasinsgatan / Sveagatan (57.10972, 12.25704) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2018 | There was a rotary here before with yield on most approaches and high speed paths. Rebuilt as a modern roundabout in 2018. |
Varberg,
Halland County Varberg Sweden |
Träslövsvägen / Sveagatan (57.10469, 12.25597) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | This was a conventional intersection with 2-way yield control in 2011 and was reconstructed as a roundabout by 2017. |
Varberg,
Halland County Varberg Sweden |
Träslövsvägen / Skansgatan / Ringvägen (57.10349, 12.26032) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2000 | The roundabout was most likely constructed before 2000. It has a central island consisting of a traversable apron separated from the travel lane by a low traversable granite curb |
Varberg,
Halland County Varberg Sweden |
Västkustvägen / Trafikplats Påskberg / (parking) (57.10362, 12.26766) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2008 | Probably completed several years before 2008. One of the approaches is functioning as a driveway to parking lats and businesses but also has regular bus transit traffic. The roundabout also serves as a connector from Träslövsvägen which intersects grade separated from Västkustvägen but none of these streets are freeways. |