City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
---|---|---|---|---|---|---|---|
San Juan Bautista,
CA San Benito Co. United States |
SR 156 (San Juan Hollister Rd.) / Bixby Rd. (36.84096, -121.49042) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 68.2749 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
ICD 224 ft x 211 ft. Anticipated opening year in 2025. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 EB Ramps (36.76908, -121.73823) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.7573 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. Future 3rd leg is planned to connect to BlackieRd. | |
Castroville,
CA Monterey Co. United States |
(unknown) / SR 156 WB Ramps (36.77058, -121.73771) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2025. | |
Castroville,
CA Monterey Co. United States |
Castroville Blvd. / (unknown) (36.77419, -121.74051) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 49.3776 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2025. | |
Fisherman Flats,
CA Monterey Co. United States |
SR 68 / Josselyn Canyon Rd. (36.58359, -121.85655) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / Olmsted Rd. (36.58399, -121.84976) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.6344 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Del Rey Oaks,
CA Monterey Co. United States |
SR 68 / Canyon del Rey Blvd. / Monterra Rd. (36.58090, -121.82797) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 52.5780 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
Anticipated opening year 2029. | |
Monterey,
CA Monterey Co. United States |
SR 68 / York Rd. (36.57156, -121.80839) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 46.7868 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 ./ Pasadera Dr. / Boots Rd. (36.56766, -121.77857) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.9087 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Laureles Grade Rd. (36.56964, -121.75566) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.5427 |
Other (At-Grade) Single-Lane |
Future 4th leg connects to Laguna Seca Entrance. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / Corral de Tierra Rd. / Cypress Church Dr. (36.57854, -121.72709) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 46.1772 |
Other (At-Grade) Single-Lane |
Oval shaped. ICD = 151.5 ft x 141.5 ft. Anticipated opening year 2029. | |
Salinas,
CA Monterey Co. United States |
SR 68 / San Benancio Rd. (36.57977, -121.72073) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.2323 |
Other (At-Grade) Single-Lane |
Anticipated opening year 2029. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 NB Ramps (35.56543, -120.70151) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.0829 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 184 ft x 157 ft. Anticipated opening year 2030. | |
Templeton,
CA San Luis Obispo Co. United States |
N Main St. / US 101 SB Ramps / Theatre Dr. (35.56644, -120.70261) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 43.8909 |
Freeway Ramps (Grade-Separated) Single-Lane |
Anticipated opening year 2030. | |
Morro Bay,
CA San Luis Obispo Co. United States |
Atascadero Rd. / US 101 NB Ramps / Main St. (35.38023, -120.85489) |
Roundabout Unknown |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
Oval shaped. ICD = 160 ft x 130 ft. Anticipated opening year 2026. | |
New Haven,
CT New Haven Co. United States |
Chapel St. / Yale Ave. (41.31448, -72.95891) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Peanut shaped. Replaces skewed intersection. https://www.fox61.com/video/news/local/new-haven-county/new-haven/first-of-its-kind-peanut-shaped-roundabout-opens-in-new-haven/520-3db77500-495f-4ae7-a441-ed85863cd327 |
Raymore,
MO Cass Co. United States |
MO 58 / Ward Rd. (38.80255, -94.40147) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.raymore.com/Home/Components/News/News/2466/ |
Raymore,
MO Cass Co. United States |
S Madison St. / (park access) (38.78857, -94.45769) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2009-2010). |
Lafayette,
LA Lafayette Par. United States |
Dulles Dr. / N Domingue Ave. (30.21055, -92.08378) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
Ottawa,
ON Ottawa Canada |
Greenbank Rd. / Half Moon Bay Rd. (45.25555, -75.73742) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | Year Completed estimated (2021-2023). |
Novi,
MI Oakland Co. United States |
W 9 Mile Rd. / Taft Rd. (42.45158, -83.49410) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.candgnews.com/news/novi-council-approves-lighting-for-new-roundabout-635 |
Le Claire,
IA Scott Co. United States |
Wisconsin St. / 35th St. SW / (parking) (41.59770, -90.39139) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | Replaced offset T intersections. https://www.leclaireiowa.gov/340/Wisconsin-Street-and-35th-Street-Reconst |
Truckee,
CA Nevada Co. United States |
Donner Pass Rd. / Cold Stream Rd. / I-80 EB Ramps (39.32359, -120.22747) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Panama City Beach,
FL Bay Co. United States |
