29869 Results

Search by location, intersection, and comments with the Quick Search below. You can search all other attributes by clicking Advanced Search. Sort results by clicking the headers of any column. Click the Intersection name for a details and aerial view. Search results pages can be bookmarked. Results can be exported to KML for viewing in Google Earth.


Search
Advanced Search Export as KML
City, State
County
Country
Intersection
(Lat, Lng)
Type
Status
Control Type / Other Control Type Approaches / Driveways / ICD (m) Functional Class /
LaneType
Year Completed Comments
Stuart, FL
Martin Co.
United States
NW Green River Pkwy. / NE Baker Rd.
(27.22209, -80.25291)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2010 Year Completed estimated (2009-2010). North leg realigned from west; south leg added.
Stuart, FL
Martin Co.
United States
NW Britt Rd. / NW Fresco Way / NW Goldenrod Rd.
(27.23781, -80.26708)
Other
Existing
Other
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Concentric striped circulatory roadway. Stop control on south leg.
Indiantown, FL
Martin Co.
United States
SW Seminole Dr. / SW Osceola St.
(27.01828, -80.46004)
Other
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
No splitter islands on northwest, northeast, and southeast legs.
Middleton, ID
Canyon Co.
United States
W Highlands Pkwy. / 9th St.
(43.71596, -116.64096)
Other
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 No splitter island on side street.
Middleton, ID
Canyon Co.
United States
W Highlands Pkwy. / Stallion Springs Way
(43.71894, -116.63822)
Other
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
32.0037
Other (At-Grade)
Single-Lane
2008 No splitter islands on side street. Year Completed estimated (2007-2009).
Middleton, ID
Canyon Co.
United States
W Highlands Ranch Pkwy. / W Ayrshire St.
(43.72271, -116.64060)
Other
Existing
Unknown
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
No splitter islands on side street. Pedestrian crossings within circulatory roadway.
Middleton, ID
Canyon Co.
United States
W Highlands Ranch Pkwy. / N Sombrero Ave.
(43.72247, -116.64464)
Other
Existing
Unknown
Unknown
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
No splitter island on side street. Unmarked pedestrian crossings within or adjacent to circulatory roadway.
Middleton, ID
Canyon Co.
United States
W Highland Ranch Pkwy. / N Branding Iron Ave. / W Blue Lightning St.
(43.72344, -116.65073)
Other
Existing
Unknown
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
No splitter islands on side street. Pedestrian crossings within or adjacent to circulatory roadway.
Longmont, CO
Boulder Co.
United States
Sundance Dr. / Galapagos Pl.
(40.20011, -105.06468)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2016-2017).
Longmont, CO
Boulder Co.
United States
Sundance Dr. / Tyrrhenian Dr.
(40.20202, -105.06468)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2016-2017).
Longmont, CO
Boulder Co.
United States
Sundance Dr. / Tyrrhenian Cir.
(40.19784, -105.06451)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2016-2017).
Longmont, CO
Boulder Co.
United States
Sundance Dr. / Twilight Dr.
(40.19529, -105.06175)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2016 Initial construction without splitter islands 1999-2002. Splitter islands added 2016-2017.
Longmont, CO
Boulder Co.
United States
S Martin St. / Bountiful Ave.
(40.14740, -105.08831)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2017
Frederick, CO
Weld Co.
United States
Colorado Blvd. / 5th St.
(40.09868, -104.94236)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
54.8640
Other (At-Grade)
Single-Lane
2016 Striped out inside circulating lane and inside entry lanes on north and south legs, with evidence of vehicle paths traveling over striped circulatory roadway area. Year Completed estimated (2015-2017).
Frederick, CO
Weld Co.
United States
Aggregate Blvd. / Wyndham Hill Pkwy.
(40.09242, -104.99890)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Single-Lane
2006 Right-turn-only lanes on north and south legs. Striped out portions of circulatory roadway.
Erie, CO
Boulder Co.
United States
Jasper Rd. / Lombard St.