Front Beach Rd. / S Arnold Rd. (30.22327, -85.89081) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Triangular section of roads converted to roundabout with two of the former triangle sides to be converted to large-radius right-turn bypass lanes. https://www.pcbfl.gov/Home/Components/News/News/4818/ https://www.newsherald.com/story/news/local/2023/01/20/panama-city-beach-opens-a-new-lane-on-front-beach-road-roundabout/69820095007/ |
Stockton,
CA San Joaquin Co. United States |
E Miner Ave. / N San Joaquin St. (37.95611, -121.28804) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2021 | Bicycle lanes leading into roundabout with bicycle sharrows on outer edge of circulatory roadway beyond each entry. https://twitter.com/stocktonupdates/status/1407046118156947458 |
Santa Clara,
CA Santa Clara Co. United States |
(shopping center entrance) / (parking) (37.35667, -121.93755) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 18.2880 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://www.svvoice.com/coleman-costco-installing-roundabout/ |
Ramara,
ON Simcoe Canada |
Hwy 12 / CR 169 / Concession Road 6 (44.57153, -79.18908) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2022-2023). |
Moses Lake,
WA Grant Co. United States |
SR 17 / Grape Dr. (47.14957, -119.29411) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://wsdot.wa.gov/construction-planning/search-projects/sr-17-grape-drive-intersection-improvements https://columbiabasinherald.com/news/2022/sep/06/grape-dr-roundabout-nears-completion/ |
Steamboat Springs,
CO Routt Co. United States |
Mount Werner Dr. / Steamboat Blvd. / Bangtail Way (40.45897, -106.81287) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.engagesteamboat.net/roundabout |
Steamboat Springs,
CO Routt Co. United States |
Central Park Dr. / Alpine Plaza / (parking) (40.46194, -106.82118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | Entrance to Central Park Plaza shopping center. Year Completed estimated (2015-2018). |
Woodland,
CA Yolo Co. United States |
Road 25A / Parkland Ave. (38.64099, -121.74450) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2020 | |
Woodland,
CA Yolo Co. United States |
Road 25A / Miekle Ave. (38.64078, -121.73624) |
Roundabout Existing |
All-Way Yield None |
2 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2020-2021). |
Woodland,
CA Yolo Co. United States |
Hunt St. / Heritage Pkwy. (38.64945, -121.74580) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2019 | Year Completed estimated (2018-2020). |
Knoxville,
TN Knox Co. United States |
Moss Grove Blvd. / Amberleigh Bluff Way (35.90592, -84.09103) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2012). |
Knoxville,
TN Knox Co. United States |
Montlake Dr. / Lakemoor View Rd. / US 129 SB Exit Ramp (35.92067, -83.95729) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
Meridian,
ID Ada Co. United States |
S Vanguard Way / S Wayfinder Ave. / (parking) (43.59800, -116.43116) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Right-turn-only lane on northeast leg. |
Meridian,
ID Ada Co. United States |
S Wayfinder Ave. / W Cobalt Dr. (43.60115, -116.42905) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2017-2018). |
Missoula,
MT Missoula Co. United States |
Mullan Rd. / Mary Jane Blvd. (46.88725, -114.05372) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | Year Completed estimated (2022-2023). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. / Grove Dr. (53.55573, -113.86097) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / Copperhaven Dr. / Harvest Ridge Dr. (53.55575, -113.95196) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2018 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Grove Dr. W / (unknown) (53.55467, -113.95664) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2016-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd. (Range Road 271) / Fenwyck Blvd. (53.55121, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Spruce Grove,
AB Division 11 Canada |
Pioneer Rd (Range Road 271) / (unknown) (53.54856, -113.86090) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / 218th St. NW (53.52741, -113.69339) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / Secord Blvd. NW (53.52657, -113.70582) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2020). |
Edmonton,
AB Division 11 Canada |
92nd Ave. NW / (unknown) (53.52650, -113.70143) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | Year Completed estimated (2017-2019). |
Edmonton,
AB Division 11 Canada |
Glastonbury Blvd. NW / Granville Dr. NW (53.50464, -113.68570) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2020). |
Edmonton,
AB Division 11 Canada |
Terwillegar Blvd. NW / Towne Centre Blvd. (53.44467, -113.57784) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.0000 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2000-2004). |
Langford,
BC Capital Canada |
Millstream Rd. / Bear Mountain Pkwy. (48.47140, -123.50526) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
Everett,
WA Snohomish Co. United States |
Riverfront Blvd. / 29th Ave. SE / 44th St. SE (47.95950, -122.19112) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2020 | |
Arlington,
WA Snohomish Co. United States |