(40.05485, -105.06504)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2021 Year Completed estimated (2020-2021).
Broomfield, CO
Broomfield Co.
United States
W 169th Ave. / Palisade Pkwy.
(40.00437, -104.99443)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2014
Lafayette, CO
Boulder Co.
United States
Roser Dr. / Crater Lake Ln. / Murphy Creek Dr.
(39.99879, -105.13387)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
36.5760
Other (At-Grade)
Single-Lane
2009 Year Completed estimated (2008-2010).
Louisville, CO
Boulder Co.
United States
Roser Dr. / W Hecla Dr. / Paschal Dr.
(39.99411, -105.13074)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2011
Louisville, CO
Boulder Co.
United States
E Hecla Dr. / Snowberry Ln.
(39.99167, -105.12415)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2008 Year Completed estimated (2007-2008).
Louisville, CO
Boulder Co.
United States
E Hecla Dr. / Golden Eagle Way / Rose Ct.
(39.99337, -105.12375)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2008 Year Completed estimated (2007-2008).
Thornton, CO
Adams Co.
United States
E 162nd Ave. / Grant St. / (parking)
(39.98980, -104.98308)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.7680
Other (At-Grade)
Single-Lane
2007
Thornton, CO
Adams Co.
United States
E 163rd Ave. / Elizabeth St.
(39.99121, -104.95523)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2017 Year Completed estimated (2017-2018).
Brighton, CO
Adams Co.
United States
Longs Peak St. / N 46th Ave.
(39.99462, -104.75972)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2021
Brighton, CO
Adams Co.
United States
Longs Peak St. / Silo Ct.
(39.99463, -104.75777)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2022).
Brighton, CO
Adams Co.
United States
Longs Peak St. / Baler Ct.
(39.99464, -104.75476)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2022).
Brighton, CO
Adams Co.
United States
Longs Peak St. / Bowie Dr. / N 46th Ave.
(39.99239, -104.75969)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
33.5280
Other (At-Grade)
Single-Lane
2021 2022 or earlier (SV)
Brighton, CO
Adams Co.
United States
156th Ave. / 157th Ave. / Syracuse Way
(39.97989, -104.89921)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
38.1000
Other (At-Grade)
Single-Lane
2018 Year Completed estimated (2018-2019).
Thornton, CO
Adams Co.
United States
Grant St. / E 146th Ave. / (parking)
(39.96090, -104.98184)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2018 Year Completed estimated (2018-2019).
Thornton, CO
Adams Co.
United States
Grant St. / E 143rd Pl.
(39.95485, -104.98191)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2013 Opened with north and west legs 2013. South and east legs added 2015.
Thornton, CO
Adams Co.
United States
Grant St. / E 141 Pl.
(39.95214, -104.98286)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2016 West leg added 2022-2023.
Thornton, CO
Adams Co.
United States
Lincoln St. / E 141st Pl. / (parking)
(39.95280, -104.98624)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2013
Thornton, CO
Adams Co.
United States
Grant St. / E 140th Ave. / (parking)
(39.94932, -104.98311)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
62.4840
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2018 Year Completed estimated (2018-2019).
Thornton, CO
Adams Co.
United States
Grant St. / (parking)
(39.94597, -104.98307)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
60.9600
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2018 Year Completed estimated (2018-2019).
Hardy, VA
Franklin Co.
United States
Booker T Washington Hwy. (SR 122) / Hardy Rd. (SR 636)
(37.12765, -79.75102)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2021 https://www.virginiadot.org/newsroom/salem/2021/traffic-alert-roundabout-at-route-122-and-hardy-road-in-franklin-county-to-open-to-traffic9-20-2021.asp
(unincorporated), ON
Simcoe
Canada
CR 14 / Bayberry Dr.
(44.02934, -79.85396)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2023
Arcadia, IN
Hamilton Co.