236th St. NE / 19th Ave. NE (48.20959, -122.20491) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2021 | https://www.236safetyimprovements.org/project-updates |
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Giratoire du Montcel: D3088 / Rue Jean Moulin (45.41269, 4.37259) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Other (At-Grade) Single-Lane |
||
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Rue Jean Moulin / D201 SB Ramps (45.41473, 4.37340) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
||
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
D3088 / Rue des Cytises (45.40995, 4.36446) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.0000 |
Other (At-Grade) Single-Lane |
||
La Ricamarie,
Auvergne-Rhône-Alpes Loire France |
Giratoire Saint-Pierre: D3088 / Rue Jean-Pierre Blachier (45.40503, 4.35636) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Single-Lane |
||
Canton of Le Chambon-Feugerolles,
Auvergne-Rhône-Alpes Loire France |
Giratoire Marseille: D3088 / Rue des Combes (45.40350, 4.35046) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 58.0000 |
Other (At-Grade) Single-Lane |
||
Canton of Le Chambon-Feugerolles,
Auvergne-Rhône-Alpes Loire France |
Giratoire du Marais: D88 / D3088 / Rue Maxime Gorki (45.39920, 4.34445) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways 75.0000 |
Other (At-Grade) Single-Lane |
||
Canton of Le Chambon-Feugerolles,
Auvergne-Rhône-Alpes Loire France |
Rue de l'Europe / Rue Jean Monnet (45.39593, 4.33334) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.0000 |
Other (At-Grade) Single-Lane |
||
Weddington,
NC Union Co. United States |
Weddington-Matthews Rd. (SR 1344) / Tilley Morris Rd. (SR 1345) / (school access) (35.05645, -80.73426) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | https://www.constructionjournal.com/projects/details/9adae8f3933146738feedddda9e51146.html |
Bowling Green,
MO Pike Co. United States |
US 61 Business / MO 161 / Court St (39.33344, -91.19504) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2022 | https://www.modot.org/roundabout-bowling-green |
Billings,
MT Yellowstone Co. United States |
Five Mile Rd. / Mary St. / (Billings Bypass) (45.84863, -108.42492) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2021 | https://www.yourbigsky.com/local-news-2/billings-bypass-project-roundabout-opening-on-november-24/ |
Cleves,
OH Hamilton Co. United States |
Cooper Ave. / (high school parking) (39.16904, -84.75329) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2016 | Painted splitter island on south leg. |
Westfield,
IN Hamilton Co. United States |
W 171st St. / Eagletown Rd. (40.03649, -86.19331) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | Opened March 2023. |
Cambridge,
ON Waterloo Canada |
Blenheim Rd. / Bismark Dr. (43.36041, -80.34133) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.0000 |
Other (At-Grade) Single-Lane |
2022 | https://www.cambridgetoday.ca/local-news/citys-newest-roundabout-unique-to-cambridge-west-development-5511610 |
Deptford,
NJ Gloucester Co. United States |
Salina Rd. / S College Dr. (39.77645, -75.12438) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | https://42freeway.com/roads/salina-road-roundabout-at-rowan-college-completed-traffic-signal-at-delsea-is-coming/ |
Roebling,
NJ Burlington Co. United States |
Cedar Ln. / Railroad Ave. (40.10521, -74.79512) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2017 | Previous control: Triangular intersection with yield signs. https://www.burlingtoncountytimes.com/story/news/2017/08/27/no-more-waiting-road-improvements/17642282007/ |
Cinnaminson,
NJ Burlington Co. United States |
Cinnaminson Ave. / Calhoun St. (39.98910, -75.01095) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2008 | Year Completed estimated (2007-2008). |
Cinnaminson,
NJ Burlington Co. United States |
Branch Pike / Burlington Pike (39.99064, -75.00752) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2008 | Inside shopping center. Year Completed estimated (2007-2008). |
Cinnaminson,
NJ Burlington Co. United States |
Riverton Rd. / Branch Pike / Parry Rd. (39.98818, -74.98070) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2017). |
Harrisburg,
PA Dauphin Co. United States |
Derry St. / Mulberry St. (40.26312, -76.86948) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | https://theburgnews.com/news/project-to-make-harrisburgs-mulder-square-safer-greener-nears-completion |
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 WB Exit Ramp (38.87982, -77.26743) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaces full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Oakton,
VA Fairfax Co. United States |
Nutley St. SW / I-66 EB Exit Ramp (38.87714, -77.26629) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2023 | Replaced full cloverleaf interchange. https://outside.transform66.org/about_the_project/project_sections/nutley.asp |
Oakton,
VA Fairfax Co. United States |
Saintsbury Dr. / (transit center parking lot) (38.87667, -77.26993) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2013 | Serves Metro station. Right-turn-only lanes on east and west legs. South leg stubbed. Year Completed estimated (2012-2014). |