United States
E 236th St. / US 31 SB Ramps
(40.13069, -86.12917)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2023 https://www.in.gov/indot/about-indot/central-office/welcome-to-the-greenfield-district/interchange-project-at-us-31-and-236th-street/
Cicero, IN
Hamilton Co.
United States
Northbound Ramps / E 236th St. / US 31 NB Ramps
(40.13083, -86.12698)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2023 https://www.in.gov/indot/about-indot/central-office/welcome-to-the-greenfield-district/interchange-project-at-us-31-and-236th-street/
Valdosta, GA
Lowndes Co.
United States
Kinderlou Forest / Island Creek Rd.
(30.80303, -83.38523)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2003 Year Completed estimated (1999-2005).
Valdosta, GA
Lowndes Co.
United States
Kinderlou Forest / Bear Lake Rd.
(30.80957, -83.38506)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2003 Year Completed estimated (1999-2005).
Stockton, CA
San Joaquin Co.
United States
Ocean Mist Way / A G Spanos Blvd.
(38.05497, -121.34964)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2006
Stockton, CA
San Joaquin Co.
United States
Breaker Way / Sand Castle Way
(38.05649, -121.34750)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
30.4800
Other (At-Grade)
Single-Lane
2006
Engelwood, CO
Douglas Co.
United States
Aviator Way / Aviator Ln.
(39.55846, -104.84554)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2003 Year Completed estimated (2002-2003). South leg added 2004-2005.
Aurora, CO
Arapahoe Co.
United States
S Sampson Gulch Way / E Clifton Dr.
(39.56850, -104.69683)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2015-2017).
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Kilang / Jalan Jentera / Jalan Daya
(1.57086, 110.38610)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
130.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Kemajuan /Jalan Keruing / Jalan Tekad
(1.56589, 110.39047)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
165.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Belian / Jalan Mersawa
(1.55877, 110.38910)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
120.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Oval shaped. ICD = 120 m x 105 m.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Demak Laut / (unknown)
(1.59627, 110.40727)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
95.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Concentric striped circulatory roadway.
Kuching, Sarawak
Bahagian Kuching
Malaysia
Rte 1002 / (unknown)
(1.59920, 110.43140)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
110.0000
Other (At-Grade)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Bako
(1.59957, 110.44135)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
200.0000
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Demak Maju / (unknown)
(1.59923, 110.44736)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
130.0000
Other (At-Grade)
Multilane (3+ Lane)
Kuching, Sarawak
Bahagian Kuching
Malaysia
Jalan Sultan Tengah / (unknown)
(1.62387, 110.34799)
Rotary
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
245.0000
Other (At-Grade)
Multilane (3+ Lane)
Columbus, GA
Muscogee Co.
United States
Blackmon Rd. / Greystone Rd.
(32.55196, -84.89764)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2016 Year Completed estimated (2014-2016).
Columbus, GA
Muscogee Co.
United States
Flat Rock Rd. / Midland Commons Blvd.
(32.54189, -84.87478)
Other
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021 Lane changes required to exit. Year Completed estimated (2022-2022).
Columbus, GA
Muscogee Co.
United States
Flat Rock Rd. / (unknown)
(32.54468, -84.87492)
Other
Existing
All-Way Yield
None
4 Approaches
0 Driveways
41.1480
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2021 Lane changes required to exit. Year Completed estimated (2020-2022).
(unincorporated), NV
Clark Co.
United States
SR 156 (Lee Canyon Rd.) / Forest Road 106
(36.31974, -115.67259)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2015 Year Completed estimated (2013-2016).
Rochester, MN
Olmsted Co.
United States
65th St. NW / 50th Ave. NW
(44.09385, -92.53879)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2023
Rochester, MN
Olmsted Co.
United States
48th St. SW / Commercial Dr. SW
(43.95305, -92.47263)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Single-Lane
2023
Rochester, MN
Olmsted Co.
United States
Viola Rd. NE / Century Hills Dr. NE
(44.04783, -92.41933)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6717
Other (At-Grade)
Single-Lane
2023
Rochester, MN
Olmsted Co.