Oakton,
VA Fairfax Co. United States |
Saintsbury Dr. / (transit center parking garage) (38.87600, -77.27317) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2013 | Serves Metro station. Right-turn-only lanes on northeast and southwest legs. Southeast leg stubbed. Year Completed estimated (2012-2014). |
Fairfax,
VA Fairfax Co. United States |
Patriot Cir. / Mason Pond Dr. (38.82981, -77.31152) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2008 | |
Cedar Rapids,
IA Linn Co. United States |
16th Ave. SE / 5th St. SE (41.97092, -91.65498) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2017-2019). |
Le Boulou,
Occitanie Pyrénées-Orientales France |
D115 / A9-E15 Ramps / El place (42.52147, 2.81713) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
||
Saint-Jean-Pla-de-Corts,
Occitanie Pyrénées-Orientales France |
D115 / D900 (42.52064, 2.80619) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Le Boulou,
Occitanie Pyrénées-Orientales France |
Rond-Point de l'Ordre National du Mérite: D115 / D618 / Boulevard du Maréchal Foch / Zone de l'Autoport / Route de Céret (42.52102, 2.82225) |
Roundabout Existing |
All-Way Yield Unknown |
6 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Saint-Jean-Pla-de-Corts,
Occitanie Pyrénées-Orientales France |
D900 / (unknown) (42.52540, 2.80615) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Saint-Jean-Pla-de-Corts,
Occitanie Pyrénées-Orientales France |
Rond-Point de Saint-Sébastien: D115 / D13 / Rue Résidences du Soleil (42.51471, 2.78701) |
Roundabout Existing |
All-Way Yield Unknown |
5 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
Middletown,
DE New Castle Co. United States |
Brick Mill Rd. / Dove Run Centre Dr. (39.45413, -75.68672) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2022 | |
Baton Rouge,
LA East Baton Rouge Par. United States |
The Grove Blvd. / (parking) (30.38708, -91.07573) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2018 | |
Cabocan,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / (unknown) (16.60403, -22.91096) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Cabocan,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / (unknown) (16.61556, -22.91791) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Palha Verde,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 (16.62934, -22.91696) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Murdeira,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / (unknown) (16.66781, -22.93239) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 1 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Murdeira,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / (unknown) (16.67908, -22.93371) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Ribeira Funda,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 (16.70636, -22.93886) |
Roundabout Existing |
All-Way Yield Unknown |
2 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Espargos,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / (airport entrance) (16.73751, -22.94333) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Espargos,
Sal Nossa Senhora Das Dores Cape Verde |
EN1-SL-01 / EN3-SL-02 (16.74832, -22.94418) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
||
Denham Springs,
LA Livingston Par. United States |
Lockhart Rd. / Dunn Rd. (30.50500, -90.92494) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2020 | Year Completed estimated (2019-2021). |
Covington,
LA St. Tammany Par. United States |
Ochsner Blvd. / S Ochsner Blvd. (30.45565, -90.15060) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2012 | Year Completed estimated (2011-2012). South leg added 2019-2022. |
Covington,
LA St. Tammany Par. United States |
River Chase Dr. / Continental Dr. (30.43874, -90.12867) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2014). Southwest leg stubbed. |
Snellville,
GA Gwinnett Co. United States |
Wisteria Dr. / Clower St. (33.85952, -84.01452) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2023 | |
West Dundee,
IL Kane Co. United States |
Millbrook Dr. / (unknown) / (parking) (42.14551, -88.34157) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2013 | Year Completed estimated (2013-2015). |
Malta,
NY Saratoga Co. United States |
Stonebreak Rd. / Luther Forest Blvd. (42.96551, -73.75795) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2012 | Add-lane right-turn bypass lane on southeast leg. Year Completed estimated (2011-2013). Southeast leg added 2015-2018. |
Troy,
NY Rensselaer Co. United States |
US 4 (N Greenbush Rd.) / Williams Rd. (Rte 136) / Glenmore Rd. (42.69219, -73.68692) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | Yield-controlled right-turn bypass lanes on north and east legs. Year Completed estimated (2021-2022). |
Cohoes,
NY Albany Co. United States |
Preston Dr. / Stacey Ct. (42.77582, -73.74557) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2013-2015). |
Jenks,
OK Tulsa Co. United States |
S 1st St. / (parking) (36.01555, -95.96640) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2017 | At-grade rail crossing approximately 270 ft on northwest leg. Year Completed estimated (2016-2017). |