United States
CSAH 44 (60th Ave. NW) / CSAH 4 (Valleyhigh Rd. NW)
(44.05795, -92.55841)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.7680
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2023 https://www.olmstedcounty.gov/post/csah-4-valley-high-road-nw-and-csah-44-reconstruction
Carmel, IN
Hamilton Co.
United States
Smoky Row Rd. / North End Dr.
(39.98560, -86.13813)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 https://content.govdelivery.com/attachments/fancy_images/INCARMEL/2023/05/7675938/4767484/smoky-row_crop.jpg https://content.govdelivery.com/accounts/INCARMEL/bulletins/35c7e4e?fbclid=IwAR2JH8UKd4F6MRVvqVsiXUfV2V1dse_PtuObd0hhCSqbDILigJt3Txdx6Mc#:~:text=in%20winter%202024.-,SMOKY%20ROW,-%3A%C2%A0This%20project
Paso Robles, CA
San Luis Obispo Co.
United States
Golden Hill Rd. / Union Rd.
(35.64021, -120.65811)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
36.5760
Other (At-Grade)
Single-Lane
2023 Peanut shaped. ICD = 120 ft for each node; 300 ft long. https://www.youtube.com/watch?v=8XdqNEsJOU4
Lakewood, WA
Pierce Co.
United States
Washington Blvd. SW / Edgewood Ave. SW
(47.14855, -122.56383)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
27.4320
Other (At-Grade)
Single-Lane
2023
Thorold, ON
Niagara
Canada
Lundy's Ln. / Barker Pkwy.
(43.08044, -79.18675)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.0000
Other (At-Grade)
Single-Lane
2020 Year Completed estimated (2019-2020).
(unincorporated), NC
Cumberland Co.
United States
Blacks Bridge Rd. / Old Plank Rd.
(34.94696, -78.98484)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
45.7200
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022 Yield-controlled right-turn bypass lane on west leg.
Carmel, IN
Hamilton Co.
United States
City Center Dr / Veterans Way
(39.97065, -86.12861)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 https://content.govdelivery.com/attachments/fancy_images/INCARMEL/2023/06/7837794/4827643/city-center-and-veterans-way-2_crop.jpg https://content.govdelivery.com/accounts/INCARMEL/bulletins/362af59#:~:text=VETERANS%20WAY%20AND%20CITY%20CENTER%20DRIVE%20ROUNDABOUT%20%2D%20OPEN%20and%20pictured%20below.
Gretna, NE
Sarpy Co.
United States
S 180th St. / Lincoln Rd.
(41.15455, -96.19669)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
35.0520
Other (At-Grade)
Single-Lane
2023 Year Completed estimated (2021-2023).
Gretna, NE
Sarpy Co.
United States
S 180th St. / Camelback Ave.
(41.15770, -96.19688)
Roundabout
Existing
All-Way Yield
None
5 Approaches
0 Driveways
57.9120
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2023 Year Completed estimated (2022-2023).
St Peter, MN
Nicollet Co.
United States
W Broadway Ave. / Sunrise Dr.
(44.33175, -93.96950)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6720
Other (At-Grade)
Single-Lane
2022 Elliptical shaped. ICD = 140 ft x 130 ft. https://www.keyc.com/2022/08/15/roundabout-construction-begins-st-peter/
Mankato, MN
Blue Earth Co.
United States
CR 12 / Adams St.
(44.16990, -93.92685)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
54.8640
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2022 Year Completed estimated (2021-2023).
Greeley, CO
Weld Co.
United States
N 35th Ave. / W O St. / CR 64
(40.45520, -104.73479)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
67.0560
Other (At-Grade)
Single-Lane
2022 Merging right-turn bypass lanes on all legs. Designed with striped out outer portion of circulatory roadway for future expansion to outside. Year Completed estimated (2021-2023).
Fountain, CO
El Paso Co.
United States
Santa Fe Ave. / S Charter Oak Ranch Rd.
(38.67148, -104.71481)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
48.7680
Other (At-Grade)
Single-Lane
2023 Painted splitter island on west leg. https://www.codot.gov/news/2023/may/mamsip-charter-oak-ranch-road-completed
Anoka, MN
Anoka Co.
United States
Thurston Ave. / Green Haven Pkwy.
(45.21518, -93.41332)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
39.6240
Other (At-Grade)
Single-Lane
2023 Right-turn-only lane on north leg.
Holland, MI
Ottawa Co.
United States
Westshore Mall / (parking)
(42.81319, -86.08626)
Other
Existing
Unknown
None
3 Approaches
0 Driveways
26.8221
Other (At-Grade)
Single-Lane
2021 Entrance to The Shops at Westshore shopping mall
Kent, WA
King Co.
United States
94th Ave. S / S 237th Pl.
(47.38921, -122.21537)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
19.2024
Other (At-Grade)
Single-lane w/ Traversable Central Island
2023 Raised but mountable central island, painted splitter islands.
Richfield Township, OH
Lucas Co.
United States
W Sylvania Ave. / Kilburn Rd.
(41.68717, -83.78585)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
Other (At-Grade)
Single-Lane
2023 https://www.13abc.com/2023/06/07/closures-expected-amidst-sylvania-ave-roundabout-construction/
Tempe, AZ
Maricopa Co.
United States
W 12th St. / S Judd St.
(33.41609, -111.94855)
Traffic Calming Circle
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
Tempe, AZ
Maricopa Co.
United States
W 12th St. / S Roosevelt St.
(33.41608, -111.94728)
Traffic Calming Circle
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
Tempe, AZ
Maricopa Co.
United States
W 11th St. / S Roosevelt St.
(33.41779, -111.94727)
Traffic Calming Circle
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
Tempe, AZ
Maricopa Co.
United States
W 9th St. / S Roosevelt St.
(33.42064, -111.94728)
Traffic Calming Circle
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
Tempe, AZ
Maricopa Co.
United States
W Howe St. / S Wilson St.
(33.41682, -111.94575)
Traffic Calming Circle
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
Tempe, AZ
Maricopa Co.
United States
W 10th St. / S Wilson St.
(33.41940, -111.94577)
Traffic Calming Circle
Existing
All-Way Yield
Unknown
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
Federal Way, WA
King Co.
United States
SR 509 (SW Dash Point Rd.) / 47th Ave. SW
(47.32161, -122.39253)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
27.4317
Other (At-Grade)
Single-Lane
2022
Federal Way, WA
King Co.
United States
S 300th St. / 24th Pl. S / (parking)
(47.33323, -122.30213)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
19.8120
Other (At-Grade)
Single-lane w/ Traversable Central Island
2021 Painted splitter islands. Year Completed estimated (2020-2021).
Federal Way, WA
King Co.
United States
S 300th St. / 26th Ave. S / (parking)
(47.33321, -122.30053)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
19.8120
Other (At-Grade)
Single-lane w/ Traversable Central Island
2021 Painted splitter islands. Year Completed estimated (2020-2021).
North Utica, IL
La Salle Co.
United States
US 6 / SR 178
(41.36088, -89.01022)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 https://www.shawlocal.com/news-tribune/2023/04/20/utica-roundabout-is-functional-and-open/
Sherwood Park, AB
Division 11
Canada
Broadway Blvd. / Broadview Dr.
(53.54390, -113.31382)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
35.0000
Other (At-Grade)
Single-Lane
2022 Year Completed estimated (2021-2023).
Carmel, IN
Hamilton Co.
United States
W 111th St. / Spring Mill Ln. / Slade Ave,
(39.94893, -86.16236)
Roundabout
Unknown
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 Opened August 25, 2023. https://content.govdelivery.com/accounts/INCARMEL/bulletins/367b416#:~:text=111TH%20STREET%20AND%20SPRING%20MILL%20ROAD%20ROUNDABOUT
(unincorporated), PA
Westmoreland Co.
United States
Waltz Mill Rd. / I-70 EB Ramps
(40.21090, -79.66617)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2023 Raindrop shaped. Year Completed estimated (2021-2023).
Fort Worth, TX
Tarrant Co.
United States
Las Vegas Trl. / N Normandale St. / S Normandale St.
(32.72946, -97.46704)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
42.6717
Other (At-Grade)
Multilane (2 Lane, 2x1 max)
2023 Replaced complex channelized intersection with multiple stopping points for some movements. Add-lane right-turn bypass lane on southeast leg.
Edina, MN
Hennepin Co.
United States
Eden Ave. / Arcadia Ave. / Normandale Rd. (STH 100 Frontage Rd.)
(44.90952, -93.35224)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
27.4320
Other (At-Grade)
Single-lane w/ Traversable Central Island
2023 Year Completed estimated (2022-2023).
Claremont, MN
Dodge Co.
United States
CR 3 (130th Ave.) / US 14 EB Ramps
(44.03664, -92.98574)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2022 Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html.
Claremont, MN
Dodge Co.
United States
CR 3 (130th Ave.) / US 14 WB Ramps
(44.03834, -92.98577)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Single-Lane
2022 Raindrop shaped. Year Completed estimated (2021-2023). https://www.dot.state.mn.us/d6/projects/hwy14/index.html.
Lake Stevens, WA
Snohomish Co.
United States
Vernon Rd. / 91st Ave. SE
(48.00354, -122.10817)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
24.3840
Other (At-Grade)
Single-lane w/ Traversable Central Island
2022 Peanut shaped. ICD = 80 ft for each node, 185 ft for overall length. No deflection on north and south legs prior to entry. https://www.reddit.com/r/Suburbanhell/comments/y403wy/a_new_peanut_shaped_roundabout_my_city_just/?rdt=48505
Lake Stevens, WA
Snohomish Co.
United States
SR 9 / Vernon Rd.
(48.00461, -122.10670)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2023 https://www.youtube.com/watch?v=5RRqjCCJjRc
Lake Stevens, WA
Snohomish Co.
United States
SR 9 / SR 204 (Snohomish Marysville Rd.) / 7th Pl. NE
(48.00286, -122.10637)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
45.7200
Other (At-Grade)
Multilane (2 Lane, 2x2 max)
2023 https://www.youtube.com/watch?v=5RRqjCCJjRc
West Linn, OR
Clackamas Co.
United States
OR 43 (Willamette Dr.) / I-205 NB Ramps
(45.36158, -122.60954)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Freeway Ramps (Grade-Separated)
Multilane (2 Lane, 2x1 max)
2023 https://www.westlinntidings.com/news/new-i-205-roundabout-opens-at-highway-43-in-west-linn/article_27714680-46ce-11ee-a8d4-db795c337eb4.html (image at https://www.flickr.com/photos/oregondot/ )
Columbia, MO
Boone Co.
United States
Tiger Ave. / Hospital Dr. / (parking)
(38.93766, -92.33084)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 https://www.columbiamissourian.com/news/higher_education/roundabout-at-tiger-avenue-and-hospital-drive-opens-to-drivers/article_fc81909a-2d89-11ee-ad36-cbd098b5227c.html
Tahlequah, OK
Cherokee Co.
United States
US 62 (S Muskogee Ave.) / SR 82
(35.85803, -94.97950)
Roundabout
Existing
All-Way Yield
None
3 Approaches
0 Driveways
0.0000
Other (At-Grade)
Unknown
2023 https://www.youtube.com/watch?v=19jDgEMjwKg.
North Mankato, MN
Nicollet Co.
United States
Lor Ray Dr. / Howard Dr. W
(44.18426, -94.03787)
Roundabout
Existing
All-Way Yield
None
4 Approaches
0 Driveways
0.0000
Other (At-Grade)
Single-Lane
2023 https://www.keyc.com/video/2023/09/01/lor-ray-howard-drive-roundabout-opens